OVERALL EQUIPMENT EFFECTIVENESS EXAM QUESTIONS AND ACCURATE ANSWERS 2024/2025 | VERIFIED

Institution
OVERALL EQUIPMENT EFFECTIVENESS
Course
OVERALL EQUIPMENT EFFECTIVENESS









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
OVERALL EQUIPMENT EFFECTIVENESS
Course
OVERALL EQUIPMENT EFFECTIVENESS

Document information

Uploaded on
February 24, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

OVERALL EQUIPMENT EFFECTIVENESS EXAM QUESTIONS AND ACCURATE
ANSWERS 2024/2025 | VERIFIED
5 Why Analysis - ✔️✔️A simple process originally created by Sakichi Toyoda at the Toyota Motor
Company for identifying the root cause behind a particular problem. Start with a problem definition, and
keep asking "why" until the root cause is uncovered.


5S - ✔️✔️A Lean Manufacturing process that creates an organized work area. 5S has five steps: Sort
(eliminate unneeded items), Set (organize remaining items), Shine (clean and inspect the work area),
Standardize (document standards for the area), Sustain (apply and audit the standards).


Actual Cycle Time - ✔️✔️The actual time to produce one part. In OEE, calculated as Run Time divided
by Total Count. Used in calculating OEE Performance. A variation of the calculation uses Actual Run Rate
instead.


Actual Run Rate - ✔️✔️The actual rate of production, when it is running. In OEE, calculated as Total
Count divided by Run Time. Used in calculating OEE Performance. A variation of the calculation uses
Actual Cycle Time instead.


All Time - ✔️✔️24 hours in a day, 7 days in a week. All time refers to every minute of every day.


Andon - ✔️✔️Indicator above production line to signal production conditions. Often uses
green/yellow/red colors to indicate status.


Autonomous Maintenance - ✔️✔️A process from TPM (Total Productive Maintenance) for improving
machine OEE by engaging operators to complete routine maintenance, inspection, and lubrication
activities.


Availability Loss - ✔️✔️One of the three OEE Losses. Availability takes into account Equipment Failures
and Setup and Adjustments. An Availability score of 100% means that the process is always running
during Planned Production Time.


Best Practice - ✔️✔️Methods that are considered "state of the art" by the most respected in an
industry. Successful companies use different methods than unsuccessful companies.

, Brainstorming - ✔️✔️A process for creating an expanded world of ideas and possibilities. Brian
storming is a divergent problem solving process that is intended to create a broad range of ideas that can
then be refined by a root cause process.


Breakdowns - ✔️✔️A type of Unplanned Stop where time is lost due to Equipment Failure (one of the
Six Big Losses). Breakdowns are a type of Unplanned Stop and affect OEE Availability.


Breaks - ✔️✔️Unproductive time where the process is scheduled not to run because the crew is
scheduled to be away from the line. Breaks are typically excluded from OEE calculations.


Capacity - ✔️✔️The maximum amount of production available if equipment is fully productive (running
at 100% OEE), for All Time (24/7).


Changeover - ✔️✔️The manufacturing process is scheduled for production and is not running because
of a planned Setup, Make Ready, or Adjustment event. Changeovers are a type of Planned Stop and
affect OEE Availability.


Constraint - ✔️✔️The step of the manufacturing process that acts as a bottleneck to the throughput of
the entire process. OEE should always be measured at the constraint as it is the slowest step in the
process.


Countermeasures - ✔️✔️An action to counter or mitigate a manufacturing loss. A manufacturing loss
may benefit from multiple countermeasures including immediate actions to prevent the loss from
getting worse, short term fixes and long term root cause fixes.


Cycle Time - ✔️✔️The time to produce one part. Inverse of Run Rate.


Cycle Time Analysis - ✔️✔️Tool used to better understand issues that affect Performance. Important to
automate logging of Cycle Times for later analysis.


Defect - ✔️✔️Any part that is not right first time. Defects may be reworked, or scrapped. All defects are
a loss to OEE Quality.


Design Cycle Time - ✔️✔️See Ideal Cycle Time.
$12.98
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
DrRashford

Get to know the seller

Seller avatar
DrRashford Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
0
Documents
100
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions