100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SWE 3313 FINAL EXAM STUDY GUIDE Questions And Answers 2025 Update.

Rating
-
Sold
-
Pages
25
Grade
A+
Uploaded on
10-03-2025
Written in
2024/2025

©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 8:10PM. 1 SWE 3313 FINAL EXAM STUDY GUIDE Questions And Answers 2025 Update. Because there are i) more parts ii) more developers iii) more users to consider in "Large Systems" than a single program developed by a single person for a limited number of users, there is the need for Coordination of (3P's): Which of the following is not one of the 3p"s? A. Programs B. Processes C. People D. Product - AnswerA. Programs Software Project Success & Failure Factors (Chaos Report) listed profiling attributes for "impaired and ultimately cancelled" projects as all but which of the following? A. Incomplete Requirements B. Lack of management support C. Lack of user involvement D. Lack of resources - AnswerB, Lack of management support ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 8:10PM. 2 When considering Cohesion and Coupling; A. More cohesion and less coupling is better B. More of both is better C. Less of both is better D. Less cohesion and more coupling is better - AnswerA. More cohesion and less coupling is better Which one of the following is NOT a type of module cohesion? A. Communicational B. Sequential C. Procedural D. They are all types of cohesion - AnswerD. They are all types of cohesion View Oriented Requirements Definition (VORD) is based on the concept that requirements are: A. vague B. manifested by the user interface (UI) C. different for different users D. new - AnswerC. different for different users The distinct tasks to develop software are: A. code, compile, debug, and unit test. B. requirements, design, code, test, integrate, and package. C. design document, user guide, and test cases. D. All of these are correct - AnswerA. code, compile, debug, and unit test. Two types of prototypes can be done in design. They are: A. Logical View, Detailed Design B. Logical View, Process View C. Low-fidelity, High-fidelity D. Architecture Design, Detailed Design - AnswerC. Low-fidelity, High-fidelity ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 8:10PM. 3 The term "Sunsetting" refers to: A. When all defects have been found and fixed in a product. B. The point in the life of a product when a new replacement product or release is announced. C. When a programming team is finished and can turn over the product to maintenance. D. None of the above - AnswerB. The point in the life of a product when a new replacement product or release is announced. Which one of the following is NOT true about phases of debugging process? A. The process of correction involves changing the code to fix the errors. B. The process of verification involves making sure the code is consistent with the requirements. C. The process of localization involves finding the sections of the code that led to the error. D. The process of stabilization does not involve looking at the code at all. - AnswerB. The process of verification involves making sure the code is consistent with the requirements. The amount and extent of detail that must be included in the software requirements specification (SRS) document depends on the A. Knowledge and experience of the developers in the subject area. B. Size and complexity of the project C. Both A and B D. None of the above - AnswerC. Both A and B Which of the following statements is true about "good" design? A. A module with temporal cohesion is better than a module with procedural cohesion. B. A module with procedural cohesion is better than a module with communicational cohesion. C. Control coupled modules are better than Stamp coupled modules. D. Common coupled modules are better than control coupled modules. - AnswerB. A module with procedural cohesion is better than a module with communicational cohesion. Which one of the following is

Show more Read less
Institution
SWE 3313
Course
SWE 3313










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWE 3313
Course
SWE 3313

Document information

Uploaded on
March 10, 2025
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 8:10PM.




SWE 3313 FINAL EXAM STUDY GUIDE
Questions And Answers 2025 Update.

Because there are


i) more parts
ii) more developers
iii) more users


to consider in "Large Systems" than a single program developed by a single person for a limited
number of users, there is the need for Coordination of (3P's):


Which of the following is not one of the 3p"s?


A. Programs
B. Processes
C. People

D. Product - Answer✔A. Programs
Software Project Success & Failure Factors (Chaos Report) listed profiling attributes for
"impaired and ultimately cancelled" projects as all but which of the following?


A. Incomplete Requirements
B. Lack of management support
C. Lack of user involvement

D. Lack of resources - Answer✔B, Lack of management support


1

, ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 8:10PM.


When considering Cohesion and Coupling;


A. More cohesion and less coupling is better
B. More of both is better
C. Less of both is better

D. Less cohesion and more coupling is better - Answer✔A. More cohesion and less coupling is
better
Which one of the following is NOT a type of module cohesion?


A. Communicational
B. Sequential
C. Procedural

D. They are all types of cohesion - Answer✔D. They are all types of cohesion
View Oriented Requirements Definition (VORD) is based on the concept that requirements are:
A. vague
B. manifested by the user interface (UI)
C. different for different users

D. new - Answer✔C. different for different users
The distinct tasks to develop software are: A. code, compile, debug, and unit test.
B. requirements, design, code, test, integrate, and package.
C. design document, user guide, and test cases.

D. All of these are correct - Answer✔A. code, compile, debug, and unit test.
Two types of prototypes can be done in design. They are:
A. Logical View, Detailed Design
B. Logical View, Process View
C. Low-fidelity, High-fidelity

D. Architecture Design, Detailed Design - Answer✔C. Low-fidelity, High-fidelity


2

, ©FYNDLAY 2024/2025 ALL RIGHTS RESERVED 8:10PM.


The term "Sunsetting" refers to:
A. When all defects have been found and fixed in a product.
B. The point in the life of a product when a new replacement product or release is announced.
C. When a programming team is finished and can turn over the product to maintenance.

D. None of the above - Answer✔B. The point in the life of a product when a new replacement
product or release is announced.
Which one of the following is NOT true about phases of debugging process?


A. The process of correction involves changing the code to fix the errors.
B. The process of verification involves making sure the code is consistent with the
requirements.
C. The process of localization involves finding the sections of the code that led to the error.

D. The process of stabilization does not involve looking at the code at all. - Answer✔B. The
process of verification involves making sure the code is consistent with the requirements.
The amount and extent of detail that must be included in the software requirements
specification (SRS) document depends on the
A. Knowledge and experience of the developers in the subject area.
B. Size and complexity of the project
C. Both A and B

D. None of the above - Answer✔C. Both A and B
Which of the following statements is true about "good" design?


A. A module with temporal cohesion is better than a module with procedural cohesion.
B. A module with procedural cohesion is better than a module with communicational cohesion.
C. Control coupled modules are better than Stamp coupled modules.

D. Common coupled modules are better than control coupled modules. - Answer✔B. A module
with procedural cohesion is better than a module with communicational cohesion.
Which one of the following is NOT a type of module coupling?
A. Data coupling
3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Fyndlay Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
356
Member since
1 year
Number of followers
80
Documents
18669
Last sold
1 day ago
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

68 reviews

5
32
4
8
3
13
2
6
1
9

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions