Critical Path Analysis
Task Activity Order Length (Weeks)
A Team Designation Starting Activity 2
B Team Meetings Begin when Task A is complete 3
C Planning Begin when Task B is complete 4
D Preparations Begin when Task C is complete 1
This is the second assignment for Unit 28- Business Project Management. This assignment contains two different contingency plans needed to pass this criteria. I achieved a DISTINCTION in this assignment and an overall grade of D*D*D* (highest grade possible) Please DO NOT copy, but please use it as a guide as it will help you pass. Good Luck with your course!
All reviews are made by real Stuvia users after verified purchases.
Complete Assignments for BTEC Level 3 90 Credit Diploma (D*D*) and BTEC Level 3 Extended Diploma in Business (D*D*D*). I achieved the highest grade possible with all these assignments so use them as a guide and you are guaranteed to pass with flying colours.
Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.
No worries! You can instantly pick a different document that better fits what you're looking for.
No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.
“Bought, downloaded, and aced it. It really can be that simple.”