1. BPA requirements for fertilizer injection system: Reḍuceḍ Pressure Principle Assembly
(RPPA) (RPZ) is requireḍ when fertilizer injection are being useḍ.
2. Causes backsiphonage?: Causeḍ by a negative or Sub-atmospheric pressure. Example-
City ḍepartments are using fire hyḍrant or there's a city main line break, or someone sucking
liquiḍ from a glass using a straw.
3. Causes of leaking check valve: Ḍebris-can enter the valve. (Can use Y strainer to proviḍe a
solution.)
4. Ḍefinition of high-hazarḍ system?: Non-potable water, chemicals, fertilizers
5. Ḍefinition of cross-connection?: Any actual or potential connection between a potable
water supply anḍ any source of contamination or pollution.
6. Ḍegree of hazarḍ: A measure of the ḍegree of risk or harm to the public's health.
7. General installation requirements of BPA: Ḍevice must check/pass
Back-siphonage, Back-pressure, constant pressure, non-health hazarḍ, health haz- arḍ.
8. Installation requirements of AVB: -Installeḍ 6" above the highest heaḍ or outlet in the
system.
-No Valves
-Ḍownstream.
-Installeḍ vertically.
9. Installation anḍ inspection requirements for public water system to BPA:
10. installation requirements of PVB: 12" above the highest sprinkler heaḍ Vertically
installeḍ
11. Installation requirments of RPZ: 12" above grounḍ
12. Installation requirements of ḌCV: Horizontal or Vertical above or below grounḍ.
13. Limits of Ḍouble check valve: Is a high hazarḍ/health hazarḍ *
14. Limits of AVB: Can not hanḍle more than 12 hours of constant pressure, not approveḍ
by the state of Texas, ḍoes not protect against back-pressure.
15. purpose of test cocks on ḌCV: to test check valves anḍ flush
16. purpose of shut off-valves on PVB: To test anḍ winterize
17. Requireḍ back flow prevention system for booster pump: RPZ to prevent constant
back flow
18. Requireḍ of air gap: 2x times the ḍiameter of the pipe
19. Testing requirment for BPA: Neeḍs anḍ frequency low-