APM PFQ EXAM 2025 TEST BANK over 400 QUESTIONS WITH CORRECT DETAILED ANSWERS || ALREADY GRADED A+ &lt; LATEST VERSION &gt; 1. Which of the following is not a stage in an issue resolution process? a. Share the issue with stakeholders. b. Track the issue to closure. C. Escalate to the sponsor. c. Apply change control. - ANSWER A 2. Which of the following are challenges for a project manager developing and leading a project team? 1) Issues and incompatibility amongst team members 2) Getting the right skills and attributes amongst team members 3) Co-location of team members in the same geographic area 4) Lack of accountability of team members a. 1, 2 & 3 b. 1, 2 & 4 c. 1, 3 & 4 d. 2, 3 & 4 - ANSWER C 3. The main aim of quality management is to: a. Prepare a high-quality management plan. b. Ensure that deliverables meet appropriate standards. c. Validate the use of consistent standards. d. Determine whether to accept change requests. - ANSWER B 4. Which of the following is a purpose of issue management? a. To stop issues occurring within the project. b. To address and resolve the issues that occur. c. To address and resolve uncertainty. d. To reschedule activities to reduce costs - ANSWER B 5. Product breakdown structures illustrate the required scope of work by a hierarchical structure itemising the: a. Components of each product. b. Budget of each product. c. Benefits of each product. d. Risks of each product. - ANSWER A 6. The definition of benefits management includes which key activities? a. Planning, analysis and integration of project benefits. b. Justification, validation and acceptance of project benefits. c. Identification, tracking and realisation of project benefits. d. Realisation, acceptance and integration of project benefits - ANSWER � � C 7. Which of the following statements about scheduling is false? a. Defines the sequence of activities. b. Considers work calendars and time contingency. c. Provides a baseline for safety considerations. d. Quantifies the required resources. - ANSWER C 8. Which of the following defines the term 'deployment baseline'? a. The starting point for creating a resource histogram. b. The basis for creating an organisational breakdown structure. c. The starting point for the monitoring of project risks. d. The basis for progress monitoring. - ANSWER D 9. Which of the following is an activity in a typical configuration management process? a. Evaluation. b. Identification. c. Registration. d. Justification. - ANSWER B 10. Stakeholder analysis supports effective stakeholder engagement by: a. Identifying stakeholders with high levels of power and interest. b. Ensuring stakeholder acceptance of project deliverables. c. Justifying the preferred project option to stakeholders. d. Providing information to all stakeholders. - ANSWER A 11. Which of the following is a project? a. Introducing a new information technology system. b. Operating a national rail network. c. Organising ongoing catering in the armed forces. d. Managing day-to-day security for senior politicians - ANSWER A 12. Which of the following is an activity in a typical change control process? a. Recommendation. b. Justification. c. Planning. d. Continuous improvement - ANSWER A 13. The purpose of quality assurance is to: a. Provide confidence the project will satisfy the relevant quality standards. b. Determine a set of procedures and standards for project management. c. Inspect, measure and test deliverables and processes. d. Define the scope and specifics of a project's deliverables - ANSWER � � A 14. A project manager might use a PESTLE analysis in order to: a. Mitigate all possible risks to the project. b. Identify and mitigate factors that may affect the project. c. Control technological change during the project. d. Consider team social roles in early stages of the project - ANSWER B 15. Which of the following are phases in an iterative project life cycle? 1) Concept 2) Feasibility 3) Deployment 4) Development a. 3 and 4 only b. 1, 2 and 3 c. 1 and 2 only d. 2, 3 and 4 - ANSWER D 16. Which of the following is the responsibility of a project manager? a. Ensuring a project is aligned to the organisation's strategy. b. Focusing on project benefits and aligning priorities. c. Achieving the project's success criteria. d. Improving process, tools and techniques used in a project - ANSWER � � C 17. To develop and establish a proper communication plan within a project, the project manager needs to consider which type of analysis? a. Budget. b. Stakeholder. c. Resource. d. Schedule - ANSWER B 18. Which of the following is a responsibility of the project sponsor? a. Creating a project cost breakdown structure. b. Authoring the project management plan. c. Creating a project work breakdown structure. d. Owning the project business case. - ANSWER D 19. Portfolio management includes prioritising: a. Projects and/or programmes that contribute directly to the organisation's strategic objectives. b. Projects with exceptionally high returns on investment. c. Projects and programmes over business as usual. d. Projects which maximise change over those which maximise investment - ANSWER A 20. Which of the following actions would not help a team leader influence the performance of their team? a. Creating an exclusive environment. b. Providing clear roles and responsibilities. c. Promoting openness and honesty. d. Developing a trusting relationship. - ANSWER A 21. One difference between a project and business as usual is: a. Projects achieve specified benefits but business as usual has only vague benefits. b. Projects drive change whereas business as usual continues existing activities. c. Projects have tightly controlled budgets whereas business as usual does not. d. Projects have unclear deadlines but business as usual has multiple milestones - ANSWER B 22. The purpose of project progress reporting is to: a. Ensure a simpler critical path. b. Enable the tracking of project deliverables. c. Ensure stakeholder acceptance of project deliverables. d. Provide an increased total float. - ANSWER B 23. Which of the following is the purpose of an estimating funnel? a. Keeping resource usage to a minimum to help reduce costs. b. Supporting the production of comparative estimates. c. Identifying where costs can be minimised when preparing a budget. d. Representing increasing levels of estimating accuracy achieved through the life cycle - ANSWER D 24. One advantage of virtual communications is: a. That nonverbal signals can have an impact on discussions. b. It's easy to detect signs of conflict within the project team. c. Access to a wider resource pool for the project. d. That the project team will always be co-located. - ANSWER C 25. Which technique could be used by a project manager when resources are limited? a. Resource aggregation. b. Resource estimation. c. Resource levelling. d. Resource expansion - ANSWER C

Show more Read less
Institution
APM PFQ
Course
APM PFQ











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
APM PFQ
Course
APM PFQ

Document information

Uploaded on
March 7, 2025
Number of pages
88
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

APM PFQ EXAM 2025 TEST BANK
over 400 QUESTIONS WITH
CORRECT DETAILED ANSWERS ||
ALREADY GRADED A+ < LATEST
VERSION >




1. Which of the following is not a stage in an issue resolution process?
a. Share the issue with stakeholders.
b. Track the issue to closure. C. Escalate to the sponsor.
c. Apply change control. - ANSWER 🗸 A


2. Which of the following are challenges for a project manager developing and
leading a project team?
1) Issues and incompatibility amongst team members
2) Getting the right skills and attributes amongst team members
3) Co-location of team members in the same geographic area
4) Lack of accountability of team members
a. 1, 2 & 3
b. 1, 2 & 4
c. 1, 3 & 4
d. 2, 3 & 4 - ANSWER 🗸 C


3. The main aim of quality management is to:
a. Prepare a high-quality management plan.

, b. Ensure that deliverables meet appropriate standards.
c. Validate the use of consistent standards.
d. Determine whether to accept change requests. - ANSWER 🗸 B


4. Which of the following is a purpose of issue management?
a. To stop issues occurring within the project.
b. To address and resolve the issues that occur.
c. To address and resolve uncertainty.
d. To reschedule activities to reduce costs - ANSWER 🗸 B


5. Product breakdown structures illustrate the required scope of work by a
hierarchical structure itemising the:
a. Components of each product.
b. Budget of each product.
c. Benefits of each product.
d. Risks of each product. - ANSWER 🗸 A


6. The definition of benefits management includes which key activities?
a. Planning, analysis and integration of project benefits.
b. Justification, validation and acceptance of project benefits.
c. Identification, tracking and realisation of project benefits.
d. Realisation, acceptance and integration of project benefits - ANSWER
🗸C


7. Which of the following statements about scheduling is false?
a. Defines the sequence of activities.
b. Considers work calendars and time contingency.
c. Provides a baseline for safety considerations.
d. Quantifies the required resources. - ANSWER 🗸 C


8. Which of the following defines the term 'deployment baseline'?

, a. The starting point for creating a resource histogram.
b. The basis for creating an organisational breakdown structure.
c. The starting point for the monitoring of project risks.
d. The basis for progress monitoring. - ANSWER 🗸 D


9. Which of the following is an activity in a typical configuration management
process?
a. Evaluation.
b. Identification.
c. Registration.
d. Justification. - ANSWER 🗸 B


10.Stakeholder analysis supports effective stakeholder engagement by:
a. Identifying stakeholders with high levels of power and interest.
b. Ensuring stakeholder acceptance of project deliverables.
c. Justifying the preferred project option to stakeholders.
d. Providing information to all stakeholders. - ANSWER 🗸 A


11.Which of the following is a project?
a. Introducing a new information technology system.
b. Operating a national rail network.
c. Organising ongoing catering in the armed forces.
d. Managing day-to-day security for senior politicians - ANSWER 🗸 A


12.Which of the following is an activity in a typical change control process?
a. Recommendation.
b. Justification.
c. Planning.
d. Continuous improvement - ANSWER 🗸 A


13.The purpose of quality assurance is to:

, a. Provide confidence the project will satisfy the relevant quality
standards.
b. Determine a set of procedures and standards for project management.
c. Inspect, measure and test deliverables and processes.
d. Define the scope and specifics of a project's deliverables - ANSWER
🗸A


14.A project manager might use a PESTLE analysis in order to:
a. Mitigate all possible risks to the project.
b. Identify and mitigate factors that may affect the project.
c. Control technological change during the project.
d. Consider team social roles in early stages of the project - ANSWER 🗸
B


15.Which of the following are phases in an iterative project life cycle? 1)
Concept 2) Feasibility 3) Deployment 4) Development
a. 3 and 4 only
b. 1, 2 and 3
c. 1 and 2 only
d. 2, 3 and 4 - ANSWER 🗸 D


16.Which of the following is the responsibility of a project manager?
a. Ensuring a project is aligned to the organisation's strategy.
b. Focusing on project benefits and aligning priorities.
c. Achieving the project's success criteria.
d. Improving process, tools and techniques used in a project - ANSWER
🗸C


17.To develop and establish a proper communication plan within a project, the
project manager needs to consider which type of analysis?
a. Budget.
b. Stakeholder.
c. Resource.
$10.39
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ChrisEliteDocs

Get to know the seller

Seller avatar
ChrisEliteDocs Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
5
Member since
1 year
Number of followers
0
Documents
110
Last sold
4 months ago
Elite Study Materials

As a highly respected professional with a focus on sourcing study materials, I offer authentic and dependable exam papers directly acquired from renowned and reputable institutions. These resources are meticulously curated to support aspiring nurses and professionals across various fields in their exam preparation. Leveraging my extensive experience and deep expertise, I ensure that each exam paper is thoughtfully selected and meticulously crafted to meet the highest standards of quality, accuracy, and relevance. These materials are an indispensable component of any effective study plan, designed to help you achieve success.

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions