Guide (Septic Tank Specifications pgs.
5-6)
render80the80permit80void80-80ans--
✔✔grading,80filling80or80other80site80modifications80that80would80adversely80affect80the80
sewage80system
septic80tank80-80ans--✔✔first80component80of80an80on‐
site80sewage80management80system,80generally80pre‐
cast80with80concrete80and80delivered80to80the80construction80site
approval80of80the80county80board80of80health80-80ans--
✔✔septic80tanks80can80be80poured80in80place80when80necessary,80plans80and80specific
ations80for80the80poured‐in‐
place80septic80tanks80must80be80submitted80to80the80health80department80prior80to80cons
truction
two80compartments80-80ans--✔✔All80septic80tanks,80pre‐
cast80or80poured80in80place,80must80be80constructed80to80standards80set80by80the80state
first80compartment80-80ans--
✔✔designed80to80contain80at80least802/380of80the80total80liquid80capacity80of80the80tank
Technical80Review80Committee80-80ans--
✔✔Septic80tanks80may80be80constructed80from80material80other80than80concrete80when8
0approved
minimum80liquid80capacity80of80a80septic80tank80-80ans--✔✔one,80two,80three,80or80four‐
bedroom80single80family80home80shall80be80not80less80than80one‐thousand80gallons
tank80capacity80-80ans--
✔✔shall80be80increased80by80two80hundred80and80fifty80gallons80for80each80additional80b
edroom80over80four
garbage80grinders80-80ans--
✔✔the80septic80tank80capacity80shall80be80increased80by80fifty80percent