100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CPESC Questions and Answers 100% Solved

Rating
-
Sold
-
Pages
64
Grade
A+
Uploaded on
26-03-2025
Written in
2024/2025

CPESC Questions and Answers 100% Solved Water quality standards must do the following Include provisions for restoring and maintaining the chemical, physical and biological integrity of state waters Achieve a level of water quality that provides for the protection and propogration of fish, shellfish and wildlife and recreation in an on the water Consider the use and value of state waters for public water supplies, propagation of fish and wildlife, recreation, agriculture and navigation

Show more Read less
Institution
CPESC...
Course
CPESC...

Content preview

CPESC Questions and Answers 100% Solved


Water quality standards must do the following Include provisions for restoring and

maintaining the chemical, physical and biological integrity of state waters




Achieve a level of water quality that provides for the protection and propogration of fish,

shellfish and wildlife and recreation in an on the water




Consider the use and value of state waters for public water supplies, propagation of fish and

wildlife, recreation, agriculture and navigation




TMDL Total Maximum Daily Loads


define the amount of a particular pollutant that a water body can assimilate on a daily basis

without violating applicable water quality standards.




what does TMDL do section 303 d of the clean water act established TMDL process to

guide the application of state water quality standards.

,TMDL process (3 steps) Identify Quality Limited waters (compile 303d list)




Establish Priority Waters/ Watersheds for TMDL development




Develop TMDLs




TMDL sum of the waste load allocations for point source, nonpoint source and natural

sources plus a margin of safety. They must identify links between: water body use impairment or

threat of concern, cause of impariment, load reductions or actions needed to remedy or prevent

the impairment




ELG Effluent Limitation Guidelines




Effective, February 2010, requires operators to sample stormwater discharges and comply with a

numeric standard for turbidity.

August 2011, 20 acres of more

Feb 2014, sites more than 10 acres must comply with numeric effuent limitations (280 NTUS)




NEL waived for events exceeding 2 year 24hr storm

,State regulations EPA delegated authority or EPA administered




Permittee EPA prefers general contractor




6 phases of stormwater pollution prevention for construction activiites Site evaluation

and design development

Project Assessment

Control selection and plan design

Certification and notification

Construction / implementation

Final stabilization / termination




Site Evaluation (steps) identify characteristics of the site: soils, surface waters, etc.




develop a site plan design (disturb smallest area, avoid sensitive areas, etc.)




describe construction activity

, Prepare pollution prevention site map




Project Assessment second phase in preparing SWPPP




Measure site areas

Determine drainage area

Calculate the runoff




BMP Selection and Plan Design phase 3




review state and local requirements

select erosion and sediment controls

stormwater management controls

other controls

prepare inspection and maintenance plan

description of controls

sequence of activities

Written for

Institution
CPESC...
Course
CPESC...

Document information

Uploaded on
March 26, 2025
Number of pages
64
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$18.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ARVEX

Also available in package deal

Thumbnail
Package deal
CPESC EXAM PACK WITH COMPLETE SOLUTIONS
-
11 2025
$ 174.89 More info

Get to know the seller

Seller avatar
ARVEX stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
10 months
Number of followers
0
Documents
2867
Last sold
2 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions