Question 1
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Post-loss financing includes ...
a.
insurance.
b.
captives.
c.
retention.
d.
equity.
Feedback
Your answer is correct.
The correct answer is:
equity.
Question 2
Correct
Mark 1.00 out of 1.00
Flag question
, Question text
Indicate the correct equation:
a.
residual risk = inherent risk + controls
b.
residual risk = inherent risk - controls
c.
residual risk = key risk - controls
d.
residual risk = residual risk
Feedback
Your answer is correct.
The correct answer is:
residual risk = inherent risk - controls
Question 3
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The following factors should be considered during risk evaluation:
a. the potential time at which the risk event is most likely to occur
b. the potential reputational effect should the loss occur
c. the significance of the risk and likelihood of the loss
d. the cost of risk controls in relation to the potential loss
Choose the correct combination:
a.
b,c
b.
a,b,c
c.
b,c,d
d.
a,b,c,d
2. Welcome Message
3. Assessment 2
Quiz
Assessment 2
Open course index
Open block drawer
Started on Saturday, 8 March 2025, 7:23 AM
State Finished
Completed on Saturday, 8 March 2025, 8:33 AM
Time taken 1 hour 9 mins
Marks 25.00/25.00
Grade 100.00 out of 100.00
Question 1
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Post-loss financing includes ...
a.
insurance.
b.
captives.
c.
retention.
d.
equity.
Feedback
Your answer is correct.
The correct answer is:
equity.
Question 2
Correct
Mark 1.00 out of 1.00
Flag question
, Question text
Indicate the correct equation:
a.
residual risk = inherent risk + controls
b.
residual risk = inherent risk - controls
c.
residual risk = key risk - controls
d.
residual risk = residual risk
Feedback
Your answer is correct.
The correct answer is:
residual risk = inherent risk - controls
Question 3
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The following factors should be considered during risk evaluation:
a. the potential time at which the risk event is most likely to occur
b. the potential reputational effect should the loss occur
c. the significance of the risk and likelihood of the loss
d. the cost of risk controls in relation to the potential loss
Choose the correct combination:
a.
b,c
b.
a,b,c
c.
b,c,d
d.
a,b,c,d