The 1970's law that regulated stormwater is: -
correct answer ✅the Clean Water Act
Regulation outlining stormwater management on construction
sites: -
correct answer ✅NPDES
Never allowable stormwater discharge from a construction site: -
correct answer ✅discharge from contaminated groundwater
When can the notice of termination be filed? -
correct answer ✅all construction activity is complete and
permanent stabilization meets permit requirements
What must occur before construction starts for stormwater
permitting? -
correct answer ✅submit the notice of termination (NOT)
When must the stormwater notice of intent (NOI) be submitted? -
correct answer ✅after the SWPPP is prepared and before starting
construction
, Walmart / Sam's Safety, Employment, Waste,
Stormwater Compliance Certification Exam
Questions And Answers
Potential pollutant sources on a construction site may include: -
correct answer ✅all of the above
How can the SWPPP implementation sequence be modified? -
correct answer ✅after consulting with the project SWPPP designer
and receiving written approval
What is not shown on a SWPPP site map? -
correct answer ✅Notices of Violation
What information should be posted at the site entrance? -
correct answer ✅all of the above
Which of the following is not a beneficial use of water? -
correct answer ✅Flushing a spill down a storm drain
When installing and maintaining a check dam, what should you
ensure? -
correct answer ✅The low point (overflow) of the check dam is in
the middle of the channel
Stormwater Compliance Certification Exam
Questions And Answers
The 1970's law that regulated stormwater is: -
correct answer ✅the Clean Water Act
Regulation outlining stormwater management on construction
sites: -
correct answer ✅NPDES
Never allowable stormwater discharge from a construction site: -
correct answer ✅discharge from contaminated groundwater
When can the notice of termination be filed? -
correct answer ✅all construction activity is complete and
permanent stabilization meets permit requirements
What must occur before construction starts for stormwater
permitting? -
correct answer ✅submit the notice of termination (NOT)
When must the stormwater notice of intent (NOI) be submitted? -
correct answer ✅after the SWPPP is prepared and before starting
construction
, Walmart / Sam's Safety, Employment, Waste,
Stormwater Compliance Certification Exam
Questions And Answers
Potential pollutant sources on a construction site may include: -
correct answer ✅all of the above
How can the SWPPP implementation sequence be modified? -
correct answer ✅after consulting with the project SWPPP designer
and receiving written approval
What is not shown on a SWPPP site map? -
correct answer ✅Notices of Violation
What information should be posted at the site entrance? -
correct answer ✅all of the above
Which of the following is not a beneficial use of water? -
correct answer ✅Flushing a spill down a storm drain
When installing and maintaining a check dam, what should you
ensure? -
correct answer ✅The low point (overflow) of the check dam is in
the middle of the channel