100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CON 367 MIDTERM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ||ALREADY GRADED A+||NEWEST VERSION

Rating
-
Sold
1
Pages
20
Grade
A+
Uploaded on
09-02-2025
Written in
2024/2025

Quiz: The process of initiating a construction project. Ans: 1. Advertise for bids 2. Open bids 3. Award contract 4. Sign the contract 5. Issue notice to proceed Quiz: Under the Contractor Quality Control (CQC) process, inspection is provided by the contractor Ans: False Quiz: Owners generally engage the services of a professional construction management firm (Agency CM) in fast-track projects with multiple contracts. Ans: True o © 2025 TestTrackers o or call [] o Resources & Updates: [Testtrackers - Stuvia US] o Your Success is Our Mission! o For online exams and tutor expert, please me in the number given. Quiz: A professional construction management firm (Agency CM) can participate in the following phases of a project Ans: Conception, program planning, Design, Construction and Closeout Quiz: The Design-Build (DB) project delivery process may face some barriers when tried to be implemented in the public sector. Ans: True Quiz: In a project with multiple prime contractors, who is responsible for coordinating the various trade contractors? Ans: Owner or its representative (e.g. the construction manager) Quiz: The Resident P

Show more Read less
Institution
CON 367
Course
CON 367










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CON 367
Course
CON 367

Document information

Uploaded on
February 9, 2025
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CON 367 MIDTERM QUESTIONS AND CORRECT
DETAILED ANSWERS (VERIFIED ANSWERS)
||ALREADY GRADED A+||NEWEST VERSION
Quiz: The process of initiating a construction project.

Ans: 1. Advertise for bids

2. Open bids

3. Award contract

4. Sign the contract

5. Issue notice to proceed



Quiz: Under the Contractor Quality Control (CQC) process, inspection is

provided by the contractor

Ans: False



Quiz: Owners generally engage the services of a professional construction

management firm (Agency CM) in fast-track projects with multiple contracts.

Ans: True




o
o
© 2025 TestTrackers
WhatsApp or call o Resources & Updates: [Testtrackers - Stuvia US]
o Your Success is Our Mission!
[+254707240657]
o For online exams and tutor expert, please whatsapp
me in the number given.

, Quiz: A professional construction management firm (Agency CM) can

participate in the following phases of a project

Ans: Conception, program planning, Design, Construction and Closeout



Quiz: The Design-Build (DB) project delivery process may face some barriers

when tried to be implemented in the public sector.

Ans: True



Quiz: In a project with multiple prime contractors, who is responsible for

coordinating the various trade contractors?

Ans: Owner or its representative (e.g. the construction manager)



Quiz: The Resident Project Representative should not direct the contractor's

work.

Ans: True



Quiz: Which of the following is under the authority of the Resident Project

Representative?


o
o
© 2025 TestTrackers
WhatsApp or call o Resources & Updates: [Testtrackers - Stuvia US]
o Your Success is Our Mission!
[+254707240657]
o For online exams and tutor expert, please whatsapp
me in the number given.

, Ans: To approve materials & worksmanship that meet the contract
requirements



Quiz: Routing of submittals from the subcontractor to the Designer

Ans: 1. Subcontractor

2. Contractor

3. Resident Project Representative

4. Project Engineer

5. Design Reviews



Quiz: The Resident Project Representative should obtain the contract

documents and study those as soon as being engaged to provide resident

inspection on a project.

Ans: True



Quiz: The Resident Project Representative does not need to make any

measurement for the progress payments in the lump-sum projects

Ans: False



o
o
© 2025 TestTrackers
WhatsApp or call o Resources & Updates: [Testtrackers - Stuvia US]
o Your Success is Our Mission!
[+254707240657]
o For online exams and tutor expert, please whatsapp
me in the number given.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
JordanBrook NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
231
Member since
1 year
Number of followers
33
Documents
21480
Last sold
5 days ago

3.9

42 reviews

5
21
4
8
3
7
2
1
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions