Asphalt Paving GC Exam |219 Questions with Answers

Institution
Asphalt Paving GC
Course
Asphalt Paving GC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Asphalt Paving GC
Course
Asphalt Paving GC

Document information

Uploaded on
February 18, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Asphalt Paving GC Exam |219
Questions with Answers
Base Course - -Layer or layers of specified material of designated thickness
or rate of application based on a subbase or subgrade to support the
subsequent layers

- Bridge - -Over a depression; longer than 20'

- The subgrade is the top _______ of roadbed upon which the pavement
structure and shoulders are constructed - -18"

- Do not use glass in the top _____ of the embankment - -18"

- Clear and grub minimum of ____ from each edge of proposed pavement
along both lanes and legs of interchange - -30'

- Where clearing and grubbing within the roadway is indicated at a bridge
site, clear by cutting all trees, stumps, etc. to within ______ of the ground or
to low water in the full width of the ROW for a distance of 75' beyond the
beginning and end of the proposed bridge - -8"

- Compact the subgrade between the lines ____ inches outside the area
occupied by the pavement structure, including C&G & SW to not less than
95% of max density - -18"

- Pulverize base course material so that the completion of the moist mixing
100% (by dry weight) passes the 1.5" sieve and a minimum of _____ passes
the #4 sieve, exclusive of gravel and stone retained on the sieve - -80%

- #4 sieve - -4.75 mm

- Ensure finished surface of base varies neither than 3/8" from a straight
edge 10' long when applied parallel to the CL of the rd, no more than ______
inch from the typical cross-section on the plans - -1/2"

- Thickness of completed modified base is measured at staggered intervals
not to exceed _____ feet in length for two-lane roads - -250'

- Use _______ in all base courses as an anti-stripping additive - -hydrated
lime

- Where plans required uniform thickness of base course and the contract
provides for pavement on sq yd bases, thickness of base course is

, determined from measurements taken of the completed base course at
intervals not exceeding _____ feet for two-lane roads - -500'

- For HMA, use aggregates with a combined specific gravity of _____ or less -
-2.90

- ON HMA use pneumo-rollers that are self propelled and have an effective
rolling width of not less than _______ - -60"

- Ensure intermediate rolling of HMA is completed before mat temp drops
below _____ - -175 degrees

- First step in applying asphalt surface treatment (single) - -Clean surface

- Last step in applying asphalt surface treatment (single) - -Remove excess
aggregate

- Spread aggregate for HMA within _____ feet of the application of the
emulsion - -200'

- Place asphalt surface treatment (double) within ____ days of the base
course being primed - -7

- When rolling aggregate applications for asphalt surface treatment (double)
on each trip of the roller, overlap prior by _____ the width of the roller - -1/2

- On portland cement pavement, position lower surface of preformed joint
filler on or below surface of base while upper surface is _____ inches below
surface of the slab - -1/2"

- When using surface vibrators on portland concrete, ensure frequency is not
less than ______ impulses per minute - -3500

- Construct subbase and base beneath concrete pavement to include area
_____ inches in width extending beyond edges to provide stability for paver
tracks - -18"

- Min. width of any reinforced concrete slab is ______ feet - -16'

- Max. length of any reinforced concrete slab is ______ feet - -20'

- Exclude all vehicle traffic from newly constructed concrete pavement for a
period of not less than ______ days - -14

- Finish joints should not deviate more than ____ inch in the horizontal
alignment from a straight line - -1/4"

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AccurateScores Not yet listed
View profile
Follow You need to be logged in order to follow users or courses
Sold
541
Member since
3 year
Number of followers
336
Documents
15259
Last sold
5 days ago

3.7

113 reviews

5
51
4
18
3
18
2
11
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions