Chapter 3: Project Management QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+

Institution
Project Management
Course
Project Management








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Project Management
Course
Project Management

Document information

Uploaded on
March 13, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • project management

Content preview

Chapter 3: Project Management

Activity-on-Arrow (AOA) - ANS-community diagram wherein arrows designate activities;
nodes (events) consume neither time nor sources
Activity-on-Node (AON) - ANS-network diagram in which nodes designate sports
Backward Pass - ANS-procedure that identifies all the past due begin and overdue finish
times
Beta Distribution Formula for Expected Activity Time - ANS-t = (a + 4m +b) / 6
Crash Time - ANS-shortest length required to finish an activity
Crashing - ANS-shortening the length of the venture in cheapest way feasible
Critical Activities - ANS-activities with zero slack and are on the critical route
Critical Path - ANS-the computed longest time path(s) via a network; if activities on course
are delayed then the whole undertaking may be delayed
Critical Path Method (CPM) - ANS-method that uses best one time factor per pastime;
assumes all pastime times are recognized and glued constants
Dummy Activities - ANS-eat no time or resources, utilized in AOA whilst two activities have
equal begin and finishing instances or following a few however no longer all previous sports
Earliest Finish (EF) - ANS-earliest time at which an hobby may be completed
Earliest Start (ES) - ANS-earliest time at which an interest can begin, assuming all
predecessors had been completed
Forward Pass - ANS-technique that identifies all the early times
Gantt Chart - ANS-horizontal bar chart illustration of a hard and fast of tasks
Latest Finish (LF) - ANS-cutting-edge time by using which an pastime has to complete as a
way to now not delay the of entirety time of the whole undertaking
Latest Start (LS) - ANS-state-of-the-art time at which an activity can start so that you can not
postpone the final touch time of the complete project
Lowest Level in WBS - ANS-identifies sports that document work applications
Most Likely Time (m) - ANS-most realistic estimate of time required to finish an activity
Network Techniques - ANS-PERT, CPM
Optimistic Time (a) - ANS-time an interest will take if the entirety is going as deliberate
Pessimistic Time (b) - ANS-time an hobby will take assuming very destructive conditions
Program Evaluation Review Technique (PERT) - ANS-technique that employs 3 time
estimates for every hobby which allows computations of worst and nice case situations in
addition to chance that tasks might also grow to be late
Project Controlling - ANS-entails monitoring assets, charges, pleasant, and budgets; the use
of a remarks loop to help make changes; produce extensive reports for task managers
Project Management (importance) - ANS-time-based final touch and achievement of
excellent standards
Project Organization - ANS-shaped to make certain that programs (tasks) receive the proper
control and interest
Project Scheduling - ANS-involves sequencing and meting out time to all mission sports
Projects - ANS-associated obligations directed to a primary output
Slack - ANS-the quantity of time that an interest may be overdue without pushing lower back
the completion date of the complete task

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Qualitydocs Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
408
Member since
2 year
Number of followers
178
Documents
3479
Last sold
1 week ago

Welcome to Qualitydocs ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

3.9

115 reviews

5
67
4
15
3
10
2
5
1
18

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions