1
PTCB CSPT EXAM (2025) ACTUAL EXAM
comprehensive questions and verified accurate
solution (Detailed & Elaborated) |get it 100%
accurate!! 2025 TEST!!
Patient harmed by compounded sterile preparations - (answers)microbial
contamination, excessive bacterial endotoxins, variability in strength of
ingredients, chemical/physical contaminants, inappropriate quality of ingredients
non sterile compounding examples - (answers)products used orally, topically on
skin or to fill gaps when not commercially available
aesptic - (answers)state of being free from microbial contamination
sterile compounded items - (answers)injections(iv, etc) ophthalmic drops,
aqueous bronchial or nasal inhalations, baths for live organs, tissue implants,
irrigation for wounds or cavities
Non hazardous hoods - (answers)Laminar airflow workbench (LAFW)
compounding containment isolator (CAI)
Hazardous hoods - (answers)biological safety cabinet (BSC) compounding aseptic
containment isolator (CACI)
Primary Engineering Control (PEC) - (answers)a device or room that provides an
ISO Class 5 environment for the exposure of critical sites when compounding
, 2
CSPs. Such devices include, but may not be limited to, laminar airflow
workbenches (LAFWs), biological safety cabinets (BSCs), compounding aseptic
isolators (CAIs), and compounding aseptic containment isolators (CACIs).
secondary engineering controls - (answers)the ante area and buffer area
Buffer or Clean Room - (answers)ISO 7
Ante Room ISO class - (answers)ISO 8, unless provides access to negative pressure
room then ISO 7
vertical hood - (answers)hazardous compounding-air flows vertically
Horizontal Hood - (answers)air flows horizontally across the work area from back
to front
Direct Compounding Area (DCA) - (answers)- a critical area within the hood (ISO
Class 5) where areas are exposed to filtered air; also known as "first air"
Negative Pressure room - (answers)Hazardous materials
High-efficiency particulate air (HEPA) filters - (answers)remove microbes > 0.3
micrometers
, 3
Ante Room - (answers)washing, garbing, product decontamination
Buffer area air change per hour (APCH) - (answers)30 exchanges per hour
ante room air change per hour (APCH) - (answers)ISO 8-20 per hour ISO 7- 30 per
hour
Cleaning of compounding area - (answers)germicidal detergent & water for visible
solids, 70% isopropyl alcohol
ISO Class 5 PEC cleaned - (answers)beginning of each shift, before each batch,
every 30 minus when compounding, after spills, contamination
Cleaning of Counters and floors of specific sites - (answers)daily
Cleaning Walls, ceilings, storage shelving: - (answers)monthly
Suface sampling frequency - (answers)every 6 months or significant changes in
procedure
Temperature of CSP areas - (answers)room temperature 20'C(68'F) or cooler
PTCB CSPT EXAM (2025) ACTUAL EXAM
comprehensive questions and verified accurate
solution (Detailed & Elaborated) |get it 100%
accurate!! 2025 TEST!!
Patient harmed by compounded sterile preparations - (answers)microbial
contamination, excessive bacterial endotoxins, variability in strength of
ingredients, chemical/physical contaminants, inappropriate quality of ingredients
non sterile compounding examples - (answers)products used orally, topically on
skin or to fill gaps when not commercially available
aesptic - (answers)state of being free from microbial contamination
sterile compounded items - (answers)injections(iv, etc) ophthalmic drops,
aqueous bronchial or nasal inhalations, baths for live organs, tissue implants,
irrigation for wounds or cavities
Non hazardous hoods - (answers)Laminar airflow workbench (LAFW)
compounding containment isolator (CAI)
Hazardous hoods - (answers)biological safety cabinet (BSC) compounding aseptic
containment isolator (CACI)
Primary Engineering Control (PEC) - (answers)a device or room that provides an
ISO Class 5 environment for the exposure of critical sites when compounding
, 2
CSPs. Such devices include, but may not be limited to, laminar airflow
workbenches (LAFWs), biological safety cabinets (BSCs), compounding aseptic
isolators (CAIs), and compounding aseptic containment isolators (CACIs).
secondary engineering controls - (answers)the ante area and buffer area
Buffer or Clean Room - (answers)ISO 7
Ante Room ISO class - (answers)ISO 8, unless provides access to negative pressure
room then ISO 7
vertical hood - (answers)hazardous compounding-air flows vertically
Horizontal Hood - (answers)air flows horizontally across the work area from back
to front
Direct Compounding Area (DCA) - (answers)- a critical area within the hood (ISO
Class 5) where areas are exposed to filtered air; also known as "first air"
Negative Pressure room - (answers)Hazardous materials
High-efficiency particulate air (HEPA) filters - (answers)remove microbes > 0.3
micrometers
, 3
Ante Room - (answers)washing, garbing, product decontamination
Buffer area air change per hour (APCH) - (answers)30 exchanges per hour
ante room air change per hour (APCH) - (answers)ISO 8-20 per hour ISO 7- 30 per
hour
Cleaning of compounding area - (answers)germicidal detergent & water for visible
solids, 70% isopropyl alcohol
ISO Class 5 PEC cleaned - (answers)beginning of each shift, before each batch,
every 30 minus when compounding, after spills, contamination
Cleaning of Counters and floors of specific sites - (answers)daily
Cleaning Walls, ceilings, storage shelving: - (answers)monthly
Suface sampling frequency - (answers)every 6 months or significant changes in
procedure
Temperature of CSP areas - (answers)room temperature 20'C(68'F) or cooler