Verified by Experts
____ is a method for analyzing the time needed to complete each project task and identifying the
minimum amount of time needed to complete the total project. Correct Ans-C:Program
Evaluation Review Technique (PERT)
The goal of the ____ of the SDLC is to produce a list of requirements for a new or revised
information system. Correct Ans-B:analysis phase
In the accompanying figure, the ____ item represents a filing cabinet, disk, or tape that holds
data. Correct Ans-C:third
In the ____ of the SDLC, the project team must decide how the new system will fulfill the
requirements specified in the System Requirements Report. Correct Ans-A:design phase
Which of the following is TRUE with regard to turnkey systems? Correct Ans-B:They require
time and expertise to evaluate.
, A(n) ____ is a request for a formal price quotation on a list of hardware and software. Correct
Ans-C:RFQ
A(n) ____ is issued by a project team when it wants vendors to recommend hardware and
software for the solution they have chosen. Correct Ans-A:RFP
In the design phase of the SDLC, the project team ____. Correct Ans-D:all of the above
Software testing might reveal ____ (errors) in the software, which must be corrected by the
software developer. Correct Ans-D:bugs
____ is the process of modifying a commercial application to reflect the needs of a particular
organization. Correct Ans-A:Software customization
____ testing is performed to ensure that software modules operate together correctly. Correct
Ans-C:Integration
The three key concepts that ensure good quality of service from a computer system include all of
the following EXCEPT ____. Correct Ans-B:cost