100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

DEQ- Stormwater Mangement Inspector UPDATED Exam Questions and CORRECT Answers

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
16-02-2025
Written in
2024/2025

DEQ- Stormwater Mangement Inspector UPDATED Exam Questions and CORRECT Answers What two plans in the SWPPP must be approved? - CORRECT ANSWER - Erosion and sediment control plans and stormwater management plans must be approved. Does the stormwater management plan address runoff during construction or after? - CORRECT ANSWER - The stormwater management plan addresses post-construction stormwater runo

Show more Read less
Institution
DEQ
Course
DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DEQ
Course
DEQ

Document information

Uploaded on
February 16, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

DEQ- Stormwater Mangement Inspector
UPDATED Exam Questions and
CORRECT Answers
What two plans in the SWPPP must be approved? - CORRECT ANSWER - Erosion and
sediment control plans and stormwater management plans must be approved.


Does the stormwater management plan address runoff during construction or after? - CORRECT
ANSWER - The stormwater management plan addresses post-construction stormwater
runoff.


What impact does impervious cover have on water quality? - CORRECT ANSWER -
Impervious cover increases stormwater runoff volume and velocity, leading to higher pollutant
levels like sediment and phosphorus, negatively affecting water quality.


What is the target pollutant in the water quality criteria? - CORRECT ANSWER -
Phosphorus


What is the lower limit of imperviousness that can result in stream degradation? - CORRECT
ANSWER - 10%


What destructive forces does the SWM regulation protect against? - CORRECT
ANSWER - Channel erosion and flooding.



How does the rate of runoff change after development? - CORRECT ANSWER - Runoff
rate increases post-development due to vegetation replacement with impervious surfaces,
potentially causing erosion and flooding.


What must a locality's ordinance require for submission and approval? - CORRECT
ANSWER - ESC plan and SWM plan (9VAC25-870-148)

, List three violations for which a penalty may be imposed. - CORRECT ANSWER -
Violations include: No registration date, No SWPPP, Incomplete SWPPP, SWPPP not available
for review, No approved ESC plan, Failure to install stormwater management BMPs or ESCs,
Improperly installed or maintained stormwater BMPs or ESCs, Operational deficiencies, Failure
to conduct required inspections, Incomplete, improper, or missed inspections.


Maximum Penalty under the Stormwater Act - CORRECT ANSWER - $32,500



Locality VSMP Authority Registration Statement Retention - CORRECT ANSWER -
Must be documented and retained for at least three years from project completion or permit
termination


DEQ Program Reviews Frequency - CORRECT ANSWER - DEQ conducts a program
review once every five years


Construction Site Inspection Frequency by VSMP Authority - CORRECT ANSWER -
Periodically for compliance with ESC plan, SWM plan, pollution prevention plan, and TMDL
control measures


Locations for Notice of Coverage Letter Posting - CORRECT ANSWER - Near main
entrance of construction activity and in general information section of SWPPP


Options for Making SWPPP Available to Public - CORRECT ANSWER - Electronic
format or hard copy upon request at a publicly accessible location


General Information in SWPPP - CORRECT ANSWER - Includes signed registration
statement, notice of coverage letter, Construction GP, project description, and site plan


Qualified Personnel Inspection Frequency for Temporary Stabilized Areas - CORRECT
ANSWER - Once per month

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1090
Member since
1 year
Number of followers
102
Documents
68972
Last sold
1 day ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

175 reviews

5
75
4
31
3
46
2
8
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions