Comp # 8 PV Exam Questions and Answers 100% Pass While assessing a customer's property for a solar system installation, note where any overhead lines are in relationship to the - The installation site When performing a site assessment, it is best to obtain copies of the customer's electric bills for the past - 12 months When assessing the possibility of installing a solar panel array on a roof, the assessor must determine the dead load of the roof, which is - the weight of permanent, stationary construction, and equipment included in a building Which BOS components are used to tie multiple panels together? - Combiners The roof ground should be a solid copper conductor with the minimum size of - 6 AWG The typical distance between the standoff mounted panels and the roof surface is - 3 - 5 inches 2100% Pass Guarantee Sophia Bennett, All Rights Reserved © 2025 Solar panel installation areas need to receive a minimum of how many full hours of sunlight per day for best performance? - 6 hours A proposed installation will have 5 rows of 4 panels, each that will be installed lengthwise. If each panel is 60" long and 26" wide, and the panels are separated by 2", how much space will be needed for the installation? - 235 sq ft Ideally, the roof should be replaced prior to PV system installation if a customer expects it to last for less than - 10 years A PV system with 2 days of autonomy can support it's essential loads for 2 days without - dropping below the allowable depth of discharge levels Any disconnects for the BOS components need to be easily a

Show more Read less
Institution
Photovolt
Course
Photovolt









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Photovolt
Course
Photovolt

Document information

Uploaded on
February 26, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Comp # 8 PV Exam Questions and
Answers 100% Pass


While assessing a customer's property for a solar system installation, note where any

overhead lines are in relationship to the - ✔✔The installation site


When performing a site assessment, it is best to obtain copies of the customer's electric

bills for the past - ✔✔12 months


When assessing the possibility of installing a solar panel array on a roof, the assessor

must determine the dead load of the roof, which is - ✔✔the weight of permanent,

stationary construction, and equipment included in a building


Which BOS components are used to tie multiple panels together? - ✔✔Combiners


The roof ground should be a solid copper conductor with the minimum size of - ✔✔6

AWG


The typical distance between the standoff mounted panels and the roof surface is - ✔✔3

- 5 inches




100% Pass Guarantee Sophia Bennett, All Rights Reserved © 2025 1

, Solar panel installation areas need to receive a minimum of how many full hours of

sunlight per day for best performance? - ✔✔6 hours


A proposed installation will have 5 rows of 4 panels, each that will be installed

lengthwise. If each panel is 60" long and 26" wide, and the panels are separated by 2",

how much space will be needed for the installation? - ✔✔235 sq ft


Ideally, the roof should be replaced prior to PV system installation if a customer expects

it to last for less than - ✔✔10 years


A PV system with 2 days of autonomy can support it's essential loads for 2 days

without - ✔✔dropping below the allowable depth of discharge levels


Any disconnects for the BOS components need to be easily accessible from the -

✔✔ground level


All tools and hardware being used on a solar site assessment must be - ✔✔controlled at

all times


The default azimuth angle for locations in the northern hemisphere is - ✔✔180 degrees


What is the voltage when current is 20A and the resistance is 12 ohms? - ✔✔240 Volts


Which of the following is true regarding a grid-interactive system? - ✔✔it provides

power when there is a grid outage


What is the resistance when the voltage is 120V and the amperage is 5A - ✔✔24 ohms



100% Pass Guarantee Sophia Bennett, All Rights Reserved © 2025 2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SophiaBennett Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
130
Member since
1 year
Number of followers
5
Documents
9104
Last sold
3 weeks ago
EXAM GAME-CHANGER

Exam Questions and Answers Section : Study Like a Pro, Study Smart, Study with Sophia.

3.7

26 reviews

5
10
4
5
3
7
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions