100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI CONCRETE FIELD-TESTING TECHNICIAN GRADE I 2025 NEWEST VERSION 400+ VERIFIED Q&As

Rating
-
Sold
-
Pages
68
Grade
A+
Uploaded on
11-02-2025
Written in
2024/2025

PART 1 The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - CORRECT ANSWER 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - CORRECT ANSWER 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - CORRECT ANSWER Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - CORRECT ANSWER True The temperature of concrete may be measured in a wall form. True of False - CORRECT ANSWER True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - CORRECT ANSWER False What must be done to the sample container prior to sampling the concrete? - CORRECT ANSWER Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - CORRECT ANSWER Gently press the concrete around the temperature measuring device at the surface of the concrete 2 | P a g e How long must the temperature measuring device remain in the freshly mixed concrete? - CORRECT ANSWER At least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - CORRECT ANSWER Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - CORRECT ANSWER 1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - CORRECT ANSWER Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - CORRECT ANSWER False The sample of concrete used for temperature determination must be rodded 25 times. True or False? - CORRECT ANSWER False Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - CORRECT ANSWER Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - CORRECT ANSWER Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - CORRECT ANSWER 15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - CORRECT ANSWER True 3 | P a g e The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - CORRECT ANSWER 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - CORRECT ANSWER 15 The concrete sample must be protected from contamination and _____. - CORRECT ANSWER Rapid evaporation The minimum size sample for making strength test specimens is _____. - CORRECT ANSWER 28 L (1ft^3) When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - CORRECT ANSWER 2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - CORRECT ANSWER 5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - CORRECT ANSWER 2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - CORRECT ANSWER False The composite samples from a truck mixer must be obtained from the _____ portion of the batch. - CORRECT ANSWER Middle

Show more Read less
Institution
ACI Concrete Field Testing Technician Level 1
Course
ACI Concrete field testing technician level 1











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI Concrete field testing technician level 1
Course
ACI Concrete field testing technician level 1

Document information

Uploaded on
February 11, 2025
Number of pages
68
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACELEARNERS Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
279
Member since
2 year
Number of followers
181
Documents
3569
Last sold
2 weeks ago
ACE LEARNERS

Welcome to ACELEARNERS Professional tutor Experts. We offer exemplary Study guides,Testbanks and Actual Exams to help you excel academically. Our materials are meticulously crafted and cover essential topics. With clear explanations, practice exercises, and comprehensive assessments, you can enhance your understanding and boost your performance. Trust ACELEARNERS for your educational success. Success in your studies. Thank you

4.1

67 reviews

5
35
4
14
3
14
2
0
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions