100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NERC Update 2024/2025 Questions with Correct Solutions | Latest

Rating
-
Sold
-
Pages
41
Grade
A+
Uploaded on
07-02-2025
Written in
2024/2025

NERC Update 2024/2025 Questions with Correct Solutions | Latest

Institution
NERC
Course
NERC











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
February 7, 2025
Number of pages
41
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC Update 2024/2025 Questions with Correct
Solutions | Latest
The Disturbance Control Standard measures a Balancing Authority's response to a rapid
loss of _____________.


demand for energy.
interchange.
ACE.
supply of energy. - ANSWER supply of energy


A Balancing Authority's largest single contingency is a unit rated at 1,000 MW. Which of
the following disturbances would constitute a reportable disturbance for Disturbance
Control Performance evaluation based on the NERC DCS criteria?


The loss of a 950 MW generating unit at 100% output.
The loss of 3 generating units totaling 1,300 MW over a period of 3 hours.
The loss of a 750 MW generating unit at 100% output.
The loss of 715 MW of firm load. - ANSWER The loss of a 950 MW generating unit at
100% output.


Balancing Authority informs the Reliability Coordinator that the projected load in a
Balancing Area for the next four hours (over the morning peak) is trending above the
available generation that had been committed for the day. Operating Reserves will be
required to be converted into energy to cover the shortfall. Which Energy Emergency
Alert (EEA) level should the RC declare?


No EEA should be declared until load shed is expected.

,EEA 1
EEA 2
EEA 3 - ANSWER EEA 1


A Balancing Authority anticipating an operating capacity or energy emergency shall
perform all actions necessary which includes:


Bringing on all available generation
All answers are correct
Preparing to reduce firm load
Postponing equipment maintenance - ANSWER All answers are correct


As a Transmission Operator, you realize that the voltage level is starting to decline in the
North West part of the system. Which of the following devices should you, as a
Transmission Operator, be able to operate, and/or have another entity operate to raise
the voltage level back to normal in the North West part of the system?


Generator Reactive Output
Transformer Underload Tap Changers
All answers are correct
Shunt Capacitor Banks - ANSWER All answers are correct


If a Balancing Authority, Reserve Sharing Group is experiencing conditions where all
available resources are committed to meet firm load, firm transactions, and reserve
commitments, what does the deficient entity need to request their Reliability
Coordinator to issue?


Energy Emergency Warning

,Energy Emergency Alert Level 2
Energy Emergency Alert Level 3
Energy Emergency Alert Level 1 - ANSWER Energy Emergency Alert Level 1


One of the functions of underfrequency load shedding is to ______________ within an
electrical island that may have been created by a system disturbance.


establish balance between load and interchange
balance generation and load
stabilize balance between generators
stabilize the Interconnection - ANSWER balance generation and load


A Balancing Authority that is operating asynchronously (separated from the
Interconnection) should switch its AGC to which mode __________.


flat frequency control
tie line bias control
manual control
flat tie-line control - ANSWER flat frequency control


During a system restoration, what is the system operators priority?


Interconnection frequency
Restoration of customer load
Restoration of interchange
Restoration of off-site startup power to generating facilities - ANSWER Restoration of
off-site startup power to generating facilities

, If multiple lines trip resulting in parallel lines overloading and voltage decreasing, the
system operator should first consider which mitigating actions?




Re-dispatch or bring on additional generation
Shed load to reduce the powerflow on the overloaded lines
Open the line breakers to the overloaded lines.
Curtail Interchange Scheduled to the low voltage area - ANSWER Re-dispatch or bring on
additional generation


A Balancing Authority foresees or is experiencing conditions where all available
resources are committed to meet firm load, firm transactions. The BA should request
which level of the Energy Emergency Alerts?


Energy Emergency Alert Level 1
Energy Emergency Alert Level 4
Energy Emergency Alert Level 2
Energy Emergency Alert Level 3 - ANSWER Energy Emergency Alert Level 1


The System Operator experiences a major transmission system disturbance which
results in a large loss of load. Which of the following results is most likely to occur?


an increase in system frequency
an increase in system voltage in a wide-area
a decrease in system voltage
a decrease in system frequency - ANSWER an increase in system frequency

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER New York College Of Dentistry
View profile
Follow You need to be logged in order to follow users or courses
Sold
344
Member since
2 year
Number of followers
104
Documents
38429
Last sold
6 days ago

3.5

58 reviews

5
26
4
8
3
7
2
1
1
16

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions