100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NERC RC Exam 2025/2026 Questions With Completed & Verified Solutions.

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
14-02-2025
Written in
2024/2025

NERC RC Exam 2025/2026 Questions With Completed & Verified Solutions.

Institution
NERC
Course
NERC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
February 14, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC RC Exam

A generator must be equipped with a governor if it is over how many mw - ANS 10mw
\A governor is isochronous if the droop is what - ANS 0%
\According to DCS, a contingency is considered a reportable disturbance if it is what
percent of the MSSC - ANS 80%
\Ace calculation occurs how often - ANS 6 seconds
\ACE cannot exceed BAAL for how long - ANS 30 minutes
\Alternative interpersonal communication capability testing should be completed how
often by TOP/BA/RC - ANS 30 days/monthly
\Annual testing of backup control facility must prove to be functional for this long - ANS
2 hours
\ATC for the next 12 months (months 2-13) should be calculated how often - ANS Weekly
\B in ACE equation should be what percent of annual peak load - ANS 1%
\BA with loss of resources must submit RFI with start time no more than how far beyond
the resource loss - ANS 60 minutes
\BA's frequency & ACE metering equipment should be available with a minimum
accuracy of 0.001Hz for what percent of the year - ANS 99.5%
\BAL-002 default contingency reserve restoration period (following disturbance recovery
period) - ANS 90 minutes
\Changes to Operating plan with regards to backup facility should be updated/approved
within how many days of the change - ANS 60 calendar days
\Common standard time period for station battery to handle outage of AC power to
chargers - ANS 8-12 hours
\Complete loss of communication (including backup) is reportable if it lasts longer than...
- ANS 30 minutes
\Conflicts between neighboring RC restoration plans should be resolved how quickly -
ANS 30 calendar days
\Congestion management requests in Eastern Interconnection from one RC to another
must be implemented how quickly - ANS 15 minutes
\CPS-1 12 month compliance factor is evaluated how often - ANS monthly
\CPS-1 compliance factor is for how long of a period - ANS 12 months
\CPS-1 compliance factor requirement - ANS at least 100%
\CPS-1 measures the average frequency vs. NERC frequency target how often - ANS 1
minute
\DCS states that the BA should return ACE to 0 within the recovery period for what
percent of reportable disturbances - ANS 100%
\Default disturbance recovery period (time to return ACE to 0 following a disturbance,
DCS) - ANS 15 minutes
\Default ramp rate for for Eastern Interconnection interchange schedules - ANS 10
minutes
\Default ramp rate for Western Interconnection interchange schedules - ANS 20 minutes

, \DOE-417 (disturbance reporting) should be completed by when - ANS 60 minutes
\During EEA2/3 the energy deficient entity needs to update the RC how often until alert is
terminated - ANS 60 minutes/hourly
\During restoration, BES should be operated no more than what percent above or below
nominal voltage profile - ANS 10%
\During restoration, loads should be added in blocks not to exceed what percent of
synchronized generating capability - ANS 5%
\Every 2 years GOP's with blackstart resources shall provide how many hours of training
to operating personnel responsible for startup - ANS 2 hours
\Every 2 years TO/TOP/DSP must provide how many hours of system restoration training
to field switching personnel - ANS 2 hours
\Firm load shedding of how many MW (regardless if manually shed or auto shed) is
reportable by the initiating entity - ANS 100mw
\GO should provide tap settings/ranges and impedance data to TOP & transmission
planner within how long of a request - ANS 30 calendar days
\Good rule of thumb - frequency will sag 0.5Hz for what percent increase in load - ANS
5%
\GOP must notify TOP of change in reactive capability how quick - ANS 30 minutes
\GOP should provide blackstart test results to RC/TOP within how long of request - ANS
30 calendar days
\GOP with blackstart resource must notify TOP of any change to capabilities affecting
ability to meet restoration plan within how long of the change - ANS 24 hours
\Hourly ATC for next 48 hours calculated how often - ANS 60 minutes/hourly
\How long do you need to wait to reuse interchange tag numbers - ANS 12 months
\How long does TOP/RC/BA have to report communication capability failure - ANS 1 hour
\How long must time error corrections last at minimum - ANS 1 hour
\How many hours of emergency operations training must each BA/TOP provide to their
operating personnel - ANS 32 hours
\How often are blackstart resources required to be tested - ANS At least every 3 years
\How often is ATC for next 31 days calculated - ANS 24 hours/daily
\How often should BA calculate and record inadvertent interchange - ANS 60
minutes/hourly
\How often should BA check and calibrate time error and frequency devices against a
common reference - ANS 12 months/annually
\How often should BA provide MW-hour meter readings to adjacent BA's - ANS 60
minutes/hourly
\How soon is the selected unaffiliated third-party reviewing the TO/TOP security plan
required to complete the review - ANS 90 days
\If alternative interpersonal communication testing is unsuccessful, how long does
TOP/BA/RC have to initiate repair or replacement - ANS 2 hours
\If AVR, PSS, or other voltage control device status changes from normal operation, GOP
must notify TOP within how long of the change (if it does not last longer than this, no
reporting necessary) - ANS 30 minutes
\If BA denies interchange, they have how long to notify RC - ANS 10 minutes

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LEWIS12 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
23
Member since
1 year
Number of followers
1
Documents
1013
Last sold
5 days ago

3.3

3 reviews

5
1
4
0
3
1
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions