100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CPESC Section 1 & 2 With A+ Graded And Verified

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
07-02-2025
Written in
2024/2025

CPESC Section 1 & 2 With A+ Graded And Verified

Institution
CPESC Section 1 & 2 With A+ Graded And Verified
Course
CPESC Section 1 & 2 With A+ Graded And Verified









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CPESC Section 1 & 2 With A+ Graded And Verified
Course
CPESC Section 1 & 2 With A+ Graded And Verified

Document information

Uploaded on
February 7, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

CPESC Section 1 & 2 With A+ Graded And Verified
What does the acronym NPDES stand for? - correct answerNational Pollutant Discharge Elimination System
m m m m m m m m m m m m m




True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal
m m m m m m m m m m m m m m m m m




separate storm drain system, to waters of the US. - correct answer2.1.1.6
m m m m m m m m m m m m m




True

What does the acronym TMDL stand for? Define it? - correct answer2.1.1.10
m m m m m m m m m m m m




Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis without
m m m m m m m m m m m m m m m m m m m m




violating applicable water quality standards.
m m m m m




Define TMDL - correct answer2.1.1.10 m m m m m




The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without violating
m m m m m m m m m m m m m m m m m m m m




applicable water quality standards. (Water quality standards usually predetermined by the state.)
m m m m m m m m m m m m




What are the two types of storm-water permits issued under the NPDES Program? - correct answer2.2.1
m m m m m m m m m m m m m m m




1. The Construction General Permit (CGP).
m m m m m




2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m m m




If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - correct answerNo later
m m m m m m m m m m m m m m m m m m m




than seven days after the inspection.
m m m m m m




List three types of pollutants. - correct answer2.1
m m m m m m m




Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances. m m m m m m m m m




List three examples of 'Waters of the United States'. - correct answer2.1.1.6
m m m m m m m m m m m




Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural ponds.
m m m m m m m m m m m m m m




When does the SWPPP need to be completed? - correct answer2.3.6.4
m m m m m m m m m m




Prior to submitting the NOI.
m m m m




When does the EPA's construction permit require inspections? - correct answerEvery 7 days, or within 24 hrs of a storm of
m m m m m m m m m m m m m m m m m m m m




0.5 inches or move in depth.
m m m m m m




What does CPESC stand for? - correct answerCertified Professional in Erosion & Sediment Control
m m m m m m m m m m m m m




What are the two types of Storm Water Permits? - correct answer2.2.1
m m m m m m m m m m m m




1. General: provides umbrella coverage to a large number of applicants.
m m m m m m m m m m




m 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
m m m m m m m m m m m m m m




True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to obtain a permit
m m m m m m m m m m m m m m m m m m m m m m




for the 1/2 acre. - correct answer2.1.1.8
m m m m m m m




False, If it as part of a larger plan of development >1 acre, a permit is required.
m m m m m m m m m m m m m m m m




Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - correct answer2.1.1.2
m m m m m m m m m m m m m m m m m m m m m




-Facilities already covered by a permit m m m m m




-Facilities that engage in industrial activity m m m m m




-Large (>250K pop) MS4s m m m




-Medium (100K250K) MS4s m m




-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
m m m m m m m m m m




Who is responsible for applying for the Storm water permit for a construction site? - correct answer2.3.1
m m m m m m m m m m m m m m m m




The operator of the site, however a owner can apply if the operator has not been identified.
m m m m m m m m m m m m m m m m




What is an NOI? - correct answer2.2.4
m m m m m m




"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
m m m m m m m m m m m m m m m m m m

, List the 6 major phases of a SWPPP for construction activities? - correct answer2.3.6
m m m m m m m m m m m m m




-Site Evaluation/design development (site plan)
m m m m




-Assessment (site area/runoff calc) m m m




-Control selection and plan design (BMPs) m m m m m




-Certification/notification (NOI) m




-Construction/implementation (install/maintenance) m




-Final stabilization/termination (NOT)
m m




What score do you need to pass each section of the test? - correct answer70%
m m m m m m m m m m m m m m




What is the deadline to stabilize a site that wont be redisturbed? - correct answer2.3.6.3
m m m m m m m m m m m m m m m




14 days m




What is the deadline to correct problems found during an inspection? - correct answer2.3.6.5
m m m m m m m m m m m m m m




As soon as possible but no later than 7 days.
m m m m m m m m m




How long do you have to keep copies of the swppp after final stabilization? - correct answer2.3.6.5 (second to last
m m m m m m m m m m m m m m m m m m m




paragraph)
m m




3 years
m




What are the 3 types of enforcement actions EPA has? - correct answer2.3.7
m m m m m m m m m m m m




-Administrative Orders m




-Civil Actions m




-Criminal Prosecutions m




The Federal Water Pollution Control Act was established which year? - correct answer1948
m m m m m m m m m m m m




When was the Federal Water Pollution Control Act amended? What is it called now? - correct answer2.1.1
m m m m m m m m m m m m m m m m




1972 and 1977. Now called the Clean Water Act
m m m m m m m m




Which year was the National Pollutant Discharge Elimination System established? - correct answer2.1.1.2
m m m m m m m m m m m m




1972

What is an MS4? - correct answerMunicipal Separate Storm Sewer System
m m m m m m m m m m




Stormwater is defined under EPA's NPDES rules as . . . - correct answer2.1.1.5
m m m m m m m m m m m m m




Stormwater runoff, snow melt runoff, and surface runoff and drainage.
m m m m m m m m m




Who is allowed to certify the SWPPP? - correct answerThe authorized representative of the site operator, such as the
m m m m m m m m m m m m m m m m m m




president, vice president, or a general partner who has been delegated authority to sign and certify this type of document.
m m m m m m m m m m m m m m m m m m m m




Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - correct answer* Integrity
m m m m m m m m m m m m m m m




* Objectivity
m




* Confidentiality
m




* Competence
m




* Professionalism
m




Who oversees Stormwater Regulations ? - correct answerEPA (US Environmental Protection Agency)
m m m m m m m m m m m




When was the Stormwater Application Rule issued? - correct answerNovember 16th, 1990
m m m m m m m m m m m




When was the Stormwater Implementation Rule enacted and what did it entail? - correct answerApril 1992; minimum
m m m m m m m m m m m m m m m m




requirements for storm water permit terms and conditions
m m m m m m m m




What does the Phase II discharger's include and when were they established? - correct answerPhase II stormwater
m m m m m m m m m m m m m m m m




dischargers generally include "light" industrial facilities, small construction sites (< 5 acres), and small municipalities
m m m m m m m m m m m m m m m




(<100,000 population)
m m




August 1995 m




When was the Multi Sector Model General Permit issued? - correct answerSeptember 1995
m m m m m m m m m m m m
$8.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TESTB

Get to know the seller

Seller avatar
TESTB Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
1 year
Number of followers
0
Documents
251
Last sold
3 weeks ago
SMART B

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions