Full Exam Review (Qns & Ans)
2025
1. Multiple Choice
What is the primary purpose of damage inspection in commercial
drying projects?
- A) Determine the source of water intrusion and affected areas
- B) Assess building aesthetics
- C) Calculate future moisture risks
- D) Locate potential pest infestations
ANS : A
Rationale : Identifying the source of water and understanding
the extent of the damage are critical for formulating an effective
restoration plan.
©2025
, 2. Fill-in-the-Blank
A thorough inspection involves determining the ________ of
water damage, such as clean, gray, or black water.
ANS : Category
Rationale : Water damage classification (Category 1, 2, or 3) is
essential to determine the appropriate remediation approach.
3. True/False
All water-damaged materials can be restored with effective drying
techniques.
ANS : False
Rationale : Some materials, such as heavily saturated porous
items or those contaminated by black water, may require removal
and replacement.
4. Multiple Response
Which tools are essential for moisture detection during damage
evaluation?
- A) Moisture meters
- B) Infrared cameras
- C) Thermo-hygrometers
©2025
,- D) Tape measures
ANS : A, B, C
Rationale : These tools help locate and quantify moisture, while
tape measures are not used for moisture detection.
---
Workflow Management
5. Multiple Choice
What is a key element of effective workflow management in
commercial drying projects?
- A) Assigning untrained personnel to critical tasks
- B) Establishing clear communication between teams
- C) Ignoring documentation requirements
- D) Focusing only on high-value areas of the property
ANS : B
Rationale : Clear communication ensures tasks are executed
efficiently and reduces errors.
6. Fill-in-the-Blank
©2025
, Developing a ________ is essential for scheduling, task
allocation, and tracking progress in complex drying projects.
ANS : Workflow plan
Rationale : A workflow plan provides a structured approach to
managing restoration activities.
7. True/False
Workflow management is less critical in commercial drying
compared to residential projects.
ANS : False
Rationale : Commercial drying often involves larger spaces,
higher complexity, and more stakeholders, making workflow
management essential.
8. Multiple Response
What challenges can disrupt workflow management during drying
projects?
- A) Equipment malfunctions
- B) Inconsistent team coordination
- C) Environmental factors (e.g., humidity changes)
- D) Detailed project documentation
ANS : A, B, C
©2025