100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI Certification Test. All Revision Questions and Correct Answers (Already Graded A+) (2024 Update) 100% Guarantee

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
05-02-2025
Written in
2024/2025

ACI Certification Test. All Revision Questions and Correct Answers (Already Graded A+) (2024 Update) 100% Guarantee

Institution
ACI Certification
Course
ACI Certification










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI Certification
Course
ACI Certification

Document information

Uploaded on
February 5, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI Certification Test. All Revision Questions and Correct Answers (Already Graded A+)
(2024 Update) 100% Guarantee




C1064/C1064M - ANSWER- Standard test method for temperature for concrete



C172/C172M - ANSWER- Standard practice for sampling concrete



C143/C143M - ANSWER- Standard testing for Slump



C138/C138M - ANSWER- Standard test method for Density (unit weight), yield, and air
content (Gravimetric)


C231/C231M - ANSWER- Standard test method for Air Content (Pressure Method)



C173/C173M - ANSWER- Standard test method for Air Content (Volumetric Method)



C31/C31M - ANSWER- Stand Practice for making and curing conrete test specimens in field


C1064/C1064M
The end of hte temperature sensing portion of hte temperature measuring device is submerged a
minimum of _______ or _______" into the freshly mixed concrete - ANSWER- 75mm or 3"


C1064/C1064M
The Temperature measuring device shall be capable of accurately measuring hte temperature of
Freshly mixed concrete to _________ throughout a range of _________ - ANSWER- 0.5
degree C (1 degree F) and 50 degree C (30fF - 120F)


C1064/C1064M

,The temperature measuring device shall be verified___________, or whenever there is a question
of___________ - ANSWER- Annually or Accuracy


C1064/C1064M

The temperature of concrete may be measured in a wheelbarrow T/F? - ANSWER- True


C1064/C1064M

The temperature of concrete may be measured in a wall form T/F - ANSWER- True


C1064/C1064M
A composite sample of concrete is required EVEN if the only purpose for obtaining hte sample is
to determine the temperature T/F - ANSWER- False


C1064/C1064M

What must be done to the sample container prior to sampling hte concrete - ANSWER-
Dampened (With Water)


C1064/C1064M
What must be done to the concrete surrounding the temperature masuring device after the device
is submerged in the fresh concrete? - ANSWER- Gently press the concrete around the
temperature masuring device at the surface of the concrete


C1064/C1064M
How long must the temperature measuring device remain in the freshly mixed concrete? -
ANSWER- 2 min, no more than 5 min


C1064/C1064M

After the temperature of the concrete is read, what is then required - ANSWER- Recording the
Temperature

, C1064/C1064M

The temperature of the concrete is reported to the nearest - ANSWER- 0.5 degree C (1 degree
F)


C1064/C1064M
According to the test method C1064/C1064M, what is one reason to take the temperature of the
concrete - ANSWER- Verify conformance to specified requirement for temperature of concrete


C1064/C1064M
A maximum temperature of Freshly mixed concrete is specified in Test method of C1064/C1064M
- ANSWER- FALSE, its in the spec from the owner


C1064/C1064M
The sample of concrete used for temperature determination must be rodded 25 times T/F -
ANSWER- FALSE


C172/C172M
Sampling by this practice covers procedures for obtaining representative samples, on which test
are to be performed to determine______________ with quality requirements of the specifications
under which concrete is furnished - ANSWER- Compliance


C172/C172M
This practice covers sampling from five types of equipment, which are ___________,
______________, ___________,_____________, and ____________ - ANSWER- Stationary
mixers, paving mixers, revolving drum mixers, continous mixers, and open top mixers


C172/C172M
The elapsed time between obtaining the first and final portion of a composite sample shall not
exceed ________- - ANSWER- 15 minutes


C172/C172M

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LECTpharis California University Of Pennsylvania
View profile
Follow You need to be logged in order to follow users or courses
Sold
29
Member since
2 year
Number of followers
2
Documents
4264
Last sold
1 month ago
The Valedictorians' Hub

Get well-researched exam revision papers with correct answers for A+ grades.

5.0

5 reviews

5
5
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions