The only app you need to prepare for
JEE Main JEE Adv. BITSAT WBJEE MHT CET and more...
4.8 50,000+ 2,00,000+
Rating on Google Play Students using daily Questions available
With MARKS app you can do all these things for free
Solve Chapter-wise PYQ of JEE Main, JEE Advanced, NEET, BITSAT, WBJEE, MHT CET & more
Create Unlimited Custom Tests for any exam
Attempt Top Questions for JEE Main which can boost your rank
Track your exam preparation with Preparation Trackers
Complete daily goals, rank up on the leaderboard & compete with other aspirants
4.8 50,000+ 2,00,000+
Rating on Google Play Students using daily Questions available
,WORK
POWER
ENERGY
, MARKS 3
W O R K, E NE R G Y & P O W E R
1
1 .1 . WORK
It refers to an activity involving a force and movement in the direction of the force.
1 .1 .1 Wo r k d o n e b y a c o n s t a n t f o r c e
When the point at which a force acts moves, the force is said to have done work.
When the force is constant, the work done is defined as the product of the force and distance moved.
Work done = force distance moved in direction of force
Consider in Figure a force F acting at the angle moves a body from point A to point B.
F
os
sc
A B
s
The distance moved in the direction of the force is given by
Distance in direction of force = s cos
So the work done by the force F is
Work done = F s cos
If the body moves in the same direction as the force the angle is 0.0 so
Work done = Fs
When the angle is 90 then the work done is zero.
The SI units for work are Joules J (with force F, in NewtonÊs N and distance, s, in metres m).
Note : Under the action of a constant force work done is path independent,
i.e., it depends on initial and final positions only. For example, if an object takes 1 B
from position A to position B through three different paths 1, 2 and 3 under a
2
constant force say F 2→i 3 j k → , then work done by this force in all three
paths will be same, or A
3
W1 = W 2 = W 3
Fig. 4.4
Similarly, work done by force of gravity m g near the surface of earth is path independent as
force of gravity is constant. Although we will see later that being a conservative force work done by force
of gravity is path independent at greater heights also.
Now let us take few examples related to above article.
WORK, ENERGY & POWER
, 4 MARKS
Ex a m p l e 1
How much work is done when a force of 5 kN moves its point of application 600 mm in the
direction of force.
Solution : Work done = (5 103 ) (600 103)
= 3000J
= 3 kJ
Ex a m p l e 2
Find the work done in raising 100 kg of water through a vertical distance of 3 m.
Solution : The force is the weight of the water, so
work done = (100 9.81) 3
= 2943 J
Ex a m p l e 3
Two unequal masses of 1 kg and 2 kg are attached at the two ends of a light
inextensible string passing over a smooth pulley as shown in figure. If the
system is released from rest, find the work done by string on both the blocks
in 1 s. Take g = 10 m/s2.
1kg
2kg
Solution : Net pulling force on the system is Fig. 4.6
F net = 2g 1g = 20 10 = 10 N
Total mass being pulled m = (1 + 2) = 3 kg
Therefore, acceleration of the system will be
Fnet 10
a m/s2
m 3
Displacement of both the blocks in 1 s is
1 1 10 2 5
S at 2 1 m
2 2 3 3 a T
1kg
Free body diagram of 2 kg block is shown in figure.
a
Using F = ma, we get
2kg a
10 1g 2kg
20 T 2 a 2
3
2g 20 N
20 40
or T 20 N
3 3
Work done by string (tension) on 1 kg block in 1 s is
W 1 = (T) (S) cos 0
40 5 200
3 3 1 9 J Ans.
WORK, ENERGY & POWER
JEE Main JEE Adv. BITSAT WBJEE MHT CET and more...
4.8 50,000+ 2,00,000+
Rating on Google Play Students using daily Questions available
With MARKS app you can do all these things for free
Solve Chapter-wise PYQ of JEE Main, JEE Advanced, NEET, BITSAT, WBJEE, MHT CET & more
Create Unlimited Custom Tests for any exam
Attempt Top Questions for JEE Main which can boost your rank
Track your exam preparation with Preparation Trackers
Complete daily goals, rank up on the leaderboard & compete with other aspirants
4.8 50,000+ 2,00,000+
Rating on Google Play Students using daily Questions available
,WORK
POWER
ENERGY
, MARKS 3
W O R K, E NE R G Y & P O W E R
1
1 .1 . WORK
It refers to an activity involving a force and movement in the direction of the force.
1 .1 .1 Wo r k d o n e b y a c o n s t a n t f o r c e
When the point at which a force acts moves, the force is said to have done work.
When the force is constant, the work done is defined as the product of the force and distance moved.
Work done = force distance moved in direction of force
Consider in Figure a force F acting at the angle moves a body from point A to point B.
F
os
sc
A B
s
The distance moved in the direction of the force is given by
Distance in direction of force = s cos
So the work done by the force F is
Work done = F s cos
If the body moves in the same direction as the force the angle is 0.0 so
Work done = Fs
When the angle is 90 then the work done is zero.
The SI units for work are Joules J (with force F, in NewtonÊs N and distance, s, in metres m).
Note : Under the action of a constant force work done is path independent,
i.e., it depends on initial and final positions only. For example, if an object takes 1 B
from position A to position B through three different paths 1, 2 and 3 under a
2
constant force say F 2→i 3 j k → , then work done by this force in all three
paths will be same, or A
3
W1 = W 2 = W 3
Fig. 4.4
Similarly, work done by force of gravity m g near the surface of earth is path independent as
force of gravity is constant. Although we will see later that being a conservative force work done by force
of gravity is path independent at greater heights also.
Now let us take few examples related to above article.
WORK, ENERGY & POWER
, 4 MARKS
Ex a m p l e 1
How much work is done when a force of 5 kN moves its point of application 600 mm in the
direction of force.
Solution : Work done = (5 103 ) (600 103)
= 3000J
= 3 kJ
Ex a m p l e 2
Find the work done in raising 100 kg of water through a vertical distance of 3 m.
Solution : The force is the weight of the water, so
work done = (100 9.81) 3
= 2943 J
Ex a m p l e 3
Two unequal masses of 1 kg and 2 kg are attached at the two ends of a light
inextensible string passing over a smooth pulley as shown in figure. If the
system is released from rest, find the work done by string on both the blocks
in 1 s. Take g = 10 m/s2.
1kg
2kg
Solution : Net pulling force on the system is Fig. 4.6
F net = 2g 1g = 20 10 = 10 N
Total mass being pulled m = (1 + 2) = 3 kg
Therefore, acceleration of the system will be
Fnet 10
a m/s2
m 3
Displacement of both the blocks in 1 s is
1 1 10 2 5
S at 2 1 m
2 2 3 3 a T
1kg
Free body diagram of 2 kg block is shown in figure.
a
Using F = ma, we get
2kg a
10 1g 2kg
20 T 2 a 2
3
2g 20 N
20 40
or T 20 N
3 3
Work done by string (tension) on 1 kg block in 1 s is
W 1 = (T) (S) cos 0
40 5 200
3 3 1 9 J Ans.
WORK, ENERGY & POWER