Which of the following would be considered a prime contractor? - (answers)A
contractor with whom the project owner has established a contract
Which of the following correctly identifies which is included in legitimate labor
costs? - (answers)Hourly wages, fringe benefit packages, payroll taxes,
insurance and safety costs, and small tools and consumables
Which of the following best illustrates the PRIMARY role of a foreman? -
(answers)to effectively manage and lead the crew
As a foreman what should ALWAYS be your FIRST priority when planning for a
job? - (answers)to effectively manage and lead the crew
which of the following is involved in pre-construction planning? -
(answers)developing a job strategy before the job begins
which of the following describe the purpose of "Short interval planning"? -
(answers)breaking the job into small manageable pieces
which of the following is the FIRST thing a foreman must do before beginning
to plan a job? - (answers)read all project related documents
Which of the following provides the BEST examples of prefabriaction? -
(answers)to create a product in the shop and install it in the field
, 2
Which of the following is NOT required on a daily log? - (answers)the work
completed by individual crew members
Which of the following is NOT likely to lead to improved material handling? -
(answers)have all material and equipment delivered at the beginning of the job
Which of the following purchasing procedures is MOST likely to reduce material
handling time? - (answers)bag and tag all materials as appropriate
What should a foreman do if damage to a shipment is discovered AFTER the
delivery driver has left the job site? - (answers)notify the project manager and
note the damage on the daily log
Which of the following locations represents the BEST place to store job site
materials in a manner that enhances productivity? - (answers)as close to the
point of installation as possible
which of the following costs should a foreman be MOST concerned? -
(answers)labor
Which of the following is NOT considered a direct job cost? - (answers)home
office overhead
An ____________ occurs when any condition or document modifies the work
as defined in the contract documents during the bidding process. -
(answers)addendum