A document that outlines weights, crane configuration and rigging requirements for a lift is? -
ANS-Lift plan
\A lift plan must be completed by a: - ANS-Supervisor
\A lift plan should be discussed ______. - ANS-D. At a pre-lift meeting where all personnel in the
lift are present.
\A one inch, 3 leg bridle wire rope sling rigged at 45° angle is good for 18 tons. The addition of a
fourth leg will increase your capacity by: - ANS-0 lbs
\According to ASME B30.5, a two crane lift is signaled by: - ANS-One designated person
\After any structural repair or modification, a personnel lifting platform shall be tested to what
percentage of the platform rating? - ANS-150%
\All of the following are reasons for stopping personnel lifting operations EXCEPT: - ANS-There
are no tag lines.
\All of the following are results of unbalanced reeving of the block except: - ANS-Wear on the
hook
\All of the following conditions exert dynamic loading on a crane except: - ANS-Static boom
angle
\All of the following statements about crane contact to power lines are true EXCEPT: - ANS-The
operator should leave the cab as quickly as possible
\An unsafe condition that riggers should be aware of when dealing with a multi part load block
is: - ANS-Twisting multi part lines
\Anchorage point for fall arrest for a single person must be able to hold? - ANS-5000 lbs.
\At what percentage of increase in length should a chain sling be removed from service? -
ANS-5%
\Before a spreader bar or beams can be used they MUST have been: - ANS-Tested and
approved
\Before performing pick and carry operations with any mobile crane, it is important to: -
ANS-Refer to the manufacturer's capacity chart.
\Capacities for crawler cranes that have outrigger extensions may not exceed ________. -
ANS-D. 85 perfect of tipping
\During a critical lift, the only person(s) who may give signals to the crane operator is/are the: -
ANS-designated, qualified signalers
\Electrical hazards in the lift area and swing direction and degree are factors to consider in
preparing which portion of a lift plan? - ANS-D. Crane Placement
\Equipment condition is categorized under which part of a lift plan? - ANS-Weight
\If both fists are placed in front of your body with your thumbs pointed outward, the crane
operator should: - ANS-Extend the boom sections.
\If the gross capacity of a crane is 120,000 lbs and the total weight of deductions is 20,000 lbs,
the net capacity of the crane in this configuration is: - ANS-
\If the gross capacity of a crane is 75,000 lbs. and the total weight of the deductions is 4500 lbs.
The net capacity of the crane in this configuration is: - ANS-
A document that outlines weights, crane configuration and rigging requirements for a lift is? -
ANS-Lift plan
\A lift plan must be completed by a: - ANS-Supervisor
\A lift plan should be discussed ______. - ANS-D. At a pre-lift meeting where all personnel in the
lift are present.
\A one inch, 3 leg bridle wire rope sling rigged at 45° angle is good for 18 tons. The addition of a
fourth leg will increase your capacity by: - ANS-0 lbs
\According to ASME B30.5, a two crane lift is signaled by: - ANS-One designated person
\After any structural repair or modification, a personnel lifting platform shall be tested to what
percentage of the platform rating? - ANS-150%
\All of the following are reasons for stopping personnel lifting operations EXCEPT: - ANS-There
are no tag lines.
\All of the following are results of unbalanced reeving of the block except: - ANS-Wear on the
hook
\All of the following conditions exert dynamic loading on a crane except: - ANS-Static boom
angle
\All of the following statements about crane contact to power lines are true EXCEPT: - ANS-The
operator should leave the cab as quickly as possible
\An unsafe condition that riggers should be aware of when dealing with a multi part load block
is: - ANS-Twisting multi part lines
\Anchorage point for fall arrest for a single person must be able to hold? - ANS-5000 lbs.
\At what percentage of increase in length should a chain sling be removed from service? -
ANS-5%
\Before a spreader bar or beams can be used they MUST have been: - ANS-Tested and
approved
\Before performing pick and carry operations with any mobile crane, it is important to: -
ANS-Refer to the manufacturer's capacity chart.
\Capacities for crawler cranes that have outrigger extensions may not exceed ________. -
ANS-D. 85 perfect of tipping
\During a critical lift, the only person(s) who may give signals to the crane operator is/are the: -
ANS-designated, qualified signalers
\Electrical hazards in the lift area and swing direction and degree are factors to consider in
preparing which portion of a lift plan? - ANS-D. Crane Placement
\Equipment condition is categorized under which part of a lift plan? - ANS-Weight
\If both fists are placed in front of your body with your thumbs pointed outward, the crane
operator should: - ANS-Extend the boom sections.
\If the gross capacity of a crane is 120,000 lbs and the total weight of deductions is 20,000 lbs,
the net capacity of the crane in this configuration is: - ANS-
\If the gross capacity of a crane is 75,000 lbs. and the total weight of the deductions is 4500 lbs.
The net capacity of the crane in this configuration is: - ANS-