Follow through with all ___________ even if invalid or beyond your control. Complaints
The role of the inspector 1. "Official" representative on site
2. The fact finder and record keeper
3. The enforcement Case developer (legal issues)
4. A technical instructor
Turbidity units NTU - nephelometric turbidity unit
Measure transparency with Secchi disk
Measure metals HDPE bottles
Measure hydrocarbons Glass bottles
Benchmark for measuring toxicity Daphnia
, Measuring nutrients HDPE (at a lab)
The most dynamic plan The gcp plan
4 types of inspections 1. Illicit discharge, detection, and elimination. (IDDE)
2. Construction runoff program —- traditional.
3. Post construction runoff program.
4. Good housekeeping and pollution prevention practices - source control (usually industrial)
MS4 Municipal Separate Storm Sewer System
1. Owned or operated by a state or city or other public entity that discharges to waters of the state
2. Collects and conveys stormwater. (Storm drains, pipes, ditches, etc.)
3. NOT a combined sewer/storm system
4. NOT a part of a POW (public owned treatment works) system.
Located in a prominent place on the map North Arrow