NICET Highway Construction Inspector Level III Practice Exam 1 Questions and Answers Latest Update

Institution
NICET Highway Construction Inspector Level III
Course
NICET Highway Construction Inspector Level III










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NICET Highway Construction Inspector Level III
Course
NICET Highway Construction Inspector Level III

Document information

Uploaded on
March 6, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NICET Highway Construction Inspector Level III Practice
Exam 1 Questions and Answers Latest Update




Terms in this set (56)


During installation of traffic loops A) Do not allow vehicular traffic over an open saw cut.
in the pavement, which three c) Thoroughly clean the saw cut of foreign material.
statements apply prior to and d) Use a plastic sleeve where loop wire crosses a joint.
During the installation of
loop wire? (Choose 3).


a) Do not allow vehicular traffic
over an open saw cut.
b) Do not overlap saw cuts at the
corner.
c) Thoroughly clean the saw cut of
foreign material.
d) Use a plastic sleeve where loop
wire crosses a joint.

,The contractor is installing a ?
Culvert with a 12-inch reinforced
concrete pipe ( outside diameter
Of 16.50 inches) from Sta 10+00, 40
feet Left to STA 10+00, 65 feet
Right on 4-inch bedding material.
The 12-inch RCP outlet is to be
installed at Sta 10+00, 40 feet Left
at an invert elevation of 652.50.


If the conduit is installed at a 1.40%
slope, what is the elevation of the
foundation grade at Sta 10+00, 45
feet Right?


a) 652.04
b) 653.17
c) 653.36
d) 653.50

On the reservoir side of a dam, B) maximum water elevation
erosion protection against wave
Action should extend up the slope
to at least which level?


a) Crest of dam
b) Maximum water elevation
c) Minimum water elevation
d) Two-thirds the height of the dam

During stage construction while c) Maintain the existing drainage system until the new system is
installing drainage, the contractor functional.
must complete which two of the d) Provide temporary connections as needed to maintain the existing
following tasks? (Choose two). system.


a) Bulk head the pipe until the
system is complete.
b) Complete the entire system
before it rains.
c) Maintain the existing drainage
system until the new system is
functional.
d) Provide temporary connections
as needed to maintain the existing
system.

, After flushing but before D) pressure testing
Connecting a new main to the
existing system, what test does an
inspector need to verify before
Placing the main into service?


a) Bacteriological testing
b) Cover testing
c) Deflection testing
d) Pressure testing

Which three types of inspections b) Interim inspection
Are completed for sign structures? c) Initial inspection
(Choose three). d) Routine inspection


a) Final inspection
b) Interim inspection
c) Initial inspection
d) Routine inspection

How many times per foot should B) 5 turns per foot
loop lead-in wires be twisted?


a) 3 turns per foot
b) 5 turns per foot
c) 6 turns per foot
d) 7 turns per foot

Which phrase is true of test ?
reports required for concrete
sidewalks, asphalt pavement,
Concrete curb, and pipe
culverts for rest areas?


a) 50% required on roadway
contracts
b) Required for federal-aid projects
only
c) Same as roadway contracts
d) Submitted in duplicate

According to FP-14, when D) 36 inches
removing existing concrete
Structure in the roadbed, how
many inches below the subgrade
elevation should the existing
Structure be removed to?


a) 12 inches
b) 24 inches
c) 30 inches
d) 36 inches

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Boffin Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1783
Member since
4 year
Number of followers
1469
Documents
7146
Last sold
1 day ago
Pilot Study

Prevent resits and get higher grades.

3.8

439 reviews

5
211
4
76
3
71
2
16
1
65

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions