100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

AIC MOCK Exam Questions And Answers |Latest 2025 | Guaranteed Pass.

Rating
-
Sold
-
Pages
19
Grade
A+
Uploaded on
28-02-2025
Written in
2024/2025

©THEBRIGHT 2024/2025 ALL RIGHTS RESERVED 10:15AM A+ 1 AIC MOCK Exam Questions And Answers |Latest 2025 | Guaranteed Pass. What information is used to determine the required contact area of a reinforced concrete footing resting in soil? - AnswerSoil Bearing Capacity What is the following a definition of? "Reducing the duration of a project of a project usually by overlapping phases or activities that were originally planned to be done sequentially." - AnswerFast- Tracking Which of the following terms refers to the complete process of obtaining materials? - AnswerProcurement Who is responsible for ensuring that all workers on a construction project have and use personal protective equipment? - AnswerEmployer A column transfer 80 kips of load to a footing. The soil bearing capacity is known to be 1800 PSF. What is the minimum required area of the footing? - Answer44.44 Square Feet The size of the WBS should generally not exceed ___ elements. - Answer100-200 elements. The contract calls for 3011 units. The budget for the work (without overhead or profit) is $7,200.00. To date 412 units have been installed at a cost of $1,250. What is the unit cost to date and the expected profit/loss on this unit? - Answer Young's Modulus relates? - Answerstress and strain when a material is in the elastic region. What is ASHRAE the acronym for? - AnswerAmerican society of Heating, Refrigeration and Air conditioning engineers The design of an outfall sewer requires a 0.5% grade in the pipe. The outlet invert is at sea level 0.00'. The sewer run is 6 miles. What is the pipe invert at the end of the six mile run? - Answer158.4 feet The transwer of heat by air flow is called: - AnswerConvection ©THEBRIGHT 2024/2025 ALL RIGHTS RESERVED 10:15AM A+ 2 Draft 4 of Master Format makes what general change to the CSI Division Numbering System? - AnswerAdds many divisions and three new groupings. The Field Engineer or the Project Engineer doesn't assists the superintendent in solving engineering related problems. - AnswerFALSE "Mold a moist or wer sample of soil into a ball and attempt to roll it into threads as thin as 1/8- inch in diameter. Cohesive material can be successfully rolled in threads without crumbling. For example, if at least two inch (50 mm) length of 1/8-inch thread can be held on one end without tearing, the soil is cohesive." What does this describe? - AnswerPlasticity What is a good practice for break down and presentation of a building schedule of values? - Answeruse CSI Codes on the AIA G702 and G703 forms. A topographical map is drawing showing: - AnswerContour Lines and elevations. What is the primary reason that the courts disfavor a Bar Chart? - Answerit does not display the interrelationship of activities or the activity floats. The following criticla activities and their costs include: activity A, six days, $3000. Activity B, one day, $10,000 Acitivity C, ten days, $1,000 Activitiy D, Three Days, $2,500/ Which critical activity should be reviewed first for crashing? - AnswerACTIVITY C Sediment controls is required to____ - Answerkeep soils on site and out of sewers and rivers. The subfloor was___ - Answerexposed prior to the bids and subcontracting process. on bid day, you always use the low bid received from every subcontractor in compiling your bid. - AnswerFalse Purchase orders are governed by which law? - AnswerUniform Commercial Code (UCC) ©THEBRIGHT 2024/2025 ALL RIGHTS RESERVED 10:15AM A+ 3 The process of following up on orders to ensure compliance with the specifications and schedule is called Expediting, and the person who performs these duties is sometimes called an: - Answerexpediter A derrick is a type of___? - AnswerHoisting equipment What type of soil can be easily penetrated several inches by the thumb and molded by light finger pressure? - Answer Open node or dangle activities are required on all schedules? - Answerfalse. It is not logical to have activities without successors or predecessors on any schedule (except for start/end activities) A good quick ratio is___ - Answeraround 1.00 Why does the KISS rule apply to good writing? - Answer"Keep it Simple Stupid" makes the writing clear and concise. FOB job site means the vendor is responsible for shipment of the order and ownership transfers from the supplier to the buyer at the job site. - AnswerTrue The base rate for labor is $15/hr. The labor burden is 35% and 3% for small tools for the labor. There are 1000 units to install. Records indicate that trade workers can install 10 units per hour, per trade worker. The owners need 15% overhead and profit to pay bills, pay interest on loan and provide some profit tot he partners. What is the minimum bid assuming no risk avoidance factor? - Answer$2398.62 Liquidity ratios do NOT include___ - AnswerDebt to Equity The amount of air required to completely replace the air in a room or building (not to be confused with recirculated air) is called what? - AnswerAir Change A unit of measurement used for determining the cooling capacity equivalent of 12,000 BTU's per hour is which of the following? - AnswerOne ton of cooling If activity A takes 3 days and Activity B takes 6 days and they can be performed simultaneously, but must be completed before Activity C can s

Show more Read less
Institution
AIC
Course
AIC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
AIC
Course
AIC

Document information

Uploaded on
February 28, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©THEBRIGHT 2024/2025 ALL RIGHTS RESERVED 10:15AM A+




AIC MOCK Exam Questions And Answers
|Latest 2025 | Guaranteed Pass.


What information is used to determine the required contact area of a reinforced concrete
footing resting in soil? - Answer✔Soil Bearing Capacity
What is the following a definition of?
"Reducing the duration of a project of a project usually by overlapping phases or activities that
were originally planned to be done sequentially." - Answer✔Fast- Tracking
Which of the following terms refers to the complete process of obtaining materials? -
Answer✔Procurement
Who is responsible for ensuring that all workers on a construction project have and use
personal protective equipment? - Answer✔Employer
A column transfer 80 kips of load to a footing. The soil bearing capacity is known to be 1800
PSF. What is the minimum required area of the footing? - Answer✔44.44 Square Feet

The size of the WBS should generally not exceed ___ elements. - Answer✔100-200 elements.
The contract calls for 3011 units. The budget for the work (without overhead or profit) is
$7,200.00. To date 412 units have been installed at a cost of $1,250. What is the unit cost to
date and the expected profit/loss on this unit? - Answer✔

Young's Modulus relates? - Answer✔stress and strain when a material is in the elastic region.

What is ASHRAE the acronym for? - Answer✔American society of Heating, Refrigeration and Air
conditioning engineers
The design of an outfall sewer requires a 0.5% grade in the pipe. The outlet invert is at sea level
0.00'. The sewer run is 6 miles. What is the pipe invert at the end of the six mile run? -
Answer✔158.4 feet

The transwer of heat by air flow is called: - Answer✔Convection


1

,©THEBRIGHT 2024/2025 ALL RIGHTS RESERVED 10:15AM A+


Draft 4 of Master Format makes what general change to the CSI Division Numbering System? -
Answer✔Adds many divisions and three new groupings.
The Field Engineer or the Project Engineer doesn't assists the superintendent in solving
engineering related problems. - Answer✔FALSE
"Mold a moist or wer sample of soil into a ball and attempt to roll it into threads as thin as 1/8-
inch in diameter. Cohesive material can be successfully rolled in threads without crumbling. For
example, if at least two inch (50 mm) length of 1/8-inch thread can be held on one end without
tearing, the soil is cohesive."



What does this describe? - Answer✔Plasticity
What is a good practice for break down and presentation of a building schedule of values? -
Answer✔use CSI Codes on the AIA G702 and G703 forms.

A topographical map is drawing showing: - Answer✔Contour Lines and elevations.

What is the primary reason that the courts disfavor a Bar Chart? - Answer✔it does not display
the interrelationship of activities or the activity floats.
The following criticla activities and their costs include:


activity A, six days, $3000.
Activity B, one day, $10,000
Acitivity C, ten days, $1,000
Activitiy D, Three Days, $2,500/



Which critical activity should be reviewed first for crashing? - Answer✔ACTIVITY C

Sediment controls is required to____ - Answer✔keep soils on site and out of sewers and rivers.

The subfloor was___ - Answer✔exposed prior to the bids and subcontracting process.
on bid day, you always use the low bid received from every subcontractor in compiling your bid.
- Answer✔False

Purchase orders are governed by which law? - Answer✔Uniform Commercial Code (UCC)



2

, ©THEBRIGHT 2024/2025 ALL RIGHTS RESERVED 10:15AM A+


The process of following up on orders to ensure compliance with the specifications and
schedule is called Expediting, and the person who performs these duties is sometimes called
an: - Answer✔expediter

A derrick is a type of___? - Answer✔Hoisting equipment
What type of soil can be easily penetrated several inches by the thumb and molded by light
finger pressure? - Answer✔

Open node or dangle activities are required on all schedules? - Answer✔false.


It is not logical to have activities without successors or predecessors on any schedule (except
for start/end activities)

A good quick ratio is___ - Answer✔around 1.00

Why does the KISS rule apply to good writing? - Answer✔"Keep it Simple Stupid" makes the
writing clear and concise.
FOB job site means the vendor is responsible for shipment of the order and ownership transfers
from the supplier to the buyer at the job site. - Answer✔True
The base rate for labor is $15/hr. The labor burden is 35% and 3% for small tools for the labor.
There are 1000 units to install. Records indicate that trade workers can install 10 units per hour,
per trade worker. The owners need 15% overhead and profit to pay bills, pay interest on loan
and provide some profit tot he partners. What is the minimum bid assuming no risk avoidance
factor? - Answer✔$2398.62

Liquidity ratios do NOT include___ - Answer✔Debt to Equity
The amount of air required to completely replace the air in a room or building (not to be
confused with recirculated air) is called what? - Answer✔Air Change
A unit of measurement used for determining the cooling capacity equivalent of 12,000 BTU's
per hour is which of the following? - Answer✔One ton of cooling
If activity A takes 3 days and Activity B takes 6 days and they can be performed simultaneously,
but must be completed before Activity C can start, how long can you delay the start of activity
A? - Answer✔3 days.
The project manager has the authority and responsibility for the successsful completion of the
project(s) within the contract time and costs considerations. - Answer✔True

What activities and ananlysis do you perform on forward pass in a PDM? - Answer✔add
duration to ES and use highest dates when paths converge.
3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Thebright Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
177
Member since
1 year
Number of followers
6
Documents
12345
Last sold
2 days ago
Topscore Emporium.

On this page, you find verified, updated and accurate documents and package deals.

3.8

35 reviews

5
13
4
10
3
7
2
1
1
4

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions