United States Air Force Services Craftsman Course 7 level Questions With Complete Solutions Graded A+ TMDE - ANSWER Test Measurement Diagnostic Equipment Over all in charge of QA - ANSWER QAO Definition of re-work from the book - ANSWER The unplanned repetition of a step or a series of steps in a FWP Fundamental rule of QA / all maintenance - ANSWER Technical specifications must be met at all times Five required parts of a FWP - ANSWER 1) Materials 2) Initial conditions 3)Procedure 4)Test and Inspection 5) Restoration Difference between FWP and CWP - ANSWER CWP requires a record Objective Quality Evidence (OQE) DFS "MINOR" - ANSWER 1) Associated with a temporary repair to a system or component not involving equipment or personnel safety, or not involving integrity or operability of equipment essential to craft mission. 2) For any "As found" conditions discovered during a maintenance action that will not be corrected prior to the crafts underway. 3 Major events that lead to the QA program - ANSWER USS Iwo Jima - Wrong bolts which lead to a steam leak Space shuttle Challenger - Faulty O-Rings which lead to a fuels mixing and explosion. USS Thresher - Valves failed couldn't de ballast and sank 1. Craftsman responsibilities - ANSWER 1) Perform all maintenance actions in accordance with the approved procedure. 2) Ensure QA forms associated with the maintenance are correctly completed. 3) Enter Signature, print name and date on all QA forms completed. 2. List technical work documents - ANSWER 1) Maintenance Procedure (MP) 2) Formal Work Package (FWP) 3) Controlled Work Package (CWP)

Show more Read less
Institution
Craftsman
Course
Craftsman










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Craftsman
Course
Craftsman

Document information

Uploaded on
March 1, 2025
Number of pages
26
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

United States Air Force Services Craftsman
Course 7 level Questions With Complete
Solutions Graded A+


TMDE - ANSWER Test Measurement Diagnostic Equipment


Over all in charge of QA - ANSWER QAO


Definition of re-work from the book - ANSWER The unplanned
repetition of a step or a series of steps in a FWP


Fundamental rule of QA / all maintenance - ANSWER Technical
specifications must be met at all times


Five required parts of a FWP - ANSWER 1) Materials
2) Initial conditions
3)Procedure
4)Test and Inspection
5) Restoration


Difference between FWP and CWP - ANSWER CWP requires a record
Objective Quality Evidence (OQE)

, DFS "MINOR" - ANSWER 1) Associated with a temporary repair to a
system or component not involving equipment or personnel safety, or
not involving integrity or operability of equipment essential to craft
mission.
2) For any "As found" conditions discovered during a maintenance
action that will not be corrected prior to the crafts underway.


3 Major events that lead to the QA program - ANSWER USS Iwo Jima
- Wrong bolts which lead to a steam leak


Space shuttle Challenger - Faulty O-Rings which lead to a fuels mixing
and explosion.


USS Thresher - Valves failed couldn't de ballast and sank


1. Craftsman responsibilities - ANSWER 1) Perform all maintenance
actions in accordance with the approved procedure.
2) Ensure QA forms associated with the maintenance are correctly
completed.
3) Enter Signature, print name and date on all QA forms completed.


2. List technical work documents - ANSWER 1) Maintenance Procedure
(MP)
2) Formal Work Package (FWP)
3) Controlled Work Package (CWP)

, 3. DFS "MAJOR" - ANSWER Affects
1) Performance
2) Durability
3) Maintainability
4) Proper operation
5) Health and Safety
6)System design parameters


4. OQE - ANSWER Objective Quality Evidence


5.What is a craftsman? - ANSWER Mechanic or other individual trained
in QA methods/procedures to perform maintenance on ship's
systems/components (inspections, cleanliness, testing, documentation)


5 basic maintenance principles (PTTTM) - ANSWER Proper-
-procedure
-training
-technical direction
-testing
-materials


6, 5 responsibilities of a craftsman - ANSWER -Perform all maintenance
in accordance with approved procedure
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Brainilo

Get to know the seller

Seller avatar
Brainilo .
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
1
Documents
27
Last sold
-
Brainilo

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions