100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CPESC Section 1 & 2 Questions and Correct Answers Latest Update

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
07-02-2025
Written in
2024/2025

CPESC Section 1 & 2 Questions and Correct Answers Latest Update

Institution
CPESC Section 1 & 2
Course
CPESC Section 1 & 2









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CPESC Section 1 & 2
Course
CPESC Section 1 & 2

Document information

Uploaded on
February 7, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

CPESC Section 1 & 2 Questions and Correct
Answers Latest Update

What does the acronym NPDES stand for? - (correct answer) -National Pollutant Discharge Elimination System
miu miu miu miu miu miu miu miu miu miu miu miu miu miu




True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




municipal separate storm drain system, to waters of the US. - (correct answer) -2.1.1.6
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




True

What does the acronym TMDL stand for? Define it? - (correct answer) -2.1.1.10
miu miu miu miu miu miu miu miu miu miu miu miu miu




Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




without violating applicable water quality standards.
miu miu miu miu miu miu




Define TMDL - (correct answer) -2.1.1.10
miu miu miu miu miu miu




The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




violating applicable water quality standards. (Water quality standards usually predetermined by the state.)
miu miu miu miu miu miu miu miu miu miu miu miu miu




What are the two types of storm-water permits issued under the NPDES Program? - (correct answer) -2.2.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




1. The Construction General Permit (CGP).
miu miu miu miu miu




2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - (correct answer)
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




-No later than seven days after the inspection.
miu miu miu miu miu miu miu miu




List three types of pollutants. - (correct answer) -2.1
miu miu miu miu miu miu miu miu




Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances.
miu miu miu miu miu miu miu miu miu




List three examples of 'Waters of the United States'. - (correct answer) -2.1.1.6
miu miu miu miu miu miu miu miu miu miu miu miu




Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural
miu miu miu miu miu miu miu miu miu miu miu miu miu




ponds.
miu




When does the SWPPP need to be completed? - (correct answer) -2.3.6.4
miu miu miu miu miu miu miu miu miu miu miu




Prior to submitting the NOI.
miu miu miu miu




When does the EPA's construction permit require inspections? - (correct answer) -Every 7 days, or within 24 hrs of
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




a storm of 0.5 inches or move in depth.
miu miu miu miu miu miu miu miu miu




What does CPESC stand for? - (correct answer) -Certified Professional in Erosion & Sediment Control
miu miu miu miu miu miu miu miu miu miu miu miu miu miu




What are the two types of Storm Water Permits? - (correct answer) -2.2.1
miu miu miu miu miu miu miu miu miu miu miu miu miu




1. General: provides umbrella coverage to a large number of applicants.
miu miu miu miu miu miu miu miu miu miu




miu 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu




True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




obtain a permit for the 1/2 acre. - (correct answer) -2.1.1.8
miu miu miu miu miu miu miu miu miu miu miu




False, If it as part of a larger plan of development >1 acre, a permit is required.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - (correct answer) -2.1.1.2
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




-Facilities already covered by a permit miu miu miu miu miu




-Facilities that engage in industrial activity miu miu miu miu miu




-Large (>250K pop) MS4s miu miu miu




-Medium (100K250K) MS4s miu miu




-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS
miu miu miu miu miu miu miu miu miu miu

, Who is responsible for applying for the Storm water permit for a construction site? - (correct answer) -2.3.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




The operator of the site, however a owner can apply if the operator has not been identified.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




What is an NOI? - (correct answer) -2.2.4
miu miu miu miu miu miu miu




"Notice of Intent" to be covered by a general permit in the state in which the facility is located.
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




List the 6 major phases of a SWPPP for construction activities? - (correct answer) -2.3.6
miu miu miu miu miu miu miu miu miu miu miu miu miu miu




-Site Evaluation/design development (site plan)
miu miu miu miu




-Assessment (site area/runoff calc) miu miu miu




-Control selection and plan design (BMPs) miu miu miu miu miu




-Certification/notification (NOI) miu




-Construction/implementation (install/maintenance) miu




-Final stabilization/termination (NOT)
miu miu




What score do you need to pass each section of the test? - (correct answer) -70%
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




What is the deadline to stabilize a site that wont be redisturbed? - (correct answer) -2.3.6.3
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




14 days miu




What is the deadline to correct problems found during an inspection? - (correct answer) -2.3.6.5
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




As soon as possible but no later than 7 days.
miu miu miu miu miu miu miu miu miu




How long do you have to keep copies of the swppp after final stabilization? - (correct answer) -2.3.6.5 (second to
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




last paragraph)
miu miu miu




3 years
miu




What are the 3 types of enforcement actions EPA has? - (correct answer) -2.3.7
miu miu miu miu miu miu miu miu miu miu miu miu miu




-Administrative Orders miu




-Civil Actions miu




-Criminal Prosecutions miu




The Federal Water Pollution Control Act was established which year? - (correct answer) -1948
miu miu miu miu miu miu miu miu miu miu miu miu miu




When was the Federal Water Pollution Control Act amended? What is it called now? - (correct answer) -2.1.1
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




1972 and 1977. Now called the Clean Water Act
miu miu miu miu miu miu miu miu




Which year was the National Pollutant Discharge Elimination System established? - (correct answer) -2.1.1.2
miu miu miu miu miu miu miu miu miu miu miu miu miu




1972

What is an MS4? - (correct answer) -Municipal Separate Storm Sewer System
miu miu miu miu miu miu miu miu miu miu miu




Stormwater is defined under EPA's NPDES rules as . . . - (correct answer) -2.1.1.5
miu miu miu miu miu miu miu miu miu miu miu miu miu miu




Stormwater runoff, snow melt runoff, and surface runoff and drainage.
miu miu miu miu miu miu miu miu miu




Who is allowed to certify the SWPPP? - (correct answer) -The authorized representative of the site operator, such
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




as the president, vice president, or a general partner who has been delegated authority to sign and certify this type
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




of document.
miu miu




Whatare the Fundamentals of the Code of Ethics and Professional Conduct ? - (correct answer) -* Integrity
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




* Objectivity
miu




* Confidentiality
miu




* Competence
miu




* Professionalism
miu




Who oversees Stormwater Regulations ? - (correct answer) -EPA (US Environmental Protection Agency)
miu miu miu miu miu miu miu miu miu miu miu miu




When was the Stormwater Application Rule issued? - (correct answer) -November 16th, 1990
miu miu miu miu miu miu miu miu miu miu miu miu




When was the Stormwater Implementation Rule enacted and what did it entail? - (correct answer) -April 1992;
miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu miu




minimum requirements for storm water permit terms and conditions
miu miu miu miu miu miu miu miu miu
$8.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TESTB

Get to know the seller

Seller avatar
TESTB Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
1 year
Number of followers
0
Documents
251
Last sold
1 month ago
SMART B

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions