A method is a logical group of statements. - ANS-True
A method may or may not accept one of more values for it to work with. - ANS-True
A method may return one or none values or references. - ANS-True
The "out" parameter modifier makes it possible for a method to return more than one values. - ANS-
True
The purpose of having regular scrum event meetings is to avoid more meetings. - ANS-True
All scrum events are time-boxed which means __________ ? - ANS-All events have their own
predetermined length
A sprint delivers a software increment. - ANS-True
A sprint is typically time-boxed 2-4 weeks. - ANS-True
The length of a sprint is always determined by the user story. The longer the story, the longer the sprint.
- ANS-False
Which of the following is NOT a sprint event? - ANS-Scrum Master
Which of the following is NOT an agenda item on a sprint planning meeting? - ANS-Take attendance
Suppose there are 5 stories in the product backlog:
Story 1: 20 points
Story 2: 40 points
Story 3: 40 points
, Story 4: 13 points
Story 5: 20 points
If the team can complete 70 story points per sprint (called velocity) and the priority is the same as the
story #, where 1 is the highest and 5 is the lowest. Which stories are probably picked by the team? -
ANS-Story 1
Story 2
Story 4
Daily scrum meetings should have members stand up to avoid prolonging the meeting. - ANS-True
Which of the following questions is NOT asked in the daily scrum meetings? - ANS-What do I plan to do
tomorrow?
The sprint review meeting is a time when the team can see what they did well and what needs
improvement for the past sprint. - ANS-False
Which of the following is NOT a key to success in a sprint review meeting? - ANS-Make it a formal
meeting with customers
Which of the following is NOT a purpose of sprint retrospective? - ANS-Demo the software to the
customers
Which of the following is NOT a key to the success of sprint retrospective? - ANS-Product owner should
not be present
C# is an OOP language that programmers use to write instructions for computers. - ANS-True
An object oriented programming language is a way to develop applications such that _____ classes can
be used to build larger programs. - ANS-Reusable
Namespace is a container that groups stuff such as classes together. - ANS-True
Class is a container that groups stuff such as _____ together - ANS-Methods
A ______ is a logical group of statements for a common objective. - ANS-Method
For the waterfall approach, each phase must have one or more deliverables. - ANS-True
One major problem with the waterfall is the requirement for customers to know how to program in at
least one language. - ANS-False
One major problem with the waterfall is the clear line between roles such as analyst, designer, and
programmer. - ANS-True
One major problem with the waterfall is the difficulty to work on an earlier phase once the project
moves on the later phase. - ANS-True
Agile approach has no deliverables. - ANS-False