100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CQM-C QUESTIONS AND ANSWERS LATEST UPDATE

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
16-02-2025
Written in
2024/2025

CQM-C QUESTIONS AND ANSWERS LATEST UPDATE

Institution
CQM
Course
CQM








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CQM
Course
CQM

Document information

Uploaded on
February 16, 2025
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • cqm

Content preview

CQM-C QUESTIONS AND ANSWERS
LATEST UPDATE


The lpurpose lof lConstruction lQuality lManagement lis lto: l- lCorrect lAnswer-Achieve lthe
lquality lestablished lby lproperly ldeveloped lrequirements lthrough lthe lcombined

lresponsibility, lbut lseperate lefforts lof lcontractpr lsmd lgovernment lpersonnel.




Construction lQuality lManagement lis lthe lperformance lof ltasks, lwhich lensure lthat
lconstruction lis lperformed. l- lCorrect lAnswer-According lto lplans land lspecifications, lon

ltime, lwithin la ldefined lbudget land la lsafe lwork lenvironment.




Partnering lrelationships lare lbased lupon: l- lCorrect lAnswer-Building ltrust land ldedication
lto lcommon lgoals




It lis lthe lresponsibility lof lQuality lAssurance lPersonnel lto: l- lCorrect lAnswer-Periodically
lverify lthat lthe lcontractors lsystem lof lcontrol lis lworking leffectively.




An leffective lcontractor lquality lcontrol lprogram lwill: l- lCorrect lAnswer-Be lan lincentive lfor
lwork lto lbe ldone lcorrectly lthe lfirst ltime lresulting lin learlier lcompletion, lreduced lfield

loverhead lcosts, land lgreater lprofits.




The lsuccess lor lfailure lof lall lcontractors lis lbased lupon: l- lCorrect lAnswer-The lability lto
lcontrol lcosts, lfinance lwork, lestimate ljobs, lschedule lthe lwork, land lmaintain leffective

lquality lcontrol.




Quality lAssurance lPersonnel lhave lthe lresponsibility lto: l- lCorrect lAnswer-Require
lcontractors lto lmaintain lthe lquality lspecified lin lthe lplans land lspecifications.




Inspection lis: l- lCorrect lAnswer-The lprocess lby lwhich longoing land lcompleted lwork lis
lexamined




During lthe lpunch-out linspection lof la lproject: l- lCorrect lAnswer-Quality lAssurance
lPersonnel lmust lassure lthat lthe lcontractor lprepares la lpunch-list land lmakes lcorrections.




If lthere lis la ldisagreement lwhether lthe lcontractors lwork lcomplies lwith lthe lcontract: l-
lCorrect lAnswer-The lgovernment lmakes lthe lfinal ldetermination
$8.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TestWise

Get to know the seller

Seller avatar
TestWise Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
1
Documents
110
Last sold
-
SMART STUDY HUB

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions