Asphalt Paving GC Exam UPDATED ACTUAL Exam Questions and CORRECT Answers Base Course - CORRECT ANSWER - Layer or layers of specified material of designated thickness or rate of application based on a subbase or subgrade to support the subsequent layers Bridge - CORRECT ANSWER - Over a depression; longer than 20' The subgrade is the top _______ of roadbed upon which the pavement structure and shoulders are constructed - CORRECT ANSWER - 18"

Show more Read less
Institution
Asphalt
Course
Asphalt

Content preview

Asphalt Paving GC Exam UPDATED
ACTUAL Exam Questions and CORRECT
Answers
Base Course - CORRECT ANSWER - Layer or layers of specified material of designated
thickness or rate of application based on a subbase or subgrade to support the subsequent layers


Bridge - CORRECT ANSWER - Over a depression; longer than 20'


The subgrade is the top _______ of roadbed upon which the pavement structure and shoulders
are constructed - CORRECT ANSWER - 18"



Do not use glass in the top _____ of the embankment - CORRECT ANSWER - 18"


Clear and grub minimum of ____ from each edge of proposed pavement along both lanes and
legs of interchange - CORRECT ANSWER - 30'


Where clearing and grubbing within the roadway is indicated at a bridge site, clear by cutting all
trees, stumps, etc. to within ______ of the ground or to low water in the full width of the ROW
for a distance of 75' beyond the beginning and end of the proposed bridge - CORRECT
ANSWER - 8"


Compact the subgrade between the lines ____ inches outside the area occupied by the pavement
structure, including C&G & SW to not less than 95% of max density - CORRECT
ANSWER - 18"


Pulverize base course material so that the completion of the moist mixing 100% (by dry weight)
passes the 1.5" sieve and a minimum of _____ passes the #4 sieve, exclusive of gravel and stone
retained on the sieve - CORRECT ANSWER - 80%



#4 sieve - CORRECT ANSWER - 4.75 mm

,Ensure finished surface of base varies neither than 3/8" from a straight edge 10' long when
applied parallel to the CL of the rd, no more than ______ inch from the typical cross-section on
the plans - CORRECT ANSWER - 1/2"


Thickness of completed modified base is measured at staggered intervals not to exceed _____
feet in length for two-lane roads - CORRECT ANSWER - 250'



Use _______ in all base courses as an anti-stripping additive - CORRECT ANSWER -
hydrated lime


Where plans required uniform thickness of base course and the contract provides for pavement
on sq yd bases, thickness of base course is determined from measurements taken of the
completed base course at intervals not exceeding _____ feet for two-lane roads - CORRECT
ANSWER - 500'


For HMA, use aggregates with a combined specific gravity of _____ or less - CORRECT
ANSWER - 2.90


ON HMA use pneumo-rollers that are self propelled and have an effective rolling width of not
less than _______ - CORRECT ANSWER - 60"


Ensure intermediate rolling of HMA is completed before mat temp drops below _____ -
CORRECT ANSWER - 175 degrees



First step in applying asphalt surface treatment (single) - CORRECT ANSWER - Clean
surface


Last step in applying asphalt surface treatment (single) - CORRECT ANSWER - Remove
excess aggregate

, Spread aggregate for HMA within _____ feet of the application of the emulsion - CORRECT
ANSWER - 200'


Place asphalt surface treatment (double) within ____ days of the base course being primed -
CORRECT ANSWER -7


When rolling aggregate applications for asphalt surface treatment (double) on each trip of the
roller, overlap prior by _____ the width of the roller - CORRECT ANSWER - 1/2


On portland cement pavement, position lower surface of preformed joint filler on or below
surface of base while upper surface is _____ inches below surface of the slab - CORRECT
ANSWER - 1/2"


When using surface vibrators on portland concrete, ensure frequency is not less than ______
impulses per minute - CORRECT ANSWER - 3500


Construct subbase and base beneath concrete pavement to include area _____ inches in width
extending beyond edges to provide stability for paver tracks - CORRECT ANSWER - 18"



Min. width of any reinforced concrete slab is ______ feet - CORRECT ANSWER - 16'



Max. length of any reinforced concrete slab is ______ feet - CORRECT ANSWER - 20'


Exclude all vehicle traffic from newly constructed concrete pavement for a period of not less
than ______ days - CORRECT ANSWER - 14


Finish joints should not deviate more than ____ inch in the horizontal alignment from a straight
line - CORRECT ANSWER - 1/4"


Make transverse construction joints whenever placing of concrete is suspended longer than
_____ minutes - CORRECT ANSWER - 30 minutes

Written for

Institution
Asphalt
Course
Asphalt

Document information

Uploaded on
April 17, 2025
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1143
Member since
2 year
Number of followers
104
Documents
69677
Last sold
3 hours ago
MGRADES (Genius Brains)

Welcome to MGRADES Exams, practices and Study materials The work speaks for itself Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

180 reviews

5
78
4
31
3
47
2
9
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions