Public works inspection test 3
APWA
Updated Version
Before permitting the contractor to proceed, the inspector should check that the plans have been approved
j j j j j j j j j j j j j j j
and signed by the engineer -
j j j j j j j
There are four major problem areas in sewer construction which can cause future functional problems and
j j j j j j j j j j j j j j j
expense: poor pipe sub grade, poor joints, poor water consolidation or mechanical compaction of backfill
j j j j j j j j j j j j j j j
and poor records -
j j j j j
Balling a line-The operation of passing an inflated rubber ball, which is slightly less than the diameter of the
j j j j j j j j j j j j j j j j j j
pipe, though a sewer line -
j j j j j j j
House connection sewer- house connection sewers are sometimes referred to as lateral sewer -
j j j j j j j j j j j j j j
Invert- a line on centerline at the inside bottom of a pipe or conduit, also commonly referred to as the flow
j j j j j j j j j j j j j j j j j j j j
line -
j j j
Saddle- a connections to a mainline sewer where no wye or tee exists, made by breaking into it and attaching
j j j j j j j j j j j j j j j j j j j
a specially fabricated spur pipe -
j j j j j j j
Spring line- a circular pipe filled with water to its spring line would be half full -
j j j j j j j j j j j j j j j j j
Soffit- the inside top of a pipe or box-section conduit -
j j j j j j j j j j j
One of the most important elements of excavating for sewer construction is to maintain the specified width
j j j j j j j j j j j j j j j j
of the trench at the top of the pipe -
j j j j j j j j j j j
,Although off centered pipe in the trench is not desirable, it is permitted provided the maximum allowable
j j j j j j j j j j j j j j j j
trench width is not exceeded -
j j j j j j j
Loose material in the bottom of the trench must be removed to solid, undisturbed ground before pipe
j j j j j j j j j j j j j j j j
bedding is placed -
j j j j j
OSHA construction safety orders give minimum requirements - -beware of disturbed ground
j j j j j j j j j j j
-take special precautions where moisture is present
j j j j j j j
-guard against cabing hazard created by vibration and load from highway traffic
j j j j j j j j j j j
-install upper trench jacks first j j j j
-protect all workers in trenches j j j j
Dewatering-ground water may be pumped and discharged into a storm drain or sewer only if so allowed by j j j j j j j j j j j j j j j j j
the storm drain or sewer owner and jurisdiction water quality agency -
j j j j j j j j j j j j j
Survey procedures are established to set stakes for sewer construction on an offset line at intervals of 25
j j j j j j j j j j j j j j j j j
feet -
j j j
Grade sheet details should be read with extreme care -
j j j j j j j j j j
If excessively wet, soft, spongy, unstable or similarly unsuitable material is encountered at the pipe bedding
j j j j j j j j j j j j j j j
depth, the unsuitable material must be removed and be replaced with imported bedding material to
j j j j j j j j j j j j j j j
provide a stable foundation -
j j j j j j
Adequate measures must be taken to avoid floating the pipe or to deflect it laterally when placing and
j j j j j j j j j j j j j j j j j
consolidating the concrete -
j j j j j
Pipe Laying and Jointing- The inspector must check the plans for locations of tees and wyes for house
j j j j j j j j j j j j j j j j j
connections. Tees should be located at the station or to the nearest joint downstream of the house
j j j j j j j j j j j j j j j j j
connection end -
j j j j
All bell and spigot pipe should be laid upgrade, with the bell ends of the pipe pointed upstream -
j j j j j j j j j j j j j j j j j j j
, A line should be pulled across a minimum of three pipes or stations for the line and grade check -
j j j j j j j j j j j j j j j j j j j j
As a general rule, concrete bottom slabs for manholes will be placed at least 24 hrs before any brick is laid
j j j j j j j j j j j j j j j j j j j j
there on -
j j j j
Improperly placed stubs require expensive manhole remodeling when future sewers are constructed. Steps
j j j j j j j j j j j j
are not installed, maintenance forces use portable ladders -
j j j j j j j j j j
The jet pipe should be kept at least 2 ft away from the pipeline since the bedding maybe washed from under
j j j j j j j j j j j j j j j j j j j j
the pipe -
j j j j
Procedural requirements- permanent resurfacing will normally be withheld pending completion of the air
j j j j j j j j j j j j
test -
j j j
Local depressions- a warped surface of gutter or pavement which diverts water flow more efficiently into an
j j j j j j j j j j j j j j j j
adjacent catch basin inlet -
j j j j j j
Longitudinal seams should be placed at the sides of the pipe - j j j j j j j j j j j j
Stulls or struts are required to support the arch of CMP during the placement and compaction of backfill -
j j j j j j j j j j j j j j j j j j j
Bushing- Protect cable or conductor insulation from damage j j j j j j j j
Conduit- a metal tube in which electric conductors are installed for protection
j j j j j j j j j j j j
Electrolier-street light assembly complete, including foundation, electrolier standard, luminaire arm, j j j j j j j j j
luminaire, etc
j j
Luminaire- the lamp housing including the optical and socket assemblies(and ballast if so specified)
j j j j j j j j j j j j j
APWA
Updated Version
Before permitting the contractor to proceed, the inspector should check that the plans have been approved
j j j j j j j j j j j j j j j
and signed by the engineer -
j j j j j j j
There are four major problem areas in sewer construction which can cause future functional problems and
j j j j j j j j j j j j j j j
expense: poor pipe sub grade, poor joints, poor water consolidation or mechanical compaction of backfill
j j j j j j j j j j j j j j j
and poor records -
j j j j j
Balling a line-The operation of passing an inflated rubber ball, which is slightly less than the diameter of the
j j j j j j j j j j j j j j j j j j
pipe, though a sewer line -
j j j j j j j
House connection sewer- house connection sewers are sometimes referred to as lateral sewer -
j j j j j j j j j j j j j j
Invert- a line on centerline at the inside bottom of a pipe or conduit, also commonly referred to as the flow
j j j j j j j j j j j j j j j j j j j j
line -
j j j
Saddle- a connections to a mainline sewer where no wye or tee exists, made by breaking into it and attaching
j j j j j j j j j j j j j j j j j j j
a specially fabricated spur pipe -
j j j j j j j
Spring line- a circular pipe filled with water to its spring line would be half full -
j j j j j j j j j j j j j j j j j
Soffit- the inside top of a pipe or box-section conduit -
j j j j j j j j j j j
One of the most important elements of excavating for sewer construction is to maintain the specified width
j j j j j j j j j j j j j j j j
of the trench at the top of the pipe -
j j j j j j j j j j j
,Although off centered pipe in the trench is not desirable, it is permitted provided the maximum allowable
j j j j j j j j j j j j j j j j
trench width is not exceeded -
j j j j j j j
Loose material in the bottom of the trench must be removed to solid, undisturbed ground before pipe
j j j j j j j j j j j j j j j j
bedding is placed -
j j j j j
OSHA construction safety orders give minimum requirements - -beware of disturbed ground
j j j j j j j j j j j
-take special precautions where moisture is present
j j j j j j j
-guard against cabing hazard created by vibration and load from highway traffic
j j j j j j j j j j j
-install upper trench jacks first j j j j
-protect all workers in trenches j j j j
Dewatering-ground water may be pumped and discharged into a storm drain or sewer only if so allowed by j j j j j j j j j j j j j j j j j
the storm drain or sewer owner and jurisdiction water quality agency -
j j j j j j j j j j j j j
Survey procedures are established to set stakes for sewer construction on an offset line at intervals of 25
j j j j j j j j j j j j j j j j j
feet -
j j j
Grade sheet details should be read with extreme care -
j j j j j j j j j j
If excessively wet, soft, spongy, unstable or similarly unsuitable material is encountered at the pipe bedding
j j j j j j j j j j j j j j j
depth, the unsuitable material must be removed and be replaced with imported bedding material to
j j j j j j j j j j j j j j j
provide a stable foundation -
j j j j j j
Adequate measures must be taken to avoid floating the pipe or to deflect it laterally when placing and
j j j j j j j j j j j j j j j j j
consolidating the concrete -
j j j j j
Pipe Laying and Jointing- The inspector must check the plans for locations of tees and wyes for house
j j j j j j j j j j j j j j j j j
connections. Tees should be located at the station or to the nearest joint downstream of the house
j j j j j j j j j j j j j j j j j
connection end -
j j j j
All bell and spigot pipe should be laid upgrade, with the bell ends of the pipe pointed upstream -
j j j j j j j j j j j j j j j j j j j
, A line should be pulled across a minimum of three pipes or stations for the line and grade check -
j j j j j j j j j j j j j j j j j j j j
As a general rule, concrete bottom slabs for manholes will be placed at least 24 hrs before any brick is laid
j j j j j j j j j j j j j j j j j j j j
there on -
j j j j
Improperly placed stubs require expensive manhole remodeling when future sewers are constructed. Steps
j j j j j j j j j j j j
are not installed, maintenance forces use portable ladders -
j j j j j j j j j j
The jet pipe should be kept at least 2 ft away from the pipeline since the bedding maybe washed from under
j j j j j j j j j j j j j j j j j j j j
the pipe -
j j j j
Procedural requirements- permanent resurfacing will normally be withheld pending completion of the air
j j j j j j j j j j j j
test -
j j j
Local depressions- a warped surface of gutter or pavement which diverts water flow more efficiently into an
j j j j j j j j j j j j j j j j
adjacent catch basin inlet -
j j j j j j
Longitudinal seams should be placed at the sides of the pipe - j j j j j j j j j j j j
Stulls or struts are required to support the arch of CMP during the placement and compaction of backfill -
j j j j j j j j j j j j j j j j j j j
Bushing- Protect cable or conductor insulation from damage j j j j j j j j
Conduit- a metal tube in which electric conductors are installed for protection
j j j j j j j j j j j j
Electrolier-street light assembly complete, including foundation, electrolier standard, luminaire arm, j j j j j j j j j
luminaire, etc
j j
Luminaire- the lamp housing including the optical and socket assemblies(and ballast if so specified)
j j j j j j j j j j j j j