The goals in the needs analysis step of network design are exactly the same when
designing LANs vs. When designing WANs.
True.
False. - Answers :False
Today, many organizations design networks using the building-block approach.
True
False - Answers :True
Estimating the size and type of the "standard" and
"advanced" network circuits is called_________.
• needs categorization
• turnpike design
• cost assessment
• capacity planning
• soliciting RFPs - Answers :Capacity planning
The large network purchases are done:
• before the vendors) are selected
• before the RFP is sent out
after the RFP is sent out, but before the vendor(s) are selected
• after the vendors) are selected
after the network has been implemented - Answers :after the vendor(s) are selected
The building block design approach is sometimes called:
A) wide and shallow
B) narrow and deep
C) wide and deep
D) narrow and shallow - Answers :B) narrow and deep
_________is an estimate of the highest data volume
on a link.
A) Data mode
B) Backplane load
C) Peak circuit traffic
D) Leading edge data flow
E) Circuit transfer - Answers :C)Peak circuit traffic
, There are some network modeling tools that can_________the existing network.
A) discover
B) disassemble
C) sensitize
D) maintain
E) implement - Answers :A) Discover
According to one rule of thumb, circuit loading information is easy to gather.
percent of
A)50
B)25
C)80
D)19
E)20 - Answers :C) 80
Capacity planning is used to design circuit capacity.
True
False - Answers :True
In the technology design stage of network design,
A) the fundamental technology/protocols to be chosen have no relationship with the
circuit capacity
B) the decision for fundamental technology/protocols can be made without considering
circuit capacity
C) the decision for circuit capacity can be made without considering fundamental
technology/protocols
D) the decisions for fundamental technology/protocols and circuit capacity are
interrelated
E)the decision for fundamental technology/protocols and/or circuit capacities is not
made at this stage - Answers :D) the decisions for fundamental technology/protocols
and circuit capacity are interrelated
Once the needs have been defined in the logical network design, the next step is to
develop a(n)___________.
A) application
B) baseline
C) technology design
D turnpike design
E) backplane design - Answers :C) technology design
Which of the following would not be a type of circuit that needs to be considered when
planning for technology design capacity?
The goals in the needs analysis step of network design are exactly the same when
designing LANs vs. When designing WANs.
True.
False. - Answers :False
Today, many organizations design networks using the building-block approach.
True
False - Answers :True
Estimating the size and type of the "standard" and
"advanced" network circuits is called_________.
• needs categorization
• turnpike design
• cost assessment
• capacity planning
• soliciting RFPs - Answers :Capacity planning
The large network purchases are done:
• before the vendors) are selected
• before the RFP is sent out
after the RFP is sent out, but before the vendor(s) are selected
• after the vendors) are selected
after the network has been implemented - Answers :after the vendor(s) are selected
The building block design approach is sometimes called:
A) wide and shallow
B) narrow and deep
C) wide and deep
D) narrow and shallow - Answers :B) narrow and deep
_________is an estimate of the highest data volume
on a link.
A) Data mode
B) Backplane load
C) Peak circuit traffic
D) Leading edge data flow
E) Circuit transfer - Answers :C)Peak circuit traffic
, There are some network modeling tools that can_________the existing network.
A) discover
B) disassemble
C) sensitize
D) maintain
E) implement - Answers :A) Discover
According to one rule of thumb, circuit loading information is easy to gather.
percent of
A)50
B)25
C)80
D)19
E)20 - Answers :C) 80
Capacity planning is used to design circuit capacity.
True
False - Answers :True
In the technology design stage of network design,
A) the fundamental technology/protocols to be chosen have no relationship with the
circuit capacity
B) the decision for fundamental technology/protocols can be made without considering
circuit capacity
C) the decision for circuit capacity can be made without considering fundamental
technology/protocols
D) the decisions for fundamental technology/protocols and circuit capacity are
interrelated
E)the decision for fundamental technology/protocols and/or circuit capacities is not
made at this stage - Answers :D) the decisions for fundamental technology/protocols
and circuit capacity are interrelated
Once the needs have been defined in the logical network design, the next step is to
develop a(n)___________.
A) application
B) baseline
C) technology design
D turnpike design
E) backplane design - Answers :C) technology design
Which of the following would not be a type of circuit that needs to be considered when
planning for technology design capacity?