NERC Transmission Practice Test Exam 2025/2026 Questions With Completed & Verified Solutions.

Institution
NERC
Course
NERC








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
February 14, 2025
Number of pages
1
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC Transmission Practice Test

A transmission line between Bus A and Bus B has MW flow from Bus B to Bus A. After
the tripping of a parallel line, the line flow from Bus B to Bus A exceeds the lines thermal
rating. Which of the following actions would assist the operator in correcting the
problem? - ANS Increase generation at Bus A
\If a Balancing Authority is unable to calculate ACE for more than _________ minutes it
shall notify its Reliability Coordinator. - ANS 30
\If your system has lost a large amount of customer load due to a system disturbance,
but has remained connected to all of your neighbors, what is the best solution to
consider? - ANS Coordinate with the neighbors
\The coordination of voltage schedules by system operators would be utilized to reduce
all of the following EXCEPT - ANS Reactive inadvertent
\Underfrequency load shedding is set-up so that which of the following does NOT occur?
- ANS Uncontrolled separation
\What is a major concern for a System Operator during emergency conditions? - ANS
System remains connected to the Interconnection
\What should a system operator expect to see if the generator increases its excitation? -
ANS An increase in MVAR output
\Which type of relay operates on the premise of comparing the flow in and out of the area
of protection? - ANS Differential relay
\Who is responsible to make sure that the operation of voltage control equipment is
coordinated with other impacted entities? - ANS Transmission Operator
\You report for work on a peak summer day with expected high temperatures and load.
What can you do to maintain an adequate system voltage profile? - ANS Get under the
voltage by placing capacitors in service while maintaining operating limits
\Your system configuration presents you with a situation of having two parallel lines
between two stations. The lines have different ratings. Line A has a rating of 250 MVA,
while line B has a rating of 200 MVA. Based on the line ratings, what is the first
contingency transfer capability between the two stations? - ANS 200 MVA
\

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LEWIS12 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
23
Member since
1 year
Number of followers
1
Documents
1013
Last sold
5 days ago

3.3

3 reviews

5
1
4
0
3
1
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions