Which of the following does not describe a constraint?
A Project situation is believed to be true.
B Project team actions are restricted.
C It may regard budget, resources, or schedule.
D Project team actions are dictated. - correct answer Project situations are believed to
be true.
Which of the following is true concerning the project charter?
A Describes the project schedule
B Contains cost estimates for each task
C Authorizes the start of the project work
D Lists the responsibilities of the project selection committee - correct answer
Authorizes the start of the project work
Which of the following is performed once the project charter is signed?
A You should develop the project schedule.
B You should submit the request and the project charter to the project selection
committee.
C You should write the project scope statement.
D You should hold a project kickoff meeting. - correct answer You should hold a project
kickoff meeting.
This component of the project charter describes the characteristics of the product,
service, or result of the project.
A Deliverables
B Milestones
,C Goals and objectives
D Project description - correct answer Project description
Which of these activities occur during the Planning phase? Choose three.
A Schedule
B Business case
C Budget
D High-level scope definition
E Resources
F Change control - correct answer Schedule
Budget
Resources
Randy is a key technical resource for your project. You've worked with Randy on past
projects and have identified him as one of the team members who will work on the
project. The charter has been published, and there is great excitement about this
project. You've scheduled a meeting to talk to Randy's functional manager next week.
Which of the following conditions does this describe?
A Constraint
B Deliverable
C Assumption
D Risk - correct answer Assumption
Identify the items that should not be included in a project charter. Choose three.
A Equipment and resources needed
B Business case
C Project description
D High-level list of risks
E High-level budget
F Project objectives
,G High-level cost-benefit analysis - correct answer Equipment and resources needed
Business case
High-level cost-benefit analysis
This person is responsible for publishing, signing, and approving the project charter.
A Project manager
B Project champion
C Executive in the organization who requested the project
D Project sponsor - correct answer Project sponsor
The Initiating phase includes which task?
A Creating a work breakdown structure
B Approving a project and authorizing work to begin
C Coordinating resources to complete the project work
D Identifying and planning for detailed risks - correct answer Approving a project and
authorizing work to begin
Your project is to be performed outdoors. You have only four days from the big event,
and there is a hurricane headed for shore. This is an example of which of the following?
A Constraint
B Risk
C Assumption
D Deliverable - correct answer Risk
Quality assurance, performance measuring and reporting, and change control are all
part of which process?
A Monitoring and Controlling
B Closing
C Planning
, D Executing - correct answer Monitoring and Controlling
Who gets the authority to assign organizational resources to the work of the project after
the project charter is signed and approved?
A The project champion
B The project scheduler
C The project requestor
D The project manager - correct answer The project manager
The Closing phase addresses which of the following? Choose three.
A Governance processes
B Lessons learned
C Project sign-off
D Deliverables verification
E Integration plan is put into place.
F Change control closeout - correct answer Lessons learned
Project sign-off
Integration plan is put into place.
From the following options, select those that best describe the definition of a
deliverable. Choose three.
A Describes detailed characteristics
B Is a specific item that must be produced to consider the project complete
C Has measurable outcomes or results
D Marks the completion of a project phase
E Is tangible and easily verified
F Is documented in the business case - correct answer Is a specific item that must be
produced to consider the project complete
Has measurable outcomes or results