Questions and CORRECT Answers
If lead to height ratio is between 1/2 and 3/4 and only 2 or 3 spans the head guy should be_____
than suspension strand. - CORRECT ANSWER - One SIze Larger
Important set of deliverables - CORRECT ANSWER - Design documents
OSP cost variance - CORRECT ANSWER - 10%
CSI 27
CSI 28
CSI 31
CSI 33
CSI26 - CORRECT ANSWER - Telecommunications
electrical safety and security'
Earth work
Utilities
Electrical
NAP groupings - CORRECT ANSWER - 4,6,8,12
4 parts security - CORRECT ANSWER - Prevent, Detect,Alarm,Secure
3 components of EMI - CORRECT ANSWER - Unbalanced electromagnetic fields of the
power system, Coupling between power and telecommunications and susceptibility of the tele
system
, Direct buried cables collects ground strikes with a distance determined by soil resistance
typically? - CORRECT ANSWER - 6.6' to 19.7'
A reading of______ ampres is the best possible reading for any bonding conductor, AC should be
less than 1A and DC 500 Miliampres - CORRECT ANSWER -0
Maximum value for 2 point bonding in central offices? - CORRECT ANSWER - .1 Ohms
Trencher used in soft loamy soils or loose clay soils depths up to 5' 3' for smaller trenchers -
CORRECT ANSWER - Vibratory
Trencher used in tight soils, heavy clays or loose rock Depth sup to 5' - CORRECT
ANSWER - Static
Trenchers used in Hardend clay rock soil or adverse conditions - CORRECT ANSWER -
Rip plow
Maximum connector loss reccomended - CORRECT ANSWER - .75 DB
____ have individual jackets for each tight buffered fiber.______ has one jacket and is lower
cost. - CORRECT ANSWER - Breakout, Distribution
_______ and ______ are not used after the first 24 binders. - CORRECT ANSWER -
Violet and slate
Load coil designs to counter the effects of capacitance buildup in loop lengths over? -
CORRECT ANSWER - 5.5 KM
Baseband cabling used in lengths up to? - CORRECT ANSWER - 328'