with Approved Answers | 100% i,- i,- i,- i,- i,-
Correct | Latest 2025/2026. i,- i,- i,-
You are renovating a healthcare facility for patients with mental
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
and psychological disorders. Based on research on color in
i,- i,- i,- i,- i,- i,- i,- i,- i,-
healing environments, which of the following is the MOST
i,- i,- i,- i,- i,- i,- i,- i,- i,-
appropriate wall color choice for the individual patient rooms?
i,- i,- i,- i,- i,- i,- i,- i,-
A. Red-orange
i,- i,-
B. Blue-green
i,-
C. Yellow
i,-
D. Violet
i,- i,-i,- i,- Answer: B i,-
You are field verifying a space to document existing conditions.
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
Which of the following steps is MOST important?
i,- i,- i,- i,- i,- i,- i,-
A. Matching the dimensioning system that will be used to
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
develop CADD drawings i,- i,-
B. Establishing a dimension convention prior to commencing site
i,- i,- i,- i,- i,- i,- i,- i,- i,-
work
C. Indicating field measurements in inches for simplicity
i,- i,- i,- i,- i,- i,- i,-
D. Recording clear door width and frames separately
i,- i,- i,- i,- i,- i,- i,- i,-i,- i,- Answer: i,-
B
,What does the horizontal line in a two-point perspective suggest?
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
A. A line parallel to the picture plane
i,- i,- i,- i,- i,- i,- i,-
B. A sight line projecting from the station point
i,- i,- i,- i,- i,- i,- i,- i,-
C. A line perpendicular to the line of projection
i,- i,- i,- i,- i,- i,- i,- i,-
D. A line representing eye-level height
i,- i,- i,- i,- i,- i,-i,- i,- Answer: D i,-
What must you determine FIRST before space planning a
i,- i,- i,- i,- i,- i,- i,- i,- i,-
commercial building's interior? i,- i,-
A. Number of exits and means of egress required
i,- i,- i,- i,- i,- i,- i,- i,-
B. Occupancy classification for the building
i,- i,- i,- i,- i,-
C. Construction type
i,- i,-
D. Maximum occupancy load
i,- i,- i,- i,-i,- i,- Answer: B i,-
Your client would like to relocate from an existing ground floor
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
location to several floors in a new building. You have been hired
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
to evaluate the feasibility of the move. Which action should you
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
take FIRST?
i,-
A. Interview several employees from each division of the company
i,- i,- i,- i,- i,- i,- i,- i,- i,-
B. Determine the usable floor area of each floor of the new
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
building
C. Assess which spaces will make up the core of the building
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
, D. Locate all load-bearing components on each floor
i,- i,- i,- i,- i,- i,- i,- i,-i,- i,- Answer: i,-
B
When are three-dimensional studies MOST useful in the design
i,- i,- i,- i,- i,- i,- i,- i,- i,-
process?
A. In the final contract document presentation
i,- i,- i,- i,- i,- i,- i,-
B. During the programming phase
i,- i,- i,- i,- i,-
C. As a rough sketch during the schematic stage
i,- i,- i,- i,- i,- i,- i,- i,- i,-
D. Throughout the entire design process
i,- i,- i,- i,- i,- i,-i,- i,- Answer: D i,-
The low bidder for a raised flooring contract submits pricing on
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
four product lines that meet specifications. All four products are
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
below budget. The client wants you to use the least expensive
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
product, but you know that it is new to the market and has no
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
performance record. What should you do before making your i,- i,- i,- i,- i,- i,- i,- i,- i,-
recommendation?
A. Have the supplier provide references and review them with the
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
client.
B. Have the supplier provide finish samples and review them with
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-
the client.
i,-
C. Recommend the least expensive product, as the client
i,- i,- i,- i,- i,- i,- i,- i,- i,-
requested.