100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SAFe POPM (2025) comprehensive questions and verified detailed solutions (MULTIPLE CHOICES) |complete solutions |A+ GRADED |100% CORRECT!!

Rating
-
Sold
-
Pages
37
Grade
A+
Uploaded on
09-04-2025
Written in
2024/2025

SAFe POPM (2025) comprehensive questions and verified detailed solutions (MULTIPLE CHOICES) |complete solutions |A+ GRADED |100% CORRECT!!

Institution
SAFe POPM
Course
SAFe POPM











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SAFe POPM
Course
SAFe POPM

Document information

Uploaded on
April 9, 2025
Number of pages
37
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

4/9/25, 10:21 PM SAFe POPM (2025) comprehensive questions and verified detailed solutions (MULTIPLE CHOICES) |complete solutions |A+ …




SAFe POPM (2025) comprehensive questions
and verified detailed solutions (MULTIPLE
CHOICES) |complete solutions |A+ GRADED
|100% CORRECT!!

Save




Terms in this set (82)


What is one benefit of A) Fast learning cycles
constant customer
feedback?
A) Fast learning cycles
B) It reduces the need for
face-to-face
collaboration
C) Teams can better align
working days with a
customer's schedule
D) It reduces the amount
of changes to the
Features




https://quizlet.com/1029489611/safe-popm-2025-comprehensive-questions-and-verified-detailed-solutions-multiple-choices-complete-solutions-a… 1/37

,4/9/25, 10:21 PM SAFe POPM (2025) comprehensive questions and verified detailed solutions (MULTIPLE CHOICES) |complete solutions |A+ …


Which statement D) It synchronizes alignment, collaboration, and
describes the Scaled delivery for large numbers of teams
Agile Framework?
A) It scales Scrum to
multiple Agile Teams
B) It provides guidelines
for Project Managers
C) It provides strict
guidelines for all daily
activities
D) It synchronizes
alignment, collaboration,
and delivery for large
numbers of teams

The Work-in-Process limit C) Business Owners
at the Analyzing step of D) System Architects
the Program Kanban is
based on the overall
availability of Product
Management, other
subject matter experts,
and the capacity of which
two other roles? (Choose
two.)
A) Lean Agile Center of
Excellence
B) Release Train Engineer
C) Business Owners
D) System Architects
E) Agile Portfolio
Operations




https://quizlet.com/1029489611/safe-popm-2025-comprehensive-questions-and-verified-detailed-solutions-multiple-choices-complete-solutions-a… 2/37

,4/9/25, 10:21 PM SAFe POPM (2025) comprehensive questions and verified detailed solutions (MULTIPLE CHOICES) |complete solutions |A+ …


Features in Program B) Splitting Epics or Capabilities
Backlogs can result from
what?
A) Decomposing Enabler
Stories
B) Splitting Epics or
Capabilities
C) Aggregating stories
into Features
D) Refining the Team
Backlog

Which statement is true A) It supports SAFe Lean-Agile Principle #3 -
about fast feedback? Assume variability, preserve options
A) It supports SAFe
Lean-Agile Principle #3 -
Assume variability,
preserve options
B) The shorter the
feedback cycle, the
higher the utilization
C) It accelerates planning
and delivery
D) Smaller batch sizes
enable faster feedback
loops

Which two types of items B) Enabler Stories
are maintained in the C) User Stories
Team Backlog? (Choose
two.)
A) Business Epics
B) Enabler Stories
C) User Stories
D) PI Objectives
E) Epic Enablers




https://quizlet.com/1029489611/safe-popm-2025-comprehensive-questions-and-verified-detailed-solutions-multiple-choices-complete-solutions-a… 3/37

, 4/9/25, 10:21 PM SAFe POPM (2025) comprehensive questions and verified detailed solutions (MULTIPLE CHOICES) |complete solutions |A+ …


A Lean Business Case can D) Distribution
identify the impact on E) Deployment
sales and which other
two areas? (Choose two.)
A) Profit
B) Architecture
C) Decomposition
D) Distribution
E) Deployment

Product Managers are B) Capacity allocation
expected to collaborate
in planning the amount of
upcoming Enabler work
by establishing what?
A) Team Backlog
prioritization
B) Capacity allocation
C) Accurate user story
sizing
D) Completed Epic
acceptance criteria




https://quizlet.com/1029489611/safe-popm-2025-comprehensive-questions-and-verified-detailed-solutions-multiple-choices-complete-solutions-a… 4/37

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CodedNurse Nightingale College
View profile
Follow You need to be logged in order to follow users or courses
Sold
3802
Member since
1 year
Number of followers
21
Documents
8900
Last sold
3 days ago
coded

"I specialize in key academic areas such as Psychology, Nursing, Human Resource Management, and Mathematics. Providing students with top-quality work is my priority, and I always uphold the highest scholarly standards. This commitment has earned me the distinction of being a Gold-Rated Tutor on Stuvia. You can trust my work to help you achieve excellent grades!"

3.4

66 reviews

5
19
4
15
3
16
2
3
1
13

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions