100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Walmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification. Exam Questions With Correct Answers 100% Verified.

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
07-02-2025
Written in
2024/2025

©THESTAR 2024/2025 ALL RIGHTS RESERVED 11:32AM. A+ 1 Walmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification. Exam Questions With Correct Answers 100% Verified. The 1970's law that set into place the regulation of stormwater is: -the federal pollution discharge elimination rule -the stormwater pollution control act -the national water control act -the clean water act - Answerthe clean water act Requirements for managing stormwater activity on a construction site are outlined in the following regulation -NOI -NPDES -NOT -DOT - AnswerNPDES Which of the following is never an allowable stormwater discharge from a construction site? -discharge from burrow areas -discharge from contaminated groundwater -discharge from dewatering activities -discharge from staging areas - Answerdischarge from contaminated groundwater The notice of termination can be filed when ©THESTAR 2024/2025 ALL RIGHTS RESERVED 11:32AM. A+ 2 -general contractor applies seed and mulch near the end of the project -at the end of rainy season -all construction activity, inside and outside the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements -only offsite street work is left - Answerall construction activity, inside and outside the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements Relative to stormwater permitting, all of the following must occur before construction starts except -prepare the SWPPP -determine the operator(s) -submit the notice of intent (NOI) -submit the notice of termination (NOT) - Answersubmit the notice of termination (NOT) The stormwater notice of intent (NOI) must be submitted -after the sediment discharge -after the SWPPP is prepared and before starting construction -after stormwater BMPs have been installed - after stormwater inspectors issue a violation - Answerafter the SWPPP is prepared and before starting construction Potential pollutant source stored on a construction site may include -petroleum storage tanks -soil amendments -masonry materials -all of the above - Answerall of the above The SWPPP implementation sequence may be modified -as the qualified inspector deems

Show more Read less
Institution
Walmart / Sam\\\'s Safety, Employment, Waste
Course
Walmart / Sam\\\'s Safety, Employment, Waste









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Walmart / Sam\\\'s Safety, Employment, Waste
Course
Walmart / Sam\\\'s Safety, Employment, Waste

Document information

Uploaded on
February 7, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

©THESTAR 2024/2025 ALL RIGHTS RESERVED 11:32AM. A+




Walmart / Sam's Safety, Employment, Waste,
Stormwater Compliance Certification. Exam
Questions With Correct Answers 100%
Verified.


The 1970's law that set into place the regulation of stormwater is:
-the federal pollution discharge elimination rule
-the stormwater pollution control act
-the national water control act

-the clean water act - Answer✔the clean water act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation
-NOI
-NPDES
-NOT

-DOT - Answer✔NPDES
Which of the following is never an allowable stormwater discharge from a construction site?
-discharge from burrow areas
-discharge from contaminated groundwater
-discharge from dewatering activities

-discharge from staging areas - Answer✔discharge from contaminated groundwater
The notice of termination can be filed when


1

, ©THESTAR 2024/2025 ALL RIGHTS RESERVED 11:32AM. A+


-general contractor applies seed and mulch near the end of the project
-at the end of rainy season
-all construction activity, inside and outside the building, is complete and permanent
stabilization has been verified as adequate to meet permit requirements

-only offsite street work is left - Answer✔all construction activity, inside and outside the
building, is complete and permanent stabilization has been verified as adequate to meet permit
requirements
Relative to stormwater permitting, all of the following must occur before construction starts
except
-prepare the SWPPP
-determine the operator(s)
-submit the notice of intent (NOI)

-submit the notice of termination (NOT) - Answer✔submit the notice of termination (NOT)
The stormwater notice of intent (NOI) must be submitted
-after the sediment discharge
-after the SWPPP is prepared and before starting construction
-after stormwater BMPs have been installed

- after stormwater inspectors issue a violation - Answer✔after the SWPPP is prepared and
before starting construction
Potential pollutant source stored on a construction site may include
-petroleum storage tanks
-soil amendments
-masonry materials

-all of the above - Answer✔all of the above
The SWPPP implementation sequence may be modified
-as the qualified inspector deems necessary
-after consulting with the project SWPPP designer (CEC) and, if required, the project owner and
receiving written approval
-it you experience a rain event on your project site

2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
619
Member since
2 year
Number of followers
179
Documents
24416
Last sold
1 hour ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

123 reviews

5
58
4
22
3
22
2
4
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions