CQM for USACE With Complete Solution Latest Update
CQM for USACE With Complete
Solution Latest Update
Construction quality management - ✔✔✔-The performance of tasks, which ensure
that construction is performed according to plans and specifications, on time,
within a defined budget, and a safe work environment.
Quality - ✔✔✔-Conformance to properly developed requirements
Purpose of CQM - ✔✔✔-The government's efforts, separate from, but in
coordination and cooperation with the contractor, assure that the quality set by the
plans and specifications is achieved.
Contractor quality control function - ✔✔✔-To assure that the completed project
meets all quality requirements of the contract.
Contractor benefits of CQM - ✔✔✔-Increased profit and production, better
communications, planning, improved organizational skills, and outstanding
performance evaluations to obtain future contracts.
Two factors cause construction industry to become highly specialized - ✔✔✔-
Changing market and increased tech and regulations
Factors that will influence both the govt and construction industry in the future -
✔✔✔-New govt regulations, greater influence from customer, improvement of QC
and QA requirements, construction-oriented mgmt info systems, formal partnering
involving stakeholders, more reliance on design-build, more consideration for life
cycle requirements, increased performance based incentives
Pre construction submittals - ✔✔✔-Required prior to or at start of construction or
the next major phase on a multi phase contract
©®™ Page 1
, CQM for USACE With Complete Solution Latest Update
Preconstruction submittals include: - ✔✔✔-Scheduled and a tabular list of locations,
features, and other pertinent information regarding products, materials,
equipment, or components to be used in work
Product data - ✔✔✔-Catalog cuts, illustrations, schedules, diagrams, performance
charts, instructions, systems and equipment
Samples - ✔✔✔-Fabricated or I fabricated physical examples of materials,
equipment, or workmanship that illustrate functional and aesthetic characteristics
of material or product that establish standards
Design data - ✔✔✔-Calculations, mix designs, analyses pertaining to a part of work
Test reports - ✔✔✔-Signed by authorized official of laboratory that a material,
product or system to be provided has been tested in accord with specified
requirements, unless otherwise specified, must have been done within 3 years of
date of contract award
Certificates - ✔✔✔-Statements printed on the manufacturer's letterhead and
signed by responsible officials of manufacturer's product, system, or material
meets spec requirements. Must be dated after award of project contract and
clearly name the project
Manufacturer's instructions - ✔✔✔-Preprinted material describing installation of a
product, system, or material, including special notices and concerning impedances,
hazards, and safety instructions
Operation and maintenance data - ✔✔✔-Data provided by the manufacturer, or
system provider, including help and product line documentation, necessary to
maintain and install equipment for operating and maintenance use
©®™ Page 2
CQM for USACE With Complete
Solution Latest Update
Construction quality management - ✔✔✔-The performance of tasks, which ensure
that construction is performed according to plans and specifications, on time,
within a defined budget, and a safe work environment.
Quality - ✔✔✔-Conformance to properly developed requirements
Purpose of CQM - ✔✔✔-The government's efforts, separate from, but in
coordination and cooperation with the contractor, assure that the quality set by the
plans and specifications is achieved.
Contractor quality control function - ✔✔✔-To assure that the completed project
meets all quality requirements of the contract.
Contractor benefits of CQM - ✔✔✔-Increased profit and production, better
communications, planning, improved organizational skills, and outstanding
performance evaluations to obtain future contracts.
Two factors cause construction industry to become highly specialized - ✔✔✔-
Changing market and increased tech and regulations
Factors that will influence both the govt and construction industry in the future -
✔✔✔-New govt regulations, greater influence from customer, improvement of QC
and QA requirements, construction-oriented mgmt info systems, formal partnering
involving stakeholders, more reliance on design-build, more consideration for life
cycle requirements, increased performance based incentives
Pre construction submittals - ✔✔✔-Required prior to or at start of construction or
the next major phase on a multi phase contract
©®™ Page 1
, CQM for USACE With Complete Solution Latest Update
Preconstruction submittals include: - ✔✔✔-Scheduled and a tabular list of locations,
features, and other pertinent information regarding products, materials,
equipment, or components to be used in work
Product data - ✔✔✔-Catalog cuts, illustrations, schedules, diagrams, performance
charts, instructions, systems and equipment
Samples - ✔✔✔-Fabricated or I fabricated physical examples of materials,
equipment, or workmanship that illustrate functional and aesthetic characteristics
of material or product that establish standards
Design data - ✔✔✔-Calculations, mix designs, analyses pertaining to a part of work
Test reports - ✔✔✔-Signed by authorized official of laboratory that a material,
product or system to be provided has been tested in accord with specified
requirements, unless otherwise specified, must have been done within 3 years of
date of contract award
Certificates - ✔✔✔-Statements printed on the manufacturer's letterhead and
signed by responsible officials of manufacturer's product, system, or material
meets spec requirements. Must be dated after award of project contract and
clearly name the project
Manufacturer's instructions - ✔✔✔-Preprinted material describing installation of a
product, system, or material, including special notices and concerning impedances,
hazards, and safety instructions
Operation and maintenance data - ✔✔✔-Data provided by the manufacturer, or
system provider, including help and product line documentation, necessary to
maintain and install equipment for operating and maintenance use