NERC
A Balancing Authority can only implement interchange schedules with which one of the
following? - ANS Adjacent Balancing Authorities
\According to NERC Standards, which of the following is responsible for ensuring that
transaction tags are submitted? - ANS Load-serving PSE
\If Balancing Area A has an interchange schedule export of 200 MW to Balancing Area B
that started on the hour, what would be the hourly integrated value for the transaction if
the schedule were reduced to 100 MWon the half hour? - ANS 150
\If Balancing Area A has the following schedules (100 MW import, 50 MW export, 100 MW
import, 75 MW import), what is the net schedule interchange for the area? - ANS 225 MW
into Balancing Area A
\What is the calculation used for determining inadvertent interchange? - ANS Net actual
interchange minus net scheduled interchange
\Which of the following are responsible for confirming the ramp times and duration for
interchange transactions? 1. Sending Balancing Authority 2. Transmission Service
Provider 3. Receiving Balancing Authority 4. Scheduling Agent - ANS 1 & 3
\Which of the following elements are NOT contained in the interchange transaction TAG?
- ANS Cost
\Which of the following entities may a Balancing Area provide interchange transaction
information to? - ANS PSEs involved in the transaction
\Which of the following information is NOT necessary for a system operator to know in
order to implementan interchange schedule? - ANS Source generator
\Which of the following is responsible initiating the implementation of each Interchange
Transaction as tagged? - ANS Sink Balancing Authority
\Which of the following must be agreed on by the Sending and Receiving Balancing
Authorities? 1. Interchange Schedule start and end time 2. Energy profile 3. Ramp start
time and duration 4. Constraints - ANS 1, 2, & 3
\Which of the following would be a suitable use for a pseudo-tie? - ANS Accounting for
jointly owned generators
\
A Balancing Authority can only implement interchange schedules with which one of the
following? - ANS Adjacent Balancing Authorities
\According to NERC Standards, which of the following is responsible for ensuring that
transaction tags are submitted? - ANS Load-serving PSE
\If Balancing Area A has an interchange schedule export of 200 MW to Balancing Area B
that started on the hour, what would be the hourly integrated value for the transaction if
the schedule were reduced to 100 MWon the half hour? - ANS 150
\If Balancing Area A has the following schedules (100 MW import, 50 MW export, 100 MW
import, 75 MW import), what is the net schedule interchange for the area? - ANS 225 MW
into Balancing Area A
\What is the calculation used for determining inadvertent interchange? - ANS Net actual
interchange minus net scheduled interchange
\Which of the following are responsible for confirming the ramp times and duration for
interchange transactions? 1. Sending Balancing Authority 2. Transmission Service
Provider 3. Receiving Balancing Authority 4. Scheduling Agent - ANS 1 & 3
\Which of the following elements are NOT contained in the interchange transaction TAG?
- ANS Cost
\Which of the following entities may a Balancing Area provide interchange transaction
information to? - ANS PSEs involved in the transaction
\Which of the following information is NOT necessary for a system operator to know in
order to implementan interchange schedule? - ANS Source generator
\Which of the following is responsible initiating the implementation of each Interchange
Transaction as tagged? - ANS Sink Balancing Authority
\Which of the following must be agreed on by the Sending and Receiving Balancing
Authorities? 1. Interchange Schedule start and end time 2. Energy profile 3. Ramp start
time and duration 4. Constraints - ANS 1, 2, & 3
\Which of the following would be a suitable use for a pseudo-tie? - ANS Accounting for
jointly owned generators
\