100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CSI CDT Exam Questions And Answers |Latest 2025 | Guaranteed Pass

Rating
-
Sold
3
Pages
22
Grade
A+
Uploaded on
16-04-2025
Written in
2024/2025

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 1 CSI CDT Exam Questions And Answers |Latest 2025 | Guaranteed Pass Owner - AnswerPrinciple stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - AnswerProtect public health, safety and welfare Design Team - AnswerAddress planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - AnswerEntity that constructs a facility. Uses management abilities to gather labor forces, subs, and material/product/equipment suppliers Supplier Team - AnswerFurnishes the materials and products for the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier. Facility Life Cycle - AnswerThe life cycle of a facility, from concept through construction to use and eventual deconstruction. Project Conception Project Delivery Design Construction Documents Procurement (Bidding/Negotiating/Purchasing) ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 2 Construction Facility Management Project Conception - AnswerTransforms the needs of owner into clear concept on which project can be designed. Feasibility Study, Programming, Site Selection, Budgeting. Project Delivery - AnswerDetermine delivery method to be used. Factors - qualifications, experience, capacity, project extent, time requirements. Design - AnswerTwo Phases: schematic design and design development. Deliverables include graphic and written design documents and estimates of project cost. Schematic Design - AnswerOverall relationships and functions. Site plan and area, general size/shape/massing of elements, elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic drawings, probable cost, preliminary schedules Design Development - AnswerTechnical issues of constructibility and integration of systems and components. Deliverables - Tech information, outline specifications, updated schedule, updated cost estimate. Construction Documents - AnswerDefined as the written and graphic documents prepared or assembled by the A/E for communicating the project design for construction and administering the construction contract. Construction documents include two major types of documents: Procurement documents and Contract documents. Procurement (Bidding/Negotiating/Purchasing) - AnswerAcceptance of the contractor's bid or negotiated sum and other conditions will result in award of a contract and commencement of work. ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 3 Construction - AnswerResponsibilities: Contractor - perform work, project coordination, comply with project documents. A/E - construction admin, evaluation services, certify application for payment, final inspection of work. Owner - provide information, process payments, approve contract modifications, accept project upon completion. Facility Management - AnswerDuring occupancy, owners & facility managers maintain and evaluate the performance of the project and determine suitability for continuing use. OmniClass - AnswerA multi-table informational framework for organizing information used by the architectural, engineering, and construction industry. UniFormat - AnswerUniform classification system for organizing preliminary construction information into a standard order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design. Element Identification. MasterFormat - AnswerArranges related construction practices, logical groupings of work results, into a series of divisions. 50 division format. Used for Specifications, data organization, and cost classification. MasterFormat Groups - Answer00 Procurement and Contracting Requirement Group Specifications Group - General Requirements 01 - Facility Construction Subgroup (concrete) - Facility Services (plumbing/HVAC) - Site and Infrastructure (Earthwork) - Process Equipment (WW equipment)

Show more Read less
Institution
CSI CDT
Course
CSI CDT










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CSI CDT
Course
CSI CDT

Document information

Uploaded on
April 16, 2025
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+




CSI CDT Exam Questions And Answers
|Latest 2025 | Guaranteed Pass




Owner - Answer✔Principle stakeholder - initiates project, assumes risk, provides funding



AHJ - Authorities Having Jurisdiction - Answer✔Protect public health, safety and welfare



Design Team - Answer✔Address planning issues, determine design program, identify codes and
regulations, produce procurement and construction documents, administer construction
contract, *provide QA/QC procedures*



Contractor Team - Answer✔Entity that constructs a facility. Uses management abilities to
gather labor forces, subs, and material/product/equipment suppliers



Supplier Team - Answer✔Furnishes the materials and products for the facility to be
constructed. Fabricator, Distributor, Manufacturer, Supplier.



Facility Life Cycle - Answer✔The life cycle of a facility, from concept through construction to use
and eventual deconstruction.
Project Conception
Project Delivery
Design
Construction Documents
Procurement (Bidding/Negotiating/Purchasing)

1

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+


Construction
Facility Management



Project Conception - Answer✔Transforms the needs of owner into clear concept on which
project can be designed. Feasibility Study, Programming, Site Selection, Budgeting.



Project Delivery - Answer✔Determine delivery method to be used. Factors - qualifications,
experience, capacity, project extent, time requirements.



Design - Answer✔Two Phases: schematic design and design development. Deliverables include
graphic and written design documents and estimates of project cost.



Schematic Design - Answer✔Overall relationships and functions. Site plan and area, general
size/shape/massing of elements, elevations and exteriors established, conceptual design
criteria identified.
Deliverables - schematic drawings, probable cost, preliminary schedules



Design Development - Answer✔Technical issues of constructibility and integration of systems
and components.
Deliverables - Tech information, outline specifications, updated schedule, updated cost
estimate.



Construction Documents - Answer✔Defined as the written and graphic documents prepared or
assembled by the A/E for communicating the project design for construction and administering
the construction contract. Construction documents include two major types of documents:
Procurement documents and Contract documents.



Procurement (Bidding/Negotiating/Purchasing) - Answer✔Acceptance of the contractor's bid or
negotiated sum and other conditions will result in award of a contract and commencement of
work.


2

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+


Construction - Answer✔Responsibilities:
Contractor - perform work, project coordination, comply with project documents.
A/E - construction admin, evaluation services, certify application for payment, final inspection
of work.
Owner - provide information, process payments, approve contract modifications, accept project
upon completion.



Facility Management - Answer✔During occupancy, owners & facility managers maintain and
evaluate the performance of the project and determine suitability for continuing use.



OmniClass - Answer✔A multi-table informational framework for organizing information used by
the architectural, engineering, and construction industry.



UniFormat - Answer✔Uniform classification system for organizing preliminary construction
information into a standard order or sequence on the basis of systems or assemblies.
Particularly useful in conceptual design. Element Identification.



MasterFormat - Answer✔Arranges related construction practices, logical groupings of work
results, into a series of divisions. 50 division format. Used for Specifications, data organization,
and cost classification.



MasterFormat Groups - Answer✔00 Procurement and Contracting Requirement Group


Specifications Group
- General Requirements 01
- Facility Construction Subgroup (concrete)
- Facility Services (plumbing/HVAC)
- Site and Infrastructure (Earthwork)
- Process Equipment (WW equipment)


3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brightstars Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
194
Member since
1 year
Number of followers
7
Documents
12191
Last sold
3 days ago
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3.3

31 reviews

5
10
4
4
3
8
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions