ICC California UST Service Technician
1. UDC was required at time of installation for all systems January 1, 2000
installed after?
2. July 1, 2005, service techs shall possess or work under ICC UST Service Technician
someone who has a current certification indicating he Exam
or she has passed the?
@#$%^&*(
3. ICC cert must be renewed every? 24 months )
4. Service techs must possess or be employed by a per- The individual has a tank
son who has the appropriate contractor's license un- testing license
less?
5. Service tech is defined by any individual who? Tests UST monitor-
ing equipment, trou-
ble shoots UST systems,
and/or installs UST moni-
toring equipment.
6. If the manufacturer training no longer exist, the local Approve comparable al-
agency may? ternate training .
7. UST includes? Tank and connected pip-
ing
8. What is considered a UST? A petroleum underground
storage tank.
9. What UST system meets the requirements for sec- Doubled wall tanks
ondary containment?
10. According to title 23; the following piping components Pressured product piping
if installed after July 1, 1987 must have secondary
containment.
, ICC California UST Service Technician
11. What is considered "pipe" on tanks installed after July Pressured product piping
1, 2003? and below ground vapor
recovery.
12. Under dispenser containment (UDC) was required for December 31, 2003
all existing UST systems by
@#$%^&*(
)
13. What system is for exchanging gas vapors in a storage Stage 1 vapor recovery
tank and product in a fuel delivery truck
14. Which approved method for non-visual monitoring Statistical Inventory Rec-
for existing UST systems. onciliation (SIR)
15. ATG must be capable for detecting a release of? 0.2 gallons per hour
16. What is no longer an approved method for non-visual Manual inventory recon-
monitoring on existing UST systems? ciliation.
17. Automatic line leak detectors installed on under- 3 gallons per hour at 10
ground piping with secondary containment shall be psi
capable of detecting a leak of ?
18. How often should ATG be programmed to test the At least monthly
tank?
19. According to PEI RP 300, a combustible gas can be Detect vapor leaks in a va-
used to? por recovery system.
20. According to PEI RP 300, a written scope of work for Construction plans
vapor recovery installation should include?
21. Positive shut off overfill protection device must stop 95% full
the flow of fuel when the tank is no more then?
, ICC California UST Service Technician
22. According to Executive Order (EO) VR 201-A , what Depended filter seal dam-
could cause a nozzle shut off mechanism or malfunc- age
tion?
23. According to VR 201-A, breakaway reconnection must Logged in GDF log
be?
24. According to PEI RP 300 what is an INCORRECT Sketching a diagram on
method of documenting piping location? the inside cover of vapor
recovery equipment man-
ual
25. According to PEI RP 300 as built drawing or pictures of maintained as long as UST
the underground pipping and other components shall is in service.
be .
26. According to EO VR 101-E maintenance records are Name and Designated
required to include what? UST Operator.
27. The Phil-Tite EVR Phase 1 system require that vapor Used with no more than 3
vent pipes at any UST system be p/v valves
28. According to EO VR 2010 after installing a new spout Nozzle dispensing shut ott
assembly in the Healy 900 nozzle the following test test
must be conducted?
29. According to Healy EO VR 201-A a vapor recovery Gasoline dispensing facil-
record is to be maintained by? ity operator(GDF)
30. An enhanced leak detection test is required within 1000 feet
how many feet of a public drinking well?
31. What are the components of the Fire Triangle? Fuel, Heat/Ignition
Source, Oxygen
1. UDC was required at time of installation for all systems January 1, 2000
installed after?
2. July 1, 2005, service techs shall possess or work under ICC UST Service Technician
someone who has a current certification indicating he Exam
or she has passed the?
@#$%^&*(
3. ICC cert must be renewed every? 24 months )
4. Service techs must possess or be employed by a per- The individual has a tank
son who has the appropriate contractor's license un- testing license
less?
5. Service tech is defined by any individual who? Tests UST monitor-
ing equipment, trou-
ble shoots UST systems,
and/or installs UST moni-
toring equipment.
6. If the manufacturer training no longer exist, the local Approve comparable al-
agency may? ternate training .
7. UST includes? Tank and connected pip-
ing
8. What is considered a UST? A petroleum underground
storage tank.
9. What UST system meets the requirements for sec- Doubled wall tanks
ondary containment?
10. According to title 23; the following piping components Pressured product piping
if installed after July 1, 1987 must have secondary
containment.
, ICC California UST Service Technician
11. What is considered "pipe" on tanks installed after July Pressured product piping
1, 2003? and below ground vapor
recovery.
12. Under dispenser containment (UDC) was required for December 31, 2003
all existing UST systems by
@#$%^&*(
)
13. What system is for exchanging gas vapors in a storage Stage 1 vapor recovery
tank and product in a fuel delivery truck
14. Which approved method for non-visual monitoring Statistical Inventory Rec-
for existing UST systems. onciliation (SIR)
15. ATG must be capable for detecting a release of? 0.2 gallons per hour
16. What is no longer an approved method for non-visual Manual inventory recon-
monitoring on existing UST systems? ciliation.
17. Automatic line leak detectors installed on under- 3 gallons per hour at 10
ground piping with secondary containment shall be psi
capable of detecting a leak of ?
18. How often should ATG be programmed to test the At least monthly
tank?
19. According to PEI RP 300, a combustible gas can be Detect vapor leaks in a va-
used to? por recovery system.
20. According to PEI RP 300, a written scope of work for Construction plans
vapor recovery installation should include?
21. Positive shut off overfill protection device must stop 95% full
the flow of fuel when the tank is no more then?
, ICC California UST Service Technician
22. According to Executive Order (EO) VR 201-A , what Depended filter seal dam-
could cause a nozzle shut off mechanism or malfunc- age
tion?
23. According to VR 201-A, breakaway reconnection must Logged in GDF log
be?
24. According to PEI RP 300 what is an INCORRECT Sketching a diagram on
method of documenting piping location? the inside cover of vapor
recovery equipment man-
ual
25. According to PEI RP 300 as built drawing or pictures of maintained as long as UST
the underground pipping and other components shall is in service.
be .
26. According to EO VR 101-E maintenance records are Name and Designated
required to include what? UST Operator.
27. The Phil-Tite EVR Phase 1 system require that vapor Used with no more than 3
vent pipes at any UST system be p/v valves
28. According to EO VR 2010 after installing a new spout Nozzle dispensing shut ott
assembly in the Healy 900 nozzle the following test test
must be conducted?
29. According to Healy EO VR 201-A a vapor recovery Gasoline dispensing facil-
record is to be maintained by? ity operator(GDF)
30. An enhanced leak detection test is required within 1000 feet
how many feet of a public drinking well?
31. What are the components of the Fire Triangle? Fuel, Heat/Ignition
Source, Oxygen