100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ISQS 3344 Exam 3- Lowell Lay TTU Questions and Answers 100% Solved

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
29-03-2025
Written in
2024/2025

ISQS 3344 Exam 3- Lowell Lay TTU Questions and Answers 100% Solved In assembly-line balancing, cycle time (the ratio of available production time to scheduled production) is the: Correct Answ_maximum time that a product is allowed at each workstation. For which of the following operations would a fixed-position layout be MOST appropriate? Correct Answ_constructing a highway tunnel

Show more Read less
Institution
ISQS...
Course
ISQS...

Content preview

ISQS 3344 Exam 3- Lowell Lay TTU
Questions and Answers 100% Solved

In assembly-line balancing, cycle time (the ratio of available production time to scheduled

production) is the: Correct Answ_maximum time that a product is allowed at each

workstation.




For which of the following operations would a fixed-position layout be MOST appropriate?

Correct Answ_constructing a highway tunnel




As tool using animals, human performance is affected by:

A. noise, illumination, vibration

B. temp, humidity, air quality

C. strength, reflexes, perception,

D. design of pedal, levers, and buttons.


E. All of the above Correct Answ_E. All of the above




Among the advantages of predetermined time standards are all EXCEPT which of the following?

Correct Answ_They can only be determined after work actually takes place.

, Flow diagrams are used to analyze: Correct Answ_movement of people or material.




Ethical work environment decisions by managers may be guided by which of the following?

A. state agencies

B. trade associations

C. insurers

D. employees


E. All of the above Correct Answ_E. All of the above




An advantage of work sampling is that: Correct Answ_the time spent observing the

employee is relatively short




Activity charts help analyze: Correct Answ_utilization of an operator and machine




A disadvantage of work sampling is that: Correct Answ_it tends to be less accurate,

particularly when task times are short.

Written for

Institution
ISQS...
Course
ISQS...

Document information

Uploaded on
March 29, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$15.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ARVEX

Also available in package deal

Thumbnail
Package deal
ISQS EXAM PACK WITH COMPLETE SOLUTIONS
-
7 2025
$ 119.93 More info

Get to know the seller

Seller avatar
ARVEX stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
10 months
Number of followers
0
Documents
2867
Last sold
2 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions