100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Wisconsin (WI) UTILITY CONTRACTOR Exam

Rating
-
Sold
3
Pages
241
Grade
A+
Uploaded on
05-02-2025
Written in
2024/2025

The Wisconsin Utility Contractor exam is for individuals seeking to become licensed contractors in the installation and maintenance of utility systems, such as water, sewer, and gas lines. The exam evaluates knowledge of construction techniques, Wisconsin’s utility regulations, safety standards, and the ability to manage large-scale utility installation projects. Candidates must demonstrate expertise in both residential and commercial utility contracting practices.

Show more Read less
Institution
Computers
Course
Computers











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Computers
Course
Computers

Document information

Uploaded on
February 5, 2025
Number of pages
241
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Wisconsin (WI) UTILITY CONTRACTOR Exam

1. Under Wisconsin Administrative Code SPS 302, what are fees primarily related to?
A. Licensing renewal
B. Safety and professional services
C. Building permits
D. Property taxes
Answer: B. Safety and professional services
Explanation: SPS 302 specifically covers fees associated with safety protocols and
professional services, ensuring that contractors adhere to safety guidelines and maintain
professional standards.


2. According to SPS 305, which of the following is required for a utility contractor to
obtain a license?
A. Proof of citizenship
B. Completion of a recognized apprenticeship or equivalent experience
C. Purchase of insurance only
D. No prior experience required
Answer: B. Completion of a recognized apprenticeship or equivalent experience
Explanation: SPS 305 outlines licensing requirements which include documented
experience, such as completing an apprenticeship, to qualify for a utility contractor license.


3. SPS 381-387 codes primarily deal with which of the following?
A. Electrical wiring
B. Plumbing codes
C. Roofing materials
D. HVAC installation
Answer: B. Plumbing codes
Explanation: The SPS 381-387 range encompasses plumbing definitions, design principles,
installation standards, and codes in Wisconsin.


4. What is the main focus of Wisconsin Statute Chapter 145 in relation to utility
contractors?
A. Licensing of electricians
B. Environmental regulations
C. Plumbing regulations and roles of licensed professionals
D. Real estate law
Answer: C. Plumbing regulations and roles of licensed professionals
Explanation: Wisconsin Statute Chapter 145 pertains to plumbing regulations and outlines
the roles, responsibilities, and requirements for licensed professionals in the plumbing
industry.


5. A utility contractor in Wisconsin must comply with SPS 305 by providing
documentation of which of the following for licensing?

1

, Wisconsin (WI) UTILITY CONTRACTOR Exam

A. Financial statements
B. Experience in relevant trade
C. List of clients
D. Marketing plan
Answer: B. Experience in relevant trade
Explanation: SPS 305 emphasizes the need for documented relevant trade experience to
demonstrate competence and eligibility for licensing.


6. Under SPS 302, when a fee is collected for safety services, what is the most likely use
of these funds?
A. To fund local schools
B. To improve workplace safety standards and inspections
C. To reduce property taxes
D. To pay off state debt
Answer: B. To improve workplace safety standards and inspections
Explanation: Fees collected under SPS 302 are specifically used to enhance safety protocols
and carry out necessary inspections to enforce safety standards.


7. Which section of Wisconsin Administrative Codes would you refer to for plumbing
installation standards?
A. SPS 302
B. SPS 305
C. SPS 381-387
D. Statute Chapter 145
Answer: C. SPS 381-387
Explanation: SPS 381-387 includes comprehensive plumbing codes, including installation
standards and design guidelines.


8. What is one of the professional responsibilities outlined in Wisconsin Statute Chapter
145 for licensed plumbers?
A. Acting as legal representatives for clients
B. Ensuring compliance with state plumbing codes
C. Designing residential homes
D. Installing electrical panels
Answer: B. Ensuring compliance with state plumbing codes
Explanation: Licensed plumbers, as defined under Chapter 145, must adhere to and enforce
state plumbing codes to ensure safety and compliance.


9. Which of the following best describes SPS 305’s requirement regarding licensing for
utility contractors?
A. It provides a list of banned materials.
B. It specifies minimum age and experience requirements for licensure.

2

, Wisconsin (WI) UTILITY CONTRACTOR Exam

C. It covers tax reporting guidelines.
D. It outlines marketing regulations.
Answer: B. It specifies minimum age and experience requirements for licensure.
Explanation: SPS 305 spells out eligibility criteria for licensing, which includes age,
experience, and other qualifications necessary to obtain and maintain a license.


10. In the context of plumbing codes within SPS 381-387, what does “backflow
prevention” refer to?
A. Directing wastewater back into the environment
B. Preventing contaminated water from reversing flow into potable systems
C. The reversal of electrical current
D. None of the above
Answer: B. Preventing contaminated water from reversing flow into potable systems
Explanation: Backflow prevention is a critical plumbing standard designed to protect
potable water supplies from contamination by reversing flows.


11. According to SPS 302, why are fees for safety services essential?
A. To pay for advertising campaigns
B. To fund educational programs for contractors
C. To ensure contractors have access to safety resources and inspections
D. To subsidize utilities for low-income families
Answer: C. To ensure contractors have access to safety resources and inspections
Explanation: Fees collected under SPS 302 support safety initiatives, resources, and
inspections crucial for contractor compliance.


12. What kind of professional does Wisconsin Statute Chapter 145 primarily govern?
A. Electrical engineers
B. Architects
C. Licensed plumbers
D. Commercial painters
Answer: C. Licensed plumbers
Explanation: Chapter 145 outlines regulations, licensing, and professional standards
specifically for the plumbing industry and its licensed practitioners.


13. A utility contractor must consult SPS 381-387 for guidance on which topic?
A. Drafting legal contracts
B. Plumbing fixture installation standards
C. Marketing strategies
D. Landscaping practices




3

, Wisconsin (WI) UTILITY CONTRACTOR Exam

Answer: B. Plumbing fixture installation standards
Explanation: SPS 381-387 provides detailed codes about plumbing installations, including
correct procedures for installing various plumbing fixtures.


14. SPS 305 outlines requirements for licensing in Wisconsin. Which of these is likely to
be included in these requirements?
A. A portfolio of completed artwork
B. Proof of financial investment in local businesses
C. Evidence of knowledge in safety and plumbing codes
D. Membership in a social club
Answer: C. Evidence of knowledge in safety and plumbing codes
Explanation: To obtain a utility contractor license under SPS 305, one must demonstrate
knowledge and experience in relevant areas such as safety and plumbing codes.


15. If a licensed plumber fails to adhere to the standards set in SPS 381-387, which
statute might be relevant for disciplinary action?
A. SPS 302
B. SPS 305
C. Wisconsin Statute Chapter 145
D. None of the above
Answer: C. Wisconsin Statute Chapter 145
Explanation: Chapter 145 governs professional conduct and standards for plumbers, so non-
compliance with installation standards can result in disciplinary measures under this statute.


16. What is a key purpose of the definitions provided in SPS 381-387?
A. To interpret weather patterns
B. To standardize plumbing terminology across projects
C. To regulate employment contracts
D. To classify types of property
Answer: B. To standardize plumbing terminology across projects
Explanation: Clear definitions in plumbing codes ensure that all professionals understand
and adhere to uniform standards and terminology, aiding in proper design and installation.


17. How does SPS 302 affect utility contractors specifically?
A. It sets environmental guidelines
B. It requires payment of fees that fund safety inspections relevant to contractor work
C. It mandates advertising practices
D. It regulates union membership
Answer: B. It requires payment of fees that fund safety inspections relevant to contractor
work
Explanation: SPS 302 involves fees that support safety inspections and protocols, directly
affecting contractors who must comply with these safety requirements.

4

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nikhiljain22 EXAMS
View profile
Follow You need to be logged in order to follow users or courses
Sold
812
Member since
1 year
Number of followers
30
Documents
19531
Last sold
4 hours ago

3.5

187 reviews

5
60
4
43
3
41
2
11
1
32

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions