LARE: Inventory, Analysis, and Project Management Exam Questions with Complete Solutions
LARE: Inventory, Analysis, and Project Management Exam Questions with Complete Solutions A Comprehensive Master Plan differs from a Zoning Ordinance in which ways? - Correct Answer A Comprehensive Master Plan offers guidance for future development, whereas the Zoning Ordinance does not The Zoning Ordinance is a legally binding document used to regulate growth, whereas the Comprehensive Master Plan is not Channel - Correct Answer the portion of the floodplain where a stream/river flows under normal conditions. Floodway - Correct Answer the portion of the floodplain that is used to convey floodwaters during a 100-year flood. Flood fringe - Correct Answer the portion of the floodplain outside the floodway that does not convey floodwaters and usually contains slow-moving or standing water. Time of concentration - Correct Answer The amount of time needed for water to flow from the most remote point in a watershed to the watershed outlet site inventory and analysis - Correct Answer relationship between proposed site uses and existing site resources Concept plans - Correct Answer Concept plans organize the project's proposed elements approximately where they are to be located on the site, and they tend to identify "Open space," "Circulation," and "Activity zones/development pods tools for a project manager - Correct Answer project planning, scheduling and quality control, task management, budgeting and establishing project objectives and project management goals. work breakdown structure (WBS) - Correct Answer The WBS establishes a hierarchy of tasks that illustrates the relationship between various tasks and shows certain (smaller scope) tasks as components of other (higher-level) tasks. The WBS should be made as simple and straightforward as possible to manage the project in question. The WBS should relate to the contractual requirements specific to the project in question and be a
Written for
- Institution
- LARE
- Course
- LARE
Document information
- Uploaded on
- March 6, 2025
- Number of pages
- 71
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- channel
- floodway
- flood fringe
-
a comprehensive master plan differs from a zoning