100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CESSWI- 8 (BMPs) Questions and Answers 100% Solved

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
26-03-2025
Written in
2024/2025

CESSWI- 8 (BMPs) Questions and Answers 100% Solved Outlet Velocity Protection -designed to prevent scour at stormwater outlets and to minimize the potential for downstream erosion through velocity dissipation Pipe Slope Drain -uses piping materials to convey flow down a slope without causing erosion damage to the slope

Show more Read less
Institution
CESSWI....
Course
CESSWI....

Content preview

CESSWI- 8 (BMPs) Questions and Answers
100% Solved

Outlet Velocity Protection -designed to prevent scour at stormwater outlets and to

minimize the potential for downstream erosion through velocity dissipation




Pipe Slope Drain -uses piping materials to convey flow down a slope without causing

erosion damage to the slope




Retaining Walls -built against a slope or bank of a water body or water conveyance, roads,

and slopes behind structures to prevent slope failure

Limitations= require a site specific design and should be done by a P.E.




Rip-Rap -utilizes large, coarse, angular rock, frequently underlain with filter fabric

designed to protect soil from areas of concentrated flow such as channels or ditches, stabilize

slopes experiencing soil or seepage difficulties, increase infiltration, dissipate run-off velocity




Rock Check Dam -designed to capture sediment in stormwater runoff and slow the

velocity of that stormwater to prevent further site erosion

, Swales -designed to channel and convey runoff in a non-erosive manner to a discharge

point located downstream




Concrete Washout Area -contains concrete removed from vehicles/equipment by washing

and prevents it from entering storm drains or waterbodies

Limitations= only as effective as the training of employees




Dust Control -designed to reduce or eliminate airborne dust created by construction and

construction-related activities




Equipment Maintenance and Cleaning -designed to provide workers with the training and

locations for the repair, maintenance, fueling, and cleaning of equipment so that fluids

used/collected in these processes may be trapped and prevented from being introduced to

stormwater flow

Limitations= high costs, permits may be required




Materials Management -designed to minimize or prevent the release of pollutants to

stormwater

Written for

Institution
CESSWI....
Course
CESSWI....

Document information

Uploaded on
March 26, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ARVEX

Also available in package deal

Thumbnail
Package deal
CESSWI EXAM PACK WITH COMPLETE SOLUTIONS
-
11 2025
$ 170.89 More info

Get to know the seller

Seller avatar
ARVEX stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
10 months
Number of followers
0
Documents
2867
Last sold
2 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions