Boilermaker NCCR Test Questions And Answers When are steel chain slings recommended? - Answer-When rigging from three points /.A big control valve is pulled who is responsible for the rigging? - Answer-Crane operator and rigger /.What should be used to hold the pipe when setting up two 40-foot joints of 16-inch STD WT pipe? - Answer-4 legged roller top jacks /.The hitch made by wrapping the sling around the load, then passing one eye of the sling throughout a shackle is called? - Answer-Choker Hitch /.When should rigging material be attached to a bean that is being demolished? - Answer-Before any bolts are removed or any cutting is done on the beam. /.Which of the following has a greater possibility of being a respiratory hazard? - Answer-Asbestos /.Which type of insulation is required before a vessel is entered? - Answer-Locking, Tagging, and Blinding lines that feed the vessel /.According to OSHA, oxygen and acetylene cylinders in storage must be separated at what minimum distance? - Answer-20 Ft /.What is the first thing a boilermaker should do before cutting into a tank or vessel? - Answer-Determine the content /.What tool is normally used to check the alignment on the horizontal seams of the shell plates? - Answer-A 2-foot level /.What is used to expand tubes inside mud and steam drums? - Answer-Rolling motors and espanders /.What does a grooved nut on an Acetylene rig indicate? - Answer-The left hand thread is for acetylene use only /.Thermal beveling of pipe in preparation for welding requires use of an? - Answer-Oxyfuel Torch /.A 1-inch plate is to be cut. Why should an acetylene gerulator on a cutting rig not be adjusted over 15 PSI? - Answer-Acetylene is unstable above this pressure /.What action should be taken if a boiler tube fails? - Answer-Replace the failed tube /.Before a wall burner is pulled for inspection - Answer-The fuel gas valve must be shut /.Which of the following is a type of insulation used inside furnaces? - Answer-Fire Brick /.What does "MTW" mean in reference to boiler tubing? - Answer-Minimum Wall Thickness /.On a drawing, what is used to record any changes to the drawing? - Answer-Revision Block /.Scales on a drawing are usually written in - Answer-inches and feet /.Dimensional measurements can be found on all of the following except - Answer-Mechanical flow diagram /.All vessels elevations are taken from the - Answer-top of steel on the embed ring (base plate) /.A gate valve is being removed from a product line. All of the following procedures must be performed except? - Answer-Valve must be in closed position /.What is a spud wrench most commonly used for? - Answer-Aligning flanges /.What type of valves are typically used on a sight glass to direct flow? - Answer-3 way valves /.Handhole cap and plug material is verified by the - Answer-P4 report /.What are the four major components of a gate valve? - Answer-Body, Bonnet, gate, and stem /.What is the most commonly used fasteners in boiler construction? - Answer-Threaded /.On site, who determines what grade of material to be used for repair? - Answer-QA/QC /.What is the best tool to be used to prepare XXH 2-inch tubing for welding? - Answer-Milling Motor /.All of the following tools are used in preparation of the butt weld of a tube except? - Answer-Chipping Gun

Show more Read less
Institution
Boilermaker NCCR
Course
Boilermaker NCCR









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Boilermaker NCCR
Course
Boilermaker NCCR

Document information

Uploaded on
March 23, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Boilermaker NCCR Test Questions And Answers


When are steel chain slings recommended? - Answer-When rigging from three points

/.A big control valve is pulled who is responsible for the rigging? - Answer-Crane
operator and rigger

/.What should be used to hold the pipe when setting up two 40-foot joints of 16-inch
STD WT pipe? - Answer-4 legged roller top jacks

/.The hitch made by wrapping the sling around the load, then passing one eye of the
sling throughout a shackle is called? - Answer-Choker Hitch

/.When should rigging material be attached to a bean that is being demolished? -
Answer-Before any bolts are removed or any cutting is done on the beam.

/.Which of the following has a greater possibility of being a respiratory hazard? -
Answer-Asbestos

/.Which type of insulation is required before a vessel is entered? - Answer-Locking,
Tagging, and Blinding lines that feed the vessel

/.According to OSHA, oxygen and acetylene cylinders in storage must be separated at
what minimum distance? - Answer-20 Ft

/.What is the first thing a boilermaker should do before cutting into a tank or vessel? -
Answer-Determine the content

/.What tool is normally used to check the alignment on the horizontal seams of the shell
plates? - Answer-A 2-foot level

/.What is used to expand tubes inside mud and steam drums? - Answer-Rolling motors
and espanders

/.What does a grooved nut on an Acetylene rig indicate? - Answer-The left hand thread
is for acetylene use only

/.Thermal beveling of pipe in preparation for welding requires use of an? - Answer-
Oxyfuel Torch

/.A 1-inch plate is to be cut. Why should an acetylene gerulator on a cutting rig not be
adjusted over 15 PSI? - Answer-Acetylene is unstable above this pressure

, /.What action should be taken if a boiler tube fails? - Answer-Replace the failed tube

/.Before a wall burner is pulled for inspection - Answer-The fuel gas valve must be shut

/.Which of the following is a type of insulation used inside furnaces? - Answer-Fire Brick

/.What does "MTW" mean in reference to boiler tubing? - Answer-Minimum Wall
Thickness

/.On a drawing, what is used to record any changes to the drawing? - Answer-Revision
Block

/.Scales on a drawing are usually written in - Answer-inches and feet

/.Dimensional measurements can be found on all of the following except - Answer-
Mechanical flow diagram

/.All vessels elevations are taken from the - Answer-top of steel on the embed ring
(base plate)

/.A gate valve is being removed from a product line. All of the following procedures must
be performed except? - Answer-Valve must be in closed position

/.What is a spud wrench most commonly used for? - Answer-Aligning flanges

/.What type of valves are typically used on a sight glass to direct flow? - Answer-3 way
valves

/.Handhole cap and plug material is verified by the - Answer-P4 report

/.What are the four major components of a gate valve? - Answer-Body, Bonnet, gate,
and stem

/.What is the most commonly used fasteners in boiler construction? - Answer-Threaded

/.On site, who determines what grade of material to be used for repair? - Answer-
QA/QC

/.What is the best tool to be used to prepare XXH 2-inch tubing for welding? - Answer-
Milling Motor

/.All of the following tools are used in preparation of the butt weld of a tube except? -
Answer-Chipping Gun

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
kartelodoc Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
115
Member since
1 year
Number of followers
4
Documents
7763
Last sold
5 days ago

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Read more Read less
3.3

21 reviews

5
7
4
1
3
7
2
3
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions